DRAF T # 1 2017 BUDGE T Oc to b e r 26, 2016 Cre ating a Ro ad - - PowerPoint PPT Presentation
DRAF T # 1 2017 BUDGE T Oc to b e r 26, 2016 Cre ating a Ro ad - - PowerPoint PPT Presentation
DRAF T # 1 2017 BUDGE T Oc to b e r 26, 2016 Cre ating a Ro ad to F inanc ial Sustainab ility 1 AGE NDA T a x T re nds a nd Co mpa riso ns BMA Re sults Budg e t Pro c e ss 2017 Ba se Budg e t Dra ft 2017 Ope ra ting
AGE NDA
- T
a x T re nds a nd Co mpa riso ns
- BMA Re sults
- Budg e t Pro c e ss
- 2017 Ba se Budg e t
- Dra ft 2017 Ope ra ting Budg e t
- Dra ft 2017 Ca pita l Budg e t
2
E RI N’ S T AX RAT E T RE ND
3
E RI N’ S ASSE SSME NT T RE ND
4
MUNI CI PAL T AX COMPARI SON
Ba se d o n $500,000 a sse ssme nt va lue o f re side ntia l ho me
5
*Puslinc h ha s a se pa ra te le vy fo r fire so se rvic e s wo uld no t b e c o mpa ra tive with the
- the r munic ipa litie s.
T OT AL T AX COMPARI SON
Ba se d o n $500,000 va lue re side ntia l ho me No o the r le vie s a re a dde d to the se fig ure s.
6
OT HE R T AX L E VI E S
Ba se d o n $500,000 va lue re side ntia l ho me
7
BMA RE SUL T S - SUST AI NABI L I T Y
T he a b ility to pro vide a nd ma inta in se rvic e a nd infra struc ture le ve ls witho ut re so rting to unpla nne d inc re a se s in ra te s o r c uts to se rvic e s.
8
BMA RE SUL T S - VUL NE RABI L I T Y
Addre sse s a munic ipa lity’ s vulne ra b ility to e xte rna l so urc e s o f funding tha t it c a nno t c o ntro l a nd its e xpo sure to risks.
9
BMA RE SUL T S - F L E XI BI L I T Y
T he a b ility to issue de b t re spo nsib ly witho ut impa c ting the c re dit ra ting . Also , the a b ility to g e ne ra te re q uire d re ve nue s.
10
BUDGE T PROCE SS
2017 Budg e t Pro c e ss
July 12, 2016 Pro po se d Budg e t Pro c e ss & Guide line Pre se nta tio n July - Aug ust De pa rtme nt me e ting s with F ina nc e De pa rtme nt Se pte mb e r 9, 2016 De pa rtme nt Sub missio ns to F ina nc e De pa rtme nt Oc to b e r 26, 2016 1pm Dra ft 2017 Budg e t Pre se nta tio n to Co unc il No ve mb e r 23, 2016 6:30pm Dra ft 2017 Budg e t Pre se nta tio n (Co unc il a nd Pub lic Co nsulta tio n) De c e mb e r 7, 2016 6:30pm F ina l Budg e t & Use r F e e s By-la w Pre se nta tio n (Spe c ia l Co unc il Pre se nta tio n)
Public Consultations Counc il Appr
- val
11
BUDGE T SUBMI SSI ONS
1.
Dra ft 2017 Ba se Budg e t
2.
Ope ra tio ns Pla n & Re so urc e Re q ue sts
3.
Ca pita l Budg e t Re q ue sts
12
CRE AT I NG 2017 BASE BUDGE T
Ze ro b udg e t 2016 Se rvic e L e ve ls Ba se Budg e t
T he fo llo wing we re so me a ssumptio ns tha t, in c o nsulta tio n with the F ina nc e De pa rtme nt, we re use d b y de pa rtme nts:
- ma inta in c urre nt sta ff c o mple me nt
- sa la ry a djustme nts limite d to pro g re ssio n. No c o st
- f living a djustme nts a llo we d.
- pric e c ha ng e s fo r c o ntra c tua l o b lig a tio ns, fue l
a nd na tura l g a s we re limite d to CPI infla tio n ra te limit a t 2% (Bank o f Canada, Mo ne tary Po lic y Re po rt, April 2016, pg 23)
- hydro e stima te s we re b a se d o n 9 mo nths o f
c o nsumptio n plus thre e mo nths fro m prio r ye a r plus 8%.
- Wa te r b udg e ts we re a djuste d to c urre nt wa te r
c o nsumptio n a nd no pric e inc re a se s a s wa te r ra te s will re ma in the sa me in 2017
- Use r F
e e s did no t c ha ng e
13
CHANGE S T O RE VE NUE S
14
RE VE NUE S F OR OPE RAT I ONS
15
CHANGE S T O E XPE NDI T URE S
16
E XPE NDI T URE S F OR OPE RAT I ONS
17
RE QUE ST S F ROM DE PART ME NT S
$244,700 in Re so urc e Re q ue sts $9.4m in Ca pita l Budg e t Re q ue sts
18
DRAF T 2017 RE SOURCE RE QUE ST S
# Department Description Cost O=One time
- r
C=Continuous Recommended 1 Fire Administrative staff from 2 days a week to 5 days a week 50,400 C
- 2 Fire
Fire Fighter protective gear/uniform 12,000 C
- 3 Fire
First Responders training 8,000 O 8,000 4 Fire Additional Prevention Officer 4,500 C
- 5 Economic Development Public washrooms
5,500 O 5,500 6 Economic Development Replenish operating budget to 2015 Budget due to reduction in 2016 Budget to fund for capital projects. 30,000 C 30,000 7 Roads Administrative staff from 3 days a week to 5 days a week 24,600 C
- 8 Recreation
Mandatory 10 year service to Fire Suppression System at Centre 2000 3,000 O 3,000 9 Recreation Hillsburgh Community Centre – brine used to keep ice surface cool was analyzed and the recommendations was to install Brine Filter 3,500 O
- 10 Recreation
Increase operations budget for parks and playground maintenance 5,000 O 5,000 11 Recreation Repairs to kitchen floor at the Hillsburgh Community Centre 3,000 O 3,000 12 Clerk PT Administrative Assistant 38,000 C
- 13 Clerk
PT Administrative Assistant - computer/furniture/training 3,000 O
- 14 Clerk
Videotaping Council meetings 18,000 C
- 15 Water
Leak detection mechanism 24,000 O 24,000 16 Water Summer student - vacation coverage 12,200 C 12,200 Subtotal 244,700 90,700 17 CAO 2 PT Administrative contract staff (3 days) - assist all departments with administration work O 62,200 Total 244,700 152,900
19
DRAF T 2017 CAPI T AL PROJE CT S
20
DRAF T 2017 CAPI T AL PROJE CT S
21
DRAF T 2017 CAPI T AL PROJE CT S
22
ROADS Council approved Project with Grant Application to Canada 150 Infrastructure:Station St Rehabilitation, includes Bridge 2064
1,221,154
Council approved Project with Grant Application for OCIF Top Up: Daniel St
1,218,750
Salt Dome shingle replacement
50,000
Sidewalk Maintenance Implementation
60,000
Grader Refurbishment - 2003 Volvo G740B
250,000
Thompson Cr Resurfacing
125,000
Vinyl Salt Storage structure
30,000
Bridge Culvert maintenance - OCIM structure inspection
606,700
Crosswalk on Main St Erin
50,000
Paving of Parking Lot at 109 Main St, Erin & signal crossing
65,000 Roads Dept - Totals
3,676,604
DRAF T 2017 CAPI T AL PROJE CT S
23
DRAF T 2017 CAPI T AL PROJE CT S
24
DRAF T 2017 CAPI T AL PROJE CT S
25
DRAF T 2017 CAPI T AL BUDGE T
26
CAPI T AL PROJE CT S BY DE PART ME NT
27
F UNDI NG F OR CAPI T AL PROJE CT S
28
DE BT
- $17.7m c a pita l pro je c ts sho rtfa ll
- By 2023, we me e t $17.7m sho rtfa ll
- De b t re pa yme nt limit re a c he d 2025
Assumptio ns
- $2m de b t e a c h ye a r fro m 2018
- De b t re pa yme nt limit inc re a se s b y 2.5%
e a c h ye a r
29
RE SE RVE S
Assumptio ns
- Ne t withdra wa l $500k e a c h ye a r
- Co ntrib utio ns a re $1.8m e a c h ye a r
- Spe nding $2.3m
By 2025, we wo uld ha ve de ple te d the re se rve s to $2m
1,000 2,000 3,000 4,000 5,000 6,000 7,000 2017 2018 2019 2020 2021 2022 2023 2024 2025
Reserves
‘ 000’ s
30
DRAF T 2017 OPE RAT I NG BUDGE T
Re so urc e Re q ue sts
I nfra struc ture L e vy
2017 Ba se Budg e t
Ca pita l Re q ue sts Dra ft 2017 Budg e t
I nfrastruc ture T ax L e vy I nc re ase b y $120,000 Re c o mme nde d Re so urc e Re q ue sts $152,900 Capital Pro je c ts F unde d fro m T axatio n $533,200 fo r Re c o mme nde d Capital Pro je c ts o f $5.5m