DON’T WASTE THE BEAUTY
- AN ENVIRONMENTAL WASTE SOLUTION -
DONT WASTE THE BEAUTY - AN ENVIRONMENTAL WASTE SOLUTION - ECOFLEX - - PDF document
ECOFLEX LTD DONT WASTE THE BEAUTY - AN ENVIRONMENTAL WASTE SOLUTION - ECOFLEX LTD Table of Content The way to treat our Waste 3-4 Waste Project in UAE 5-8 Contents of the Contract 9-11
ECOFLEX LTD
Table of Content
The way to treat our Waste 3-4 Waste Project in UAE 5-8 Contents of the Contract 9-11 Process Flow 15
2
ECOFLEX LTD
3
ECOFLEX LTD
ECOFLEX LTD
ECOFLEX LTD
ECOFLEX LTD
ECOFLEX LTD
ECOFLEX LTD
ECOFLEX LTD
ECOFLEX LTD
ECOFLEX LTD
ECOFLEX LTD
ECOFLEX LTD
ECOFLEX LTD
Organic material Plastics 14% Ferrous metals 6% 20 tonnes Non-ferrous metals 1% batch load Textiles 4% Glass 2% Other 13% Supply steam 4.3 tonnes/batch Residue
Non-Ferrous
Ferrous Fibre Screening Metal Metal Screening Screening Screening Boiler 14.5 tonnes/batch Feed 6.6 tonnes 0.2 tonnes/batch 1.2 tonnes/batch Biomass Fibre Water Residuals/batch Non-Ferrous Ferrous (35% Moisture Content) Tank 2.8 tonnes plastics 0.8 tonnes textiles 0.4 tonnes glass 12.52 0.95 1.03 2.6 tonnes other Site elec Site steam Exhaust Steam Condenser Atmosphere Odour Abatement Waste Heat System 1.98 tonnes 1,300 kW variable Fibre Mains Cooling (boiler fuel) Water Tower To Drain ` Steam Turbine Load 750 kW
Simple Mass, Heat & Volume Balance - The Wilson System
Treatment Plant Recovered water Clean softened water 4.3 tonnes/batch
Assuming Process Fibre Used to Supply Site Energy
Electrical Generator Run/standby Exhaust steam 1.8 tonnes/batch Steam Boiler Autoclave Steam Accumulator Typical Waste Composition Autoclave 3.2 tonnes/batch 0.7 tonnes/batch Recycled to autocalves 1.8 tonnes/batch 87% Efficient Steam from site boilers @ 40% moisture content Heat & power for export 11.3 Te/hr F&A 100°C Steam Boiler 60% at 20% moisture Run/standby 87% Efficient Boiler Feed Water 11.3 Te/hr F&A 100°C
15
ECOFLEX LTD
ID Task Name 1
PREPRERING DOCUMENTS IN DK
2
SENDING DOCUMENTS TO CLIENT
3
RESPONSE FROM CLIENT
4
VISIT IN UAE
5
SIGNING CONTRACT FOR ENG.
6
7 8
ENGENERING IN UAE
9
FINANCING SOFTLOANS ECT.
10
SIGNING CONTRACT FOR CONST.
11 12
13
CIVIL WORKS ON SITE
14
15
PRODUCTION MACHINERY
16
17 18
19
TRAINING PERSONAL
20
HANDOVER TO CLIENT
DK GROUP DK GROUP LOCAL GROUP DK GROUP BOTH BOTH DK GROUP BOTH BOTH LOCAL GROUP DK GROUP/LOCAL DK GROUP/LOCAL DK GROUP/LOCAL DK GROUP/LOCAL DK GROUP DK GROUP BOTH 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
WASTE PROJECT UAE OVERALL TIMEFRAME. ONE LINIE 200000 TONS PER. YEAR
ECOFLEX LTD
16
ECOFLEX LTD
ECOFLEX LTD
ECOFLEX LTD