Elwood Union Free School District Preliminary Energy Analysis For an Energy Performance Contract December 12, 2014 Facilities Committee Meeting
Elwood Union Free School District Preliminary Energy Analysis For - - PowerPoint PPT Presentation
Elwood Union Free School District Preliminary Energy Analysis For - - PowerPoint PPT Presentation
Elwood Union Free School District Preliminary Energy Analysis For an Energy Performance Contract December 12, 2014 Facilities Committee Meeting Elwood School District BRIARCLIFF MANOR NY $440 K CT WESTCHESTER WESTCHESTER WESTCHESTER
10 10 10 10 10 10 10 10 10 20 20 20 20 20 20 20 20 20 miles miles miles miles miles miles miles miles miles
NY CT
PLAINVIEW-OLD BETHPAGE $2,993 K BETHPAGE BETHPAGE BETHPAGE BETHPAGE BETHPAGE BETHPAGE BETHPAGE BETHPAGE BETHPAGE $2,880 K $2,880 K $2,880 K $2,880 K $2,880 K $2,880 K $2,880 K $2,880 K $2,880 K GLEN COVE GLEN COVE GLEN COVE GLEN COVE GLEN COVE GLEN COVE GLEN COVE GLEN COVE GLEN COVE CITY CITY CITY CITY CITY CITY CITY CITY CITY $8,327 K $8,327 K $8,327 K $8,327 K $8,327 K $8,327 K $8,327 K $8,327 K $8,327 K EAST ROCKAWAY $1,199 K LAWRENCE $2,990 K EAST MEADOW $5,975 K MINEOLA $2,851 K BALDWIN $2,354 K GARDEN CITY $1,688 K CARLE PLACE $2069 K WESTBURY WESTBURY WESTBURY WESTBURY WESTBURY WESTBURY WESTBURY WESTBURY WESTBURY $3,816 K $3,816 K $3,816 K $3,816 K $3,816 K $3,816 K $3,816 K $3,816 K $3,816 K HERRICKS $4,000 K MASSAPEQUA $8,031 K WANTAGH $1,061 K PORT WASHINGTON PORT WASHINGTON PORT WASHINGTON PORT WASHINGTON PORT WASHINGTON PORT WASHINGTON PORT WASHINGTON PORT WASHINGTON PORT WASHINGTON $2,794 K $2,794 K $2,794 K $2,794 K $2,794 K $2,794 K $2,794 K $2,794 K $2,794 K KINGS PARK $3088 K SMITHTOWN $7,700 K EAST HAMPTON $283 K SOUTHAMPTON $2,192 K LINDENHURST $5,242 WESTHAMPTON BEACH $1,158 K HAMPTON BAYS $718 K SACHEM $3,142 K SOUTH MANOR $2,207 K SHOREHAM-WADING RIVER $4,500 K TUCKAHOE $800 K RYE CITY $683 K BRIARCLIFF MANOR $440 K SEAFORD $3,300 K ISLIP $3,500 K HAUPPAUGE $2,600 K
WESTCHESTER WESTCHESTER WESTCHESTER WESTCHESTER WESTCHESTER WESTCHESTER WESTCHESTER WESTCHESTER WESTCHESTER WESTCHESTER NASSAU NASSAU NASSAU NASSAU NASSAU NASSAU NASSAU NASSAU NASSAU NASSAU
WEST ISLIP $8,200 K
SUFFOLK SUFFOLK SUFFOLK SUFFOLK SUFFOLK SUFFOLK SUFFOLK SUFFOLK SUFFOLK SUFFOLK
COMSEWOGUE $3,200K LOCUST LOCUST LOCUST LOCUST LOCUST LOCUST LOCUST LOCUST LOCUST VALLEY VALLEY VALLEY VALLEY VALLEY VALLEY VALLEY VALLEY VALLEY $3,000K $3,000K $3,000K $3,000K $3,000K $3,000K $3,000K $3,000K $3,000K THREE VILLAGE- $11,600 K YONKERS $5,600 K NORTH BELLMORE $3,200 K SCARSDALE $7,500 K CONNETQUOT $11,300 K
ELWOOD ELWOOD ELWOOD ELWOOD ELWOOD ELWOOD ELWOOD ELWOOD ELWOOD
∗ ∗ ∗ ∗ ∗ ∗ ∗ ∗ ∗
JCI GIS Solutions 11-12-2007
Elwood School District
FIM #1: Lighting Upgrade & Occupancy Sensors
High School Main Entrance High School Cafeteria
FIM #1: Lighting Upgrade & Occupancy Sensors
High School Exterior lighting Elwood Middle School Main Gym
- !"
!" !" !"
- #
# # #
- $%
$% $% $% & & & & '%(# '%(# '%(# '%(# &)* &+) &,+-- &*- )*. ). +) &- ) ) ) ) /001 /001 /001 /001 2
- &).
- +
- 3
3 3 3 405# 405# 405# 405# 3&& &-2 &,3+* &)+
- )-
3* 2- + + + + '06# '06# '06# '06# &2. ) 27- )+& & && )+
- 7
7 7 7 /$#% /$#% /$#% /$#% *7 +8 *)2 7+
- 2
)- )+
/#9 /#9 /#9 /#9
*.2 3-- +,)7& 728 )*8 2- &)) &-+
40#%$:#";/!< 40#%$:#";/!< 40#%$:#";/!< 40#%$:#";/!<
=>/6?$4>66( =>/6?$4>66( =>/6?$4>66( =>/6?$4>66( =>/6?$4>66( =>/6?$4>66( =>/6?$4>66( =>/6?$4>66(
$66,026 in annual energy savings $22,000 LIPA Rebate
Lighting Project
Pre – Post Sample Readings
Before After
W.T. Clarke High School Gymnasium Light Level Readings - Foot Candles
Before Installation After Installation 14 27 24 36 22 31 Average 20 Average 31
FIM #2: Install Vending Miser
The following list shows the number
- f vending machines by building.
High School - four Middle School – three Boyd – two Admin- one Harley - one
FIM #2: Install Vending Miser 11 soda machines $7,194 in annual energy savings
FIM #3: Variable Speed Drives on Kitchen Hood
$7,083 in annual energy savings
Middle School High School
FIM #4: Weatherization Improvements
FIM #4: Weatherization Improvements 61 double commercial doors sweeps only 31 single commercial doors sweeps only 154 Roof top ventilators to be opened, perimiter sealed dampers lubricated 2,081 linear feet roof wall joint to be sealed $11,612 in annual energy savings
The schools where JCI will install controls include Page 81-82: High School Middle School Harley Avenue School James Boyd Intermediate School
$67,722 in annual energy savings
FIM #5: Building Management System Upgrade
Installed 18 temperature sensors & 2 CO2 sensors over study period
HS Library Temp.
56 58 60 62 64 66 68 70 72 74 76 78 11/13/07 11/14/07 11/15/07 11/16/07 11/17/07 11/18/07 11/19/07
HS Auditorium Temp. 72 73 74 75 76 77 78 11/13/07 11/14/07 11/15/07 11/16/07 11/17/07 11/18/07 11/19/07 HS Office Temp. 64 66 68 70 72 74 76 78 11/13/07 11/14/07 11/15/07 11/16/07 11/17/07 11/18/07 11/19/07 MS Room 100 Temp. 56 58 60 62 64 66 68 70 72 74 76 11/13/07 11/14/07 11/15/07 11/16/07 11/17/07 11/18/07 11/19/07MS Room 221 Temp.
10 20 30 40 50 60 70 80 11/13/07 11/14/07 11/15/07 11/16/07 11/17/07 11/18/07 11/19/07MS Library Temp.
10 20 30 40 50 60 70 80 90 11/13/07 11/14/07 11/15/07 11/16/07 11/17/07 11/18/07 11/19/07 MS Auditorium Temp. 10 20 30 40 50 60 70 80 90 11/13/07 11/14/07 11/15/07 11/16/07 11/17/07 11/18/07 11/19/07MS District Office Temp.
58 60 62 64 66 68 70 72 74 76 78 11/13/07 11/14/07 11/15/07 11/16/07 11/17/07 11/18/07 11/19/07Primary Room 158 Temp.
66 68 70 72 74 76 78 80 82 84 86 11/13/07 11/14/07 11/15/07 11/16/07 11/17/07 11/18/07 11/19/07
Primary Room 220 Temp.
64 66 68 70 72 74 76 11/13/07 11/14/07 11/15/07 11/16/07 11/17/07 11/18/07 11/19/07
Primary Library Temp.
66 68 70 72 74 76 78 80 11/13/07 11/14/07 11/15/07 11/16/07 11/17/07 11/18/07 11/19/07
Primary Office Temp.
75 76 77 78 79 80 81 82 11/13/07 11/14/07 11/15/07 11/16/07 11/17/07 11/18/07 11/19/07
Intermediate Room 305 Temp.
68 70 72 74 76 78 80 82 84 11/13/07 11/14/07 11/15/07 11/16/07 11/17/07 11/18/07 11/19/07
Intermediate Room 406 Temp.
68 70 72 74 76 78 80 11/13/07 11/14/07 11/15/07 11/16/07 11/17/07 11/18/07 11/19/07
Intermediate Room 411 Temp.
70 72 74 76 78 80 82 11/13/07 11/14/07 11/15/07 11/16/07 11/17/07 11/18/07 11/19/07
Intermediate Library Temp.
71 72 73 74 75 76 77 78 79 11/13/07 11/14/07 11/15/07 11/16/07 11/17/07 11/18/07 11/19/07
HS Auditorium CO2
200 400 600 800 1000 1200 11/13/07 11/14/07 11/15/07 Days PPM
MS Auditorium CO2
100 200 300 400 500 600 700 800 11/13/07 11/14/07 11/15/07 11/16/07 11/17/07 11/18/07 11/19/07
FIM #6: Steam Traps
The schools with steam systems include:
$7,652 in annual energy savings
Building Thermostatic Radiator Thermostatic Unit-Vent F&T Vacuum Breaker
HARLEY ELEMENTARY 63 31 24 GLENN HS 75 62 32 10 ELWOOD MIDDLE 93 77 17 Totals 231 170 73 10 Total Traps 484
FIM #7: Pipe Insulation
$541 in annual energy savings
The school that was identified for this measure are: John Glenn High School Total: 48ft of HW Piping
FIM #8: Unit Ventilator Upgrade
$3,308 in annual energy savings
The school that was identified for this measure are: Boyd Intermediate School Total: 26 units to be replaced
FIM #9: Pot Sinks
Location Amount High School 3 Middle School 2 Primary School 2 Intermediate School 2
FIM #9: Pot Sinks $1,857 in annual energy savings
The locations that have high flow rate pot scrubbers include:
Location Amount High School 3 Middle School 2 Primary School 2 Intermediate School 2
FIM #10: Verdiem Computer Controllers
2 of the 655 computers district wide at Elwood
FIM #10 : Verdiem Computer Controllers
JCI will install on the districts computer network the Surveyor Network Energy Manager, which is an easy-to-deploy software utility that addresses network energy waste and reduces operating costs without impacting PC
- users. The Network Energy manager is supplied by Verdiem, Inc.
Surveyor measures, manages, and minimizes the energy consumed by the network's PC clients through one centralized interface. It provides IT departments with a powerful approach to automate energy-efficient "best practices" throughout their networks, while it adds new control and flexibility to traditional PC power management.
$11,730 in annual energy savings
FIM #11: Photovoltaic Electric
FIM #11: Photovoltaic Electric Generation
JCI will furnish and install photovoltaic cells with a capacity of 10 Kilowatts at Harley Avenue Primary School. JCI will also install the necessary inverter, power conditioners, etc to enable the system to be connected to the utility company grid system, thus qualifying for substantial incentive LIPA funding.
$2,605 in annual energy savings
FIM #12: Vestibule / Security Installation
FIM #12: Vestibule / Security Installation
Complete Turn key Project
- Hire all subcontractors
- Supervise all subcontractors
- Process all paperwork for SED approval
- Handle all SED questions
- Secure building permits
- Assist the District with RFP for financing
- File all Rebate applications
Next Steps:
- RFP for Energy Project January 2014
- Appointment of ESCO March 2014
- Sign approved contract May 2014
- Submit to SED June 2014
- Begin Construction in January 2015
- Complete Construction in August 2015