ASU Tempe Campus Durham Language and Literature Building Renovation Design Professional RFQ Pre-Submittal Meeting January 16, 2018 What Is the Need? Building Systems are Beyond their Useful Life Tenant Improvements for Current &


slide-1
SLIDE 1

Durham Language and Literature Building Renovation

ASU Tempe Campus

Design Professional RFQ Pre-Submittal Meeting January 16, 2018

slide-2
SLIDE 2

What Is the Need?

  • Building Systems are Beyond their Useful Life
  • Tenant Improvements for Current & New Users
  • Improved Entry and Lobby
  • ADA & Fire/Life Safety Upgrades
  • Technology/ Data Upgrades
  • Exterior Upgrades to Compliment Adjacent Buildings
slide-3
SLIDE 3

Site Map

L&L

Old Main University Club Fulton Building

Alumni Lawn

slide-4
SLIDE 4

Existing Building

slide-5
SLIDE 5

Overall Building Diagrams

Lower Level

28,622 GSF

1st Floor

27,378 GSF

2nd Floor

27,083 GSF

3rd Floor

18,580 GSF

4th Floor

18,583 GSF

5th Floor

8,412 GSF

6th Floor

7,717 GSF

South Wing- Floors LL-2 Central Tower- Floors LL-6 North Wing- Floors LL-4 Total Building=137,065 GSF

slide-6
SLIDE 6

Current Space Program

  • Floors LL through 6 =137,065 gross square feet (GSF).
  • 77,041 net square feet (NSF) of usable space:
  • ~29,500 (NSF) Classroom Space
  • ~41,500 (NSF) Office
  • ~4,000 (NSF) Language Laboratory Space.
  • The remaining ~2,500 (NSF) is distributed amongst

ancillary support space such as mechanical and electrical rooms.

  • The facility has an efficiency of approximately 56%.
  • The current occupants are primarily the School of

International Letters and Cultures (SILC) and University Classrooms.

  • The Department of English recently vacated ~24,500 (NSF)
  • Primarily Floors 3, 5 and 6
slide-7
SLIDE 7

Existing Infrastructure/ Systems Building Infrastructure/Systems Issues:  Abatement (By ASU)  Fire Alarm & Fire Sprinkler  Plumbing  HVAC (Existing Plenum System)  Electrical  Elevators  Security  Information Technology- WiFi & CAT6 Updates  Audio/Visual Technology

slide-8
SLIDE 8

Architectural/ Space Issues Interior Improvements:  Common Space/Entry Lobby  Tenant Improvements for Current & New Users  Restrooms  Offices  Classrooms Exterior Improvements:  Exterior Skin  Exterior Doors  Windows  Window Louvers/Shades  Enhanced Connection between Cady Mall & Alumni Lawn

slide-9
SLIDE 9

Entry and Lobby

Elevators Stairs Desired Improvements

  • Improved Entry
  • Improved Lobby & Wayfinding
  • Connection of Cady Mall to

Alumni Lawn Cady Mall Alumni Lawn Restrooms

slide-10
SLIDE 10

Existing Classrooms

Lower Level 1st Floor 2nd Floor

  • 47 University Classrooms
  • Lower Level, 1st and 2nd Floors
  • Disruption to be Phased
  • Upgrade AV
  • Upgrade to CAT6
  • Upgrade WiFi
  • Update Building Systems
  • Update Classroom Finishes
  • ADA Compliance
slide-11
SLIDE 11

Renovated Building Expectations

Tenant Improvement Expectations:

  • School of International Letters and Cultures- 26,000 SF
  • Associated Research & Outreach Centers- 9,000 SF
  • Existing Classrooms- 30,000 SF
  • Unassigned Office- 8,000 SF
  • Mechanical & Support- 5,000 SF

Overall Expectations:

  • Updated Building Systems & Controls
  • Sustainable Design- LEED Silver
  • ADA and Fire/Life Safety Compliance
  • Interior and Exterior Finish Upgrades
slide-12
SLIDE 12

Project Budget and Schedule Total Project Budget: $45 million Project Schedule:

  • Multi-Phase Construction
  • All Phases Complete by Summer of 2021