Phenotypic deconstruction of dormant bud winter hardiness
XII International Conference on Grapevine Breeding and Genetics
Universitéde Bordeaux 7/15/2018-7/20/2018
Jason P. Londo and Alisson P. Kovaleski
dormant bud winter hardiness XII International Conference on - - PowerPoint PPT Presentation
Phenotypic deconstruction of dormant bud winter hardiness XII International Conference on Grapevine Breeding and Genetics Universitde Bordeaux 7/15/2018-7/20/2018 Jason P. Londo and Alisson P. Kovaleski Cold Hardiness: phenotyping 6-8
XII International Conference on Grapevine Breeding and Genetics
Universitéde Bordeaux 7/15/2018-7/20/2018
Jason P. Londo and Alisson P. Kovaleski
10 20
Nov-13 Dec-13 Jan-14 Feb-14 Mar-14 Apr-14
Cane, Trunk, Phloem, Xylem, Cambium, Compou mpound nd Bud Cold Hardiness: minimum temperatures do not breach bud’s
Dormancy is critical: must be induced to gain cold hardiness, maintained to prevent damage. Timing is everything.
Maximum Hardiness
0°C 11°C
Chilling hour accumulation
Endodormancy Ecodormancy
Temperature °C Full Chilling Insufficient Chilling
0.E+00 1.E-04 2.E-04 3.E-04 4.E-04 5.E-04 6.E-04
1.9
Voltage (V) Temperature (°C)
Low Temperature Exotherm (LTE)
HTE
5.00 15.00
7-Nov 7-Dec 6-Jan 5-Feb 7-Mar 6-Apr
2012-2013
5.00 15.00
12-Nov 12-Dec 11-Jan 10-Feb 12-Mar 11-Apr
2013-2014
5.00 15.00
12-Nov 12-Dec 11-Jan 10-Feb 12-Mar
2014-2015
responses.
Degrees C°
mean and oscillation. Starting LTE: ~ - 12 12°C Mean 7°C 0°C oscillation Mean 7°C 3°C oscillation (4 to 10°C) Mean 7°C 5°C oscillation (2 to 12°C) Mean 2°C 0°C oscillation Mean 2°C 5°C oscillation (-3 to 7°C) LTE: ~ - 12°C LTE: ~ - 12°C LTE: ~ - 17 17°C LTE: ~ - 15 15°C LTE: ~ - 20 20°C Starting LTE: ~ - 12 12°C 3°C 5°C 5°C 8°C 0°C
Londo and Kovaleski2017
mean and oscillation.
Londo and Kovaleski2017
Strong Weak
between species.
4-Aug 3-Sep 3-Oct 2-Nov 2-Dec 1-Jan 31-Jan 2-Mar 1-Apr 1-May31-May
3-Oct 2-Nov 2-Dec 1-Jan 31-Jan 2-Mar 1-Apr 1-May
Measured LTE values °C 2013-2014 43 different Vitis riparia
Comparing cold hardiness response with statistics based models No genotype effect Genotype effect
LTE °C
All V. riparia respond to temperature fluctuations in the same way. Dormancy induction may modulate max LTE?
Londo and Kovaleski 2018: in review
10 20 30
17-Sep 17-Oct 16-Nov 16-Dec 15-Jan 14-Feb 16-Mar 15-Apr 15-May
LTE °C
−30 −25 −20 −15 −10 −5 10 20 30 40 50 60 70 80 90
°
360 860 1580
10 °C
−30 −25 −20 −15 −10 −5 10 20 30 40 50 60 70 80 90
Time (day) °
360 860 1580
22 °C
−30 −25 −20 −15 −10 −5
LTE (°C)
10 20 30 40 50 60 70 80 90 Days 10 20 30 40 50 60 70 80 90 Days Endodormancy Ecodormancy
Chilling accumulation increases rate of deacclimation Chilling accumulates
Kovaleski, Reisch and Londo 2018: in review
−25 −20 −15 −10 −5 50 100 150
Time (Day) LTE (°C) T (°C)
25 50 75 100 400 800 1200 1600
Accumulated Chill
4 22
Rate (%)
Chill Accumulation ~ Deacclimation potential
Endodormancy Ecodormancy
−25 −20 −15 −10 −5
° (°C)
2 4 7 8 10 11 22
−25 −20 −15 −10 −5
° Temperature (°C)
2
Full speed depends on the airplane Rate of deacclimation depends on the temperature
0.0 0.5 1.0 1.5 2.0 2.5 4 8 12 16 22 30
Temperature (°C) °
1580 (97 %) 1030 (60 %) 860 (30 %) 360 ( 0 %)
Kovaleski, Reisch and Londo 2018: in review
0.5 1 1.5 2 2.5 3 250 500 750 1000 1250 1500
Riesling 10°C Riesling 22°C
Deacclimationrate, °C/day
Chill Accumulation
Deacclimation potential is driven by chilling Deacclimation rate is temperature specific New high-throughput phenotypes for mapping populations Slope: Dormancy transition speed and Inflection Point: 50% Deacclimating potential Rate/Ratio
LTE °C Days in 15 °C T0 T4 T11 T21
Rate of loss °C/day
0.57 0.51 0.30 0.29
2/5 2/10 2/15 2/20 2/25
2/5 2/10 2/15 2/20 2/25
15°C 0.29 °C/Day 15°C 0.57 °C/Day 4°C 0.07 °C/Day 4°C 0.04 °C/Day LTE °C LTE °C
10 20 30 40 Aug-16 Oct-16 Nov-16 Jan-17 Mar-17 Apr-17 Jun-17
Outc tcome
two portions identifies separate phenotypes: 1) Response potential: variation at species level = σ T 2) Dormancy/deacclimation resistance: variation at genotype level = Σdeac Combining these two traits increases prediction ability and can be used to help map the traits.
10 20 30 40 Aug-16 Oct-16 Nov-16 Jan-17 Mar-17 Apr-17 Jun-17
10 20 30 40 Aug-16 Oct-16 Nov-16 Jan-17 Mar-17 Apr-17 Jun-17
Outc tcome
two portions identifies separate phenotypes: 1) Response potential: variation at species level = σ T 2) Dormancy/deacclimation resistance: variation at genotype level = Σdeac Combining these two traits increases prediction ability and can be used to help map the traits.
Researc rch Geneticist st Jason Londo Kathlee een Deys Deys Hanna Martens Bill l Srmack ck John K Keeton Bob Martens Greg Noden Bruce Reisch Bill Wilse sey Tim Martinso son Lynn Johnson Ravine ines s Wine Cellar ars Anthony Road Wine Co. Anne Fennell – SDSU Krista ta Shelli i – USDA, Parma ma PhD Candidat idate Alisso sson Koval aleski ski