Capital Marked Presentation Dof Subsea Atlantic Region Agenda Atlantic Business and Area of Operation Clients & Some Ongoing Contracts Our Capabilities Market Outlook DOF Subsea 2 Atlantic Business and Area of Operation DOF Subsea


slide-1
SLIDE 1

Capital Marked Presentation

Dof Subsea Atlantic Region

slide-2
SLIDE 2

Agenda

DOF Subsea 2

Atlantic Business and Area of Operation Clients & Some Ongoing Contracts Our Capabilities Market Outlook

slide-3
SLIDE 3

DOF Subsea

Atlantic Business and Area of Operation

slide-4
SLIDE 4

DOF Subsea Atlantic is...

A lead provider of integrated subsea survey and construction services to the offshore industry. We have a range of high end construction assets and competent people to deliver various subsea projects to meet our client demands.

DOF Subsea 4

slide-5
SLIDE 5
  • HSEQ Management System based on 30 years of operations
  • Quality Policy has a direct focus on customers’ satisfaction
  • Health, Safety & Working Environment Policy emphasises on

”ensuring that all identified risks and hazards are reduced to a level that is as low as reasonably practicable”

  • Regularly audited by various clients
  • We are ISO 9001:2008 accredited
  • Our commitment to Global External Environmental is

demonstrated with global certification within ISO 14001:2004.

  • The Safety and Occupational Health Standards are certified

to OHSAS 18001:2007

HSEQ

slide-6
SLIDE 6

Our Business segments

  • Seabed and Pipeline Survey
  • IMR
  • Subsea Construction

DOF Subsea 6

slide-7
SLIDE 7

Area of Operation

DOF Subsea 7

Med

slide-8
SLIDE 8

We run the regional business from : Bergen Aberdeen Angola

DOF Subsea | Atlantic Locations

Onshore personnel : Uk 55 Norway 60 Angola 20 Offshore personnel : 200 staff 50-100 contractors approx 200 Marine Crew

slide-9
SLIDE 9

DOF Subsea | CSV Fleet – Atlantic Region

Skandi Skansen Construction Support Vessel Built: 2011 Skandi Skolten Construction Support Vessel Built: 2010 Skandi Constructor Construction Support/Well Intervention Vessel Built: 2010 Geosund IRM / Construction Support Vessel Built: 2001 Geoholm IRM / Construction Support Vessel Built: 2006 Geocat Near shore Survey Launch Built: 1993

slide-10
SLIDE 10

DOF Subsea

Clients & Some Ongoing Contracts

slide-11
SLIDE 11

DOF Subsea | 2011/2012 Clients

slide-12
SLIDE 12

Main Ongoing Contracts

  • ENI Goliat FPSO Installation
  • Statoil survey & light

construction FA

  • ConocoPhillips IMR FA
  • Hess FA (West Africa)
  • Goliat SURF support to

Technip

  • ROV services
  • Shell accomodation and

subsea IMR support

DOF Subsea 12

slide-13
SLIDE 13

Scope of Work

Site and route definition surveys On board geophysical data interpretation charting and reporting. Highlights Various seabed survey activities for Statoil. Fully integrated surveying with on board data processing, charting and reporting. Client: Statoil ASA Location: NCS Vessel: Geosund Call off: 6 months with 6 monthly options

Seabed Survey & Light Construction

slide-14
SLIDE 14

Tullow Jumper/ Spool Replacement

Client: Tullow Oil Location: Jubilee Field, Ghana Vessel: Skandi Constructor Year: End 2011

Scope of Work

  • Jumper/Spool

Design

  • Engineering
  • Fabrication
  • Installation
slide-15
SLIDE 15

DOF Subsea | Goliat FPSO Project

slide-16
SLIDE 16

DOF SUBSEA - Mooring system installation

  • DOF Subsea owns and operates 3 construction vessels specially designed to perform light

construction and mooring system installation. The combination of chain and wire handling capability of a top end AHT together with ROV and active heave compensated crane for subsea construction operations provides an efficient and robust solution for FPSO mooring system installation. The large clear deck area and moonpool allow versatility to enhance the capability in light construction activity.

1 6

slide-17
SLIDE 17

Installation method

slide-18
SLIDE 18

Installation method

slide-19
SLIDE 19

Well abandonment campaign

CSV Skandi Constructor provided support services for OIS Ltd. during their well abandonment campaign

  • f 5 wells.

Beechnut 29/09-B-9z

Beechnut 29/09B-2

Monkwell 42/29-8

Carna 43/21B-5z

Rose 47/15B-5 Client: OIS Location: various, UK sector Vessel: Skandi Constructor Year: End 2011

slide-20
SLIDE 20

DOF Subsea

Our Capabilities

slide-21
SLIDE 21
  • Project Management & Engineering
  • Procurement and Logistics
  • Execution
  • FPSO & Mooring Installations
  • Subsea Structure Installation
  • Flexible and Umbilical Installation
  • Infield Support (Spools, Tie-ins,

RFO)

  • IMR
  • Seabed Survey and Inspection
  • Subsea Equipment

Decommissioning

DOF Subsea | Engineering & Construction

slide-22
SLIDE 22
  • Approx 85 Engineers.
  • Grown to more than100 before

YE

  • Engineering disciplines & services:
  • Front end & concept engineering
  • Installation studies
  • Decommissioning studies
  • Installation methods
  • Installation & in-place analysis
  • Structural design
  • Drafting

DOF Subsea | Engineering Capabilities

slide-23
SLIDE 23

Laying Analysis Midwater Arch / Structure Installations STP Tow/Installation

DOF Subsea | Installation Engineering

slide-24
SLIDE 24

Providing planned and thoroughly controlled operations is essential for flexible products that are delicate and complex in the harsh conditions encountered during installation.

DOF Subsea | Flexible & Umbilical Installation

slide-25
SLIDE 25

DOF Subsea | IRM

  • Typical IRM Tasks
  • Pipeline/Structure Inspection
  • Light Construction – Spools,

Valves etc.

  • Anode Replacement
  • Flying Lead Replacement
  • Pipeline Freespan Correction
  • Cable & Jumper Replacement
  • Intervention
slide-26
SLIDE 26

Skandi Skolten, Bluewater 85 Te Suctionpiles with chains and wires

DOF Subsea | Mooring Installation

slide-27
SLIDE 27

FPSO Hook-up to pre-laid mooring

Positioning Hooked-up Hooking-up

DOF Subsea | Mooring Installation

slide-28
SLIDE 28

Skandi Bergen Statoil Ormen Lange Project Skandi Skolten, Atlantis Resources 195 T e Turbine Installation Installation of subsea structures

DOF Subsea | Subsea Structure Installation

slide-29
SLIDE 29

We operate more than 20 ROV systems and have more than 150 highly competent ROV supervisors/pilots

Statoil Tune South Phase II, Jumper Replacement & RTS Tie-In Subsea Disconnections

DOF Subsea | Tie-in & Diverless Intervention Capabilities

slide-30
SLIDE 30

Field Abandonment & Decommissioning Capabilities

Skandi Skolten, ConocoPhillips Seabed Cleanup, 2010 Geosund 210 m of 30” Pipe, cut in 12m sections. 2800 Te of Concrete Covers (165 covers in total). Skandi Bergen, Total Frigg Seabed Debris Removal, 2011. 780 Te of structures Recovered from the Seabed.

slide-31
SLIDE 31

DOF Subsea

Market Outlook

slide-32
SLIDE 32

G&G Surveys Subsea Services G&G Surveys Subsea Services

Global market

IMR will continue to be the largest

market throughout the forecast period with USD 5.5 bn in 2011 and USD 7.5 bn in 2016. The market fore survey is estimated to USD 1.2 bn in 2011 and USD 2.5 bn in 2016

From 2011 to 2016 the IMR

market is forecasted to grow by a CAGR of 6.4% (1.6x increase). However, in the same period the Survey market is estimated to grow at an annual rate of 15% (2x increase).

The

region estimated to experience the highest percentage growth in Survey activity in this period is Australia Region

Both

Western Europe and North America above 10 bn USD

Western Africa following in

third driven largely by spend in Angola and Nigeria

South America spend nearly 5 bn

  • USD. Brazil accounting for over

80% of the region spend

Combined IMR and Survey market to grow by 8% per year towards 2016

*CAGR = Compounded annual growth rate Source: Rystad Energy analysis, DCube

33

IMR and Survey spend USD million IMR and Survey spend (2012-2016) by region USD million

IMR Survey IMR Survey

slide-33
SLIDE 33

Floating production units – FPSO projects by region the next 3 years

Source: Infield

slide-34
SLIDE 34

Market Outlook - Summary

Strong marked next 3 years

  • 40-50 FPSO to be installed
  • Strong need to maintain

existing infrastructure (IMR)

  • High demand for seabed

and pipeline survey required

  • Strong demand for our

services !

DOF Subsea 35

slide-35
SLIDE 35

Key Message

The regional market outlook is promising for the next couple

  • f years

We got the assets and are growing our organisation to win and execute higher end subsea construction work