Capabilities Overview Location: Date: June 20, 2017 CADS - - PowerPoint PPT Presentation

capabilities overview
SMART_READER_LITE
LIVE PREVIEW

Capabilities Overview Location: Date: June 20, 2017 CADS - - PowerPoint PPT Presentation

Capabilities Overview Location: Date: June 20, 2017 CADS Representatives : David Stutes PRESIDENT Bobby Stollsteimer Sr PM/PCM Lonnie Gatte Sr PM Sam McNabb Sr PM (REFERED BY JIM LINSKEY) Overview Local


slide-1
SLIDE 1

Capabilities Overview

Location: Date: June 20, 2017 CADS Representatives :

  • David Stutes – PRESIDENT
  • Bobby Stollsteimer – Sr PM/PCM
  • Lonnie Gatte – Sr PM
  • Sam McNabb – Sr PM (REFERED BY JIM LINSKEY)
slide-2
SLIDE 2

Overview

  • Local office located at 609 Landry Ln., Sulphur, La
  • Satellite office located at 2017 East Co. Rd 130, Midland, Tx
  • Work within the Upstream, Midstream, and Downstream markets
  • An element of our vision is to sustain a ‘best-in-class’ work

environment where our employees can count on a safe work place and a stable income

  • We consciously support our community through engagement with
  • ur local leadership and our employees
  • The foundation of our culture is based on sound principles of

‘keeping our people safe’ and ethical considerations in all we do.

  • Prior to project start, we identify risk, create a fit-for-purpose

strategy, and identify and establish accountability

  • CADS execution strategy always represents client’s best interest
slide-3
SLIDE 3

Overview

CADS SPECIALTY WELDING CADS PRIDES ITSELF in providing AA craft

  • n all boiler, heater, reformers, and any

coded vessels towers ect. CADS has U4 Cert, R stamp, and NB certified. All piping and fittings. All specialty welding.

slide-4
SLIDE 4

Services Provided

➢ Shop Fabrication

  • In-house Flare Reduction System and connection piping

➢ ‘R’ and ‘U’ Stamps/TURNAROUNDS MAINTENANCE ➢ SPECIALTY WELDING BEST IN CLASS ➢ Roustabout ➢ Site Construction Services

  • Gas Field Installation:

✓ Manifolds and Risers ✓ Tank Battery with connecting piping ✓ Flare Systems (Design and Installation) ✓ Separators with connecting piping ✓ Recirculation piping ✓ Structural Steel (Walkways and supports) ✓ Water injection systems ✓ Insulation (with pads) ✓ Routine maintenance & process pipe cleaning

➢ Craft Supervision and Craft Labor ➢ Plant Maintenance and Capital Construction Services ➢ Procurement Support ➢ Coatings ➢ Professional Services ➢ Pipeline

slide-5
SLIDE 5

Notes

  • 2015 Effort Hours:

35,000

  • 2016 Effort Hours:

45,000

  • 2017 Proj. Effort Hours:

90,000

  • Submitted 120 of 140 bid requests
  • Safety Information:
  • EMR – 1.0
  • Health Management Alignment:
  • Business Health Partners
  • Southwest Louisiana Safety Council

6810 West Yellowstone Rd. Mills, Wyoming 82604 609 Landry Ln Sulphur, Louisiana 70663

Office Locations:

2107 East Co. Rd 130 Midland, Texas

slide-6
SLIDE 6

Shop Fabrication

Shop Characteristics:

  • 180’ x 152’
  • 20,000 SF Fabrication Area
  • 360 Ton loadout capability (cranes, dollies, sliders)
  • 12 Automated Welders
  • 6’ x 12’ Water Jet Table
  • 5’ x 10’ Plasma Table

Shop Scope:

  • Structural Steel
  • Piping (Alloy & CS)
  • Coded Vessels
  • Skid Fabrication and Assembly
  • 90% of gas field on site personnel can be

eliminated Production (combination CS/Alloy):

  • Avg of 6” pipe spools
  • 5-10’s; 200 spools / week
  • 7-24’s; 500 spools / week
  • 3 – 6” pipe spools per welder / Station
  • 12 production stations (Min.)
  • Notes:
  • All client work will be color coded as the

material is received.

  • Spool quantities will fluctuate based on the

diameter of the pipe.

Coatings:

  • Ample space to accommodate sandblasting

and painting

  • NACE Level III oversight
slide-7
SLIDE 7

Certified Pressure Vessel Fabrication

CADS Construction has acquired the following certifications:

  • “R” Stamp - Field modification(s) of existing coded equipment - NBR
  • “U” Stamp -

New coded vessel fabrication - ASME

slide-8
SLIDE 8

Roustabout and Pipeline

Facility Fabrication, Construction, Maintenance, and Roustabout

  • Facility Fabrication and Construction
  • Equipment Transport (Loading and Offloading)
  • Equipment Refurbishment
  • Well Site Fabrication
  • Well Site Installation

Pipeline

  • Right of Way Preparation
  • Excavation / Boring
  • Pre-fabrication
  • Pipe String / Installation
  • Hydro Testing
  • Site Restoration
slide-9
SLIDE 9

Our Mission

Our mission is to sustain a best-in-class workplace where all stakeholders share in the benefits of our Safety, Quality*, and cost-effective approach. CADS shall incorporate ethical decision making in all aspects of our organization to sustain trust within the communities in which we work.

* Quality covers CADS workflows and process in Governance, Administrative, and Technical.

slide-10
SLIDE 10

Why CADS?

CADS Construction maintains a healthy ratio of seasoned journeyman supervision and craft people within our labor pool. Therefore, we can minimize the risk to safety, quality, cost, and schedule on project and shop activities.

5 10 15 20 25 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Supply vs Demand Curve

Demand Supply

slide-11
SLIDE 11

CLIENT BASE