DONT WASTE THE BEAUTY - AN ENVIRONMENTAL WASTE SOLUTION - ECOFLEX - - PDF document

don t waste the beauty
SMART_READER_LITE
LIVE PREVIEW

DONT WASTE THE BEAUTY - AN ENVIRONMENTAL WASTE SOLUTION - ECOFLEX - - PDF document

ECOFLEX LTD DONT WASTE THE BEAUTY - AN ENVIRONMENTAL WASTE SOLUTION - ECOFLEX LTD Table of Content The way to treat our Waste 3-4 Waste Project in UAE 5-8 Contents of the Contract 9-11


slide-1
SLIDE 1

DON’T WASTE THE BEAUTY

  • AN ENVIRONMENTAL WASTE SOLUTION -

ECOFLEX LTD

slide-2
SLIDE 2

ECOFLEX LTD

Table of Content

The way to treat our Waste 3-4 Waste Project in UAE 5-8 Contents of the Contract 9-11 Process Flow 15

  • Apendix
  • b. The Wilson Process
  • e. Waste in the Golf (Report)

2

slide-3
SLIDE 3

ECOFLEX LTD

3

slide-4
SLIDE 4

ECOFLEX LTD

  • 4
slide-5
SLIDE 5

ECOFLEX LTD

  • 5
slide-6
SLIDE 6

ECOFLEX LTD

  • 6
slide-7
SLIDE 7

ECOFLEX LTD

  • 7
slide-8
SLIDE 8

ECOFLEX LTD

  • 8
slide-9
SLIDE 9

ECOFLEX LTD

  • 9
slide-10
SLIDE 10

ECOFLEX LTD

  • 10
slide-11
SLIDE 11

ECOFLEX LTD

  • 11
slide-12
SLIDE 12

ECOFLEX LTD

  • 12
slide-13
SLIDE 13

ECOFLEX LTD

  • 13
slide-14
SLIDE 14

ECOFLEX LTD

  • 14
slide-15
SLIDE 15

ECOFLEX LTD

Organic material Plastics 14% Ferrous metals 6% 20 tonnes Non-ferrous metals 1% batch load Textiles 4% Glass 2% Other 13% Supply steam 4.3 tonnes/batch Residue

Non-Ferrous

Ferrous Fibre Screening Metal Metal Screening Screening Screening Boiler 14.5 tonnes/batch Feed 6.6 tonnes 0.2 tonnes/batch 1.2 tonnes/batch Biomass Fibre Water Residuals/batch Non-Ferrous Ferrous (35% Moisture Content) Tank 2.8 tonnes plastics 0.8 tonnes textiles 0.4 tonnes glass 12.52 0.95 1.03 2.6 tonnes other Site elec Site steam Exhaust Steam Condenser Atmosphere Odour Abatement Waste Heat System 1.98 tonnes 1,300 kW variable Fibre Mains Cooling (boiler fuel) Water Tower To Drain ` Steam Turbine Load 750 kW

Simple Mass, Heat & Volume Balance - The Wilson System

Treatment Plant Recovered water Clean softened water 4.3 tonnes/batch

Assuming Process Fibre Used to Supply Site Energy

Electrical Generator Run/standby Exhaust steam 1.8 tonnes/batch Steam Boiler Autoclave Steam Accumulator Typical Waste Composition Autoclave 3.2 tonnes/batch 0.7 tonnes/batch Recycled to autocalves 1.8 tonnes/batch 87% Efficient Steam from site boilers @ 40% moisture content Heat & power for export 11.3 Te/hr F&A 100°C Steam Boiler 60% at 20% moisture Run/standby 87% Efficient Boiler Feed Water 11.3 Te/hr F&A 100°C

15

slide-16
SLIDE 16

ECOFLEX LTD

ID Task Name 1

PREPRERING DOCUMENTS IN DK

2

SENDING DOCUMENTS TO CLIENT

3

RESPONSE FROM CLIENT

4

VISIT IN UAE

5

SIGNING CONTRACT FOR ENG.

6

  • COLL. INFORMATION FOR Q-BOOKS

7 8

ENGENERING IN UAE

9

FINANCING SOFTLOANS ECT.

10

SIGNING CONTRACT FOR CONST.

11 12

  • PREP. BUILDINGSITE AND ROADS

13

CIVIL WORKS ON SITE

14

  • EREC. BUILDINGS

15

PRODUCTION MACHINERY

16

  • EREC. MACHINERY ON SITE

17 18

  • COM. AND TEST

19

TRAINING PERSONAL

20

HANDOVER TO CLIENT

DK GROUP DK GROUP LOCAL GROUP DK GROUP BOTH BOTH DK GROUP BOTH BOTH LOCAL GROUP DK GROUP/LOCAL DK GROUP/LOCAL DK GROUP/LOCAL DK GROUP/LOCAL DK GROUP DK GROUP BOTH 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34

WASTE PROJECT UAE OVERALL TIMEFRAME. ONE LINIE 200000 TONS PER. YEAR

ECOFLEX LTD

16

slide-17
SLIDE 17

ECOFLEX LTD

  • 17
slide-18
SLIDE 18

ECOFLEX LTD

  • 18
slide-19
SLIDE 19

ECOFLEX LTD

  • The Wilson Process
  • Waste in the Gulf
  • 19