NigerStar 7 Com pany Overview & Capabilities June 2015 11-Jun-15 Page 1 www.NigerStar7.com Safety and Core Values About NigerStar 7 Local Engineering Capabilities Local SCM Capabilities Agenda Our Yards
2 Page 11-Jun-15 www.NigerStar7.com
- Safety and Core Values
- About NigerStar 7
- Local Engineering Capabilities
- Local SCM Capabilities
- Our Yards
- Onshore Construction
Competencies and Capacity
- Offshore Assets
- Local Content
- Nigeria Host Community Relations
- Main References
Agenda
3 Page 11-Jun-15 www.NigerStar7.com
Safety is one of our core values
- NigerStar 7 is committed to an incident-free workplace,
everyday, everywhere. Our performance depends on our ability to continually improve the quality of the services we provide to our clients, while protecting people and minimising the impact on the environment.
- We will always communicate openly on HSEQ
issues with our stakeholders and share with them our experience and knowledge of successful HSEQ initiatives.
4 Page 11-Jun-15 www.NigerStar7.com
Our core values
Safety I ntegrity I nnovation Perform ance Collaboration
5 Page 11-Jun-15 www.NigerStar7.com
NigerStar 7 Presentation
About NigerStar 7
Nigerstar7-Update-v2.mp4
6 Page 11-Jun-15 www.NigerStar7.com
NigerStar 7, a Nigerian EPCI Contactor
- Joint venture company, created by
Jagal and Subsea 7
- NigerStar 7 is a majority owned
Nigerian company
7 Page 11-Jun-15 www.NigerStar7.com
Our Locations in Nigeria
Nigerstar7 Nigerstar7 Nigerstar7 Nigerstar7
NigerStar 7 operates from 4 locations:
- Lagos: Head Office in Victoria
Island, Lagos State
- Lagos: Fabrication yard in Snake
Island Free Zone, Lagos State
- W arri: Fabrication yard (Delta
State)
- Onne / Port Harcourt:
Offshore support, logistics base and operations at Federal Ocean Terminal (Rivers State)
8 Page 11-Jun-15 www.NigerStar7.com
Main Expertises
- Deepwater expertise (Subsea Umbilicals,
Risers and Flowlines - SURF)
- Conventional field development projects
and hook-up revamping
- Project management expertise
- Engineering (detailed and installation)
- Fabrication (facilities in Lagos and Warri)
- Installation expertise of Subsea 7
9 Page 11-Jun-15 www.NigerStar7.com
Capabilities and Capacities
- Workforce of 1,000+ experienced
people located in Lagos, Port Harcourt and Warri
- 2 fabrication yards in Lagos and Warri
with a total maximum capacity of 4- million productive man-hours per year
- Support of Subsea 7’s offshore
construction fleet, one of the largest in the industry
10 Page 11-Jun-15 www.NigerStar7.com
Capabilities and Capacities (Cont’d) NigerStar 7 performs the engineering, procurement, construction, installation and commissioning of:
- Platforms (jacket, piles & topsides), topside modules and flares
- Riser towers
- Manifolds
- Buoyancy tanks, offloading buoys
- Suction and anchor piles, PLETs, PLEMs, FLETs, FTA, ITA
- Double joints, pipe-in-pipe, reeled pipelines
- Jumpers and spools
- FPSO modules, helidecks
11 Page 11-Jun-15 www.NigerStar7.com
LOCAL ENGI NEERI NG CAPABI LI TI ES
12 Page 11-Jun-15 www.NigerStar7.com
Global Oceon - Personnel
Global Oceon = Subsea 7 + Petrolog Group
9 5 %
5 %
Nigerians Expatriates
7 3 % 2 7 %
Engineers Non- Engineers
Workforce Profile Total Nigerians 56 Expatriates 3 Engineers 43 Non‐Engineers 16 TOTAL NO. OF EMPLOYEES = 59 NCD Trainees = 9 Not included in the headcount NCD Trainees = 9 Not included in the headcount
13 Page 11-Jun-15 www.NigerStar7.com
Global Oceon - Departments
- Seafastening
- Installation Aids
- Barge Strength Analysis
- PLET/PLEM Design
- Jacket, Deck Design
- Boat Landing Design
- Barge Stability Analysis
- Manifold Design
- Lifting Analysis
- Transportation Analysis
- In Place Analysis
Structures Pipeline
- Route Selection
- Line Pipe Material
Selection
- Pipeline Wall Thickness
- Cathodic Protection
- On‐Bottom Stability
- On‐Bottom Roughness
- Free Span Analysis
- Pipeline Expansion
- Upheaval Buckling
- Lateral Buckling
- Pipeline Crossing
- Shore Approach
- Pipelay Analysis : J‐Lay,
S‐Lay & Reel Lay
- Pipeline Termination
Installation
Riser & Hydrodynamics
- Steel Catenary Risers
(SCRs)
- Hybrid Risers (SHRs &
HRTs)
- Flexible Risers
- Global Performance
Analysis
- Riser Mechanical Design
- Extreme Analysis
- Fatigue Analysis
- VIV Assessment
- Interference/Clashing
Analysis
- Lowering/Deployment
Analysis
- Mooring Analysis &
Design
Drafting
- Drafting Support for all
engineering disciplines
- 3D Modelling
- Installation Procedures
Sketches
- Installation Aids
- Field Architecture
- Sea Fastening
- Fabrication Drawings
14 Page 11-Jun-15 www.NigerStar7.com
Global Oceon - Softwares
Structure
SACS StruCAD NSO/ISYMOST ABAQUS In House Software
(Padeye, Ring Stress) Pipeline
OffPipe Orcaflex AGA PlusOne MathCAD Sage Profile Abaqus
Riser and Hydrodynamic
Orcaflex Shear7 Deeplines In‐house tools
Drafting
PDMS Microstation AutoCAD
15 Page 11-Jun-15 www.NigerStar7.com
LOCAL SCM CAPABI LI TI ES
16 Page 11-Jun-15 www.NigerStar7.com
SCM Department Responsibilities
The SCM department is responsible for the following functional areas:
- Sourcing
- Supplier Management
- Procurement of Goods and Services (PO’s and
Subcontracts)
- Expediting
- Transit / Logistics / Temporary Importation Permit
- Inventory Management & Warehousing
17 Page 11-Jun-15 www.NigerStar7.com
Procurement Process
Prepare Bidders List Request for Quotation (Prepare RFQ, Issue RFQ) Bid Analysis through Bid administration (Receive,Analyse, Negotiate) Supplier Recommendation Purchase Order Post Award expediting
- Our procurement process, standards, guidelines, processes and procedures is
consistent across on all project and non-project activities
- We develop and maintain strategic supplier relationships that bring long-term
value to our business and remain committed to developing local suppliers and adhering to the NCD requirements
18 Page 11-Jun-15 www.NigerStar7.com
Materials & Services Purchased by SCM Nigeria
MATERI ALS Concrete, Mattress I nstrum entation/ Autom ation Fire & Safety Equip Fittings / Connector Lifting/ Rigging Vessel Fuel & Oil ( Bunkering) Diving Gas & Equip Personnel Protective Eqp ( PPE) Valves for Topside/ Subsea Paints Vessel consum ables Cathodic Protection ( Anodes) Pipe Fittings/ Bends Forged I tem s ( Flanges/ Fittings) Steel & Steel Prods I ndustrial Gas Crane/ W inch Purchase W elding Equip & Cons Buoyancy Float Foam ( Buoys/ Fenders) Linepipe / Piping Vessel Spares/ Equipm ( Life rafts/ Boats) Mechanical/ Rotating Equipm ent ( Com pressors, Gens) SERVI CES Scaffolding Services Survey Service Com m unication Equipm ent/ Svc W aste Managem ent Svc Catering Services Fire/ Safety Service Painting/ Sandblasting MPI / NDT Service / Post W eld heat treatm ent Engineering Services 2 nd and 3 rd Party I nspection Tem p Personnel Hire W eather Forecasting Air-Helicopter Svc Line Pipe Coating/ Other coating repairs Pre-Com m issioning Crane & W inch Hire Fabrication ( Minor / Major / Assets) W elding Services Sea Fastening services Other Dest. Testing Cutting Services Diving Services Bolt Tensioning Rigging Services/ Certification Equipm ent Rental / Repairs / Recertification Vessel Victualling Pipeline Services
19 Page 11-Jun-15 www.NigerStar7.com
Nigerdock ( Lagos) and Subsea 7 ( W arri)
OUR YARDS
20 Page 11-Jun-15 www.NigerStar7.com
Nigerdock Yard Presentation
21 Page 11-Jun-15 www.NigerStar7.com
Nigerdock Yard
- Area: 252 hectares, 78 hectares currently in use
- Covered Workshop Areas:
–
Fabrication West: 16,000 m²
–
Fabrication East: 10,000 m²
–
Rolling Shop 3,500 m²
–
2 x Blasting & Painting Shops: 625 m²
–
Internal Lift Capacity (Gantry Cranes): (3.5, 5, 12.5, 20, 32 & 50MT)
- Material Management
- Warehouses: 3,000 m² ; 1,200 m² ; 840 m²
- Laydown Areas: 134,000 m²
- Other
- Various Modern Office Complexes; Fire Station; 24 hour Fully Manned Clinic
- Load Out Quay/ Docks
– Offshore 35 MT/ m 2 100m Load-Out Quay – Offshore 35 MT/ m 2 70m Load-Out Quay – 200m Shipyard Repair Quay – Dry Dock & Floating Dock
- Training School
- 52 Fully Equipped Welding Booths; Pipefitting Benches; Bed Lathe & Axis Milling M/ C’s
- Classrooms
- Housing Complex
– 52 Houses (1 to 10 Bedrooms) – 102 Rooms (Phase 1 of 300 Rooms) – Messing and Recreation Facilities
22 Page 11-Jun-15 www.NigerStar7.com
Nigerdock Yard (Cont’d)
- Main Fabrication Equipment:
– 5 x CNC Profile Machines and 12 Portable Burning Machines – 2x Kaltenbach Saw, 1 x Traenjaeger Saw – 2 Pipe Profiling Machines cutting up to 1 metre diameter, – 4 Sets of Rolling Machines, large rolls 3m wide, small rolls 3.5m wide (thickness varies depending on yield strength of material) – New Pile Rack – 12 x Sub Arc Welding Stations – Gas Fired Furnace
- Mobile Plant & Equipment:
–
Vehicle & Passenger Ferries
–
5 x Fast Boats
–
2 x SPMT Power Packs and Cars (420 MT capacity)
–
2 x 400MT Crawler Cranes
–
2 x 275MT Crawler Cranes
–
1 x 100MT Mobile Crane
–
6 x 80MT Mobile Cranes
–
1 x 55MT Mobile Crane
–
3 x 35MT Mobile Cranes
–
3 x 30MT Mobile Cranes
–
4 x Cherry Picker Mobile Elevated Work Platforms
–
Range of Forklifts up to 50MT
- Welding Capabilities
- SAW, SMAW, TGAW, FCAW, TIG, FLUX CORE
23 Page 11-Jun-15 www.NigerStar7.com
Nigerdock Yard (Cont’d)
Snake I sland I ntegrated Free Zone 2 5 2 Hectares 7 8 Hectares Currently in Use
24 Page 11-Jun-15 www.NigerStar7.com
Nigerdock Yard (Cont’d)
Fabrication W est 1 6 ,0 0 0 m ² Covered Workshops for Construction of Pressure Vessels, Piles and Process Piping Fabrication East 1 0 ,0 0 0 m ² Covered Fabrication Area for Sub-Assemblies External Fabrication Area 1 5 0 ,0 0 0 m ² For Construction, Erection and Load Out of Offshore Structures Multiple Modern Office Solutions
25 Page 11-Jun-15 www.NigerStar7.com
W arri Yard Presentation
26 Page 11-Jun-15 www.NigerStar7.com
Warri Yard
- Area: 22 hectares
- Covered workshop areas circa 16,000 m² :
– Main fabrication hall: 7,000 m² – Plate shop: 1,250 m² (450 m2 + 800 m2 extension) – Super duplex workshop: 1,200 m² – Warehouse: 1,800 m² – Maintenance / Machine shop: 1,800 m² – Elect / Inst. / Workshop / Marine equipment storage: 2,300 m² – Industrial building: 800 m²
- Office accommodation:
– Main office building: 1,300 m² – Client office: 900 m2
- Muller pipe cutting machine up to 24-inch Dia.
- 2 x Oxytom plate cutting machines (120mm - plasma capability)
- Plate rolling machine up to 76.2mm thick.
27 Page 11-Jun-15 www.NigerStar7.com
Warri Yard (Cont’d)
- Indoor lifting capacity:
– Main building : 2 x 25t overhead cranes + 2 x 5 t overhead cranes – Plate shop : 1 x 15t overhead crane – Super duplex workshop : 2 x 5t overhead cranes + 4 jib cranes 1t
- Outdoor lifting capacity:
– 1 American crane 9310 (225t) – 1 Manitowoc crane 4600 (200t) – 3 Manitowoc cranes 4000 (100t) – 1 Manitowoc 3900 (70t) – 4 PPM cranes A400 (35t) – 1 Forlift 15t – 2 Forklift 3t
- Welding capabilities: SAW, SMAW, TGAW, FCAW, etc
- Waterfront: 600 m
- Loading quay: 73 m (2,000t quay 25m x 15m + 2 smaller quays rated at
1,000t and 500t capacity)
28 Page 11-Jun-15 www.NigerStar7.com
Warri Yard (Cont’d)
W arri Yard 2 2 Hectares
29 Page 11-Jun-15 www.NigerStar7.com
ONSHORE CONSTRUCTI ON COMPETENCI ES & CAPACI TY
30 Page 11-Jun-15 www.NigerStar7.com
Construction Competencies and Capacity
Yard maximum capacity : – Nigerdock : Max 3-millions productive man-hours / 12,000t per year – Warri : Max 1-million productive man-hours / 4,000t per year
Com petency Nigerdock S7 W arri
Steel work Yes Yes CS Piping Yes Yes Exotic Piping (Duplex 22% & 25% Cr, clad) ~ Yes Yes Small Bore Piping / Tubing No Yes Fabrication Large Conventional Structures (Jacket, Deck, Helideck, etc) Yes Yes Fabrication Subsea Structures ~ Yes Yes Welding Engineering Yes Yes Painting In-house Subcontracted NDE Subcontracted Subcontracted Lifting Yes Yes
31 Page 11-Jun-15 www.NigerStar7.com
OFFSHORE ASSETS
32 Page 11-Jun-15 www.NigerStar7.com
Offshore Assets
- Seven Antares is a pipelay vessel
ideal for conventional market and hook-up projects
- Length 119m x breadth 32m
- 120t S-lay up to 60-inch pipe
diameter
- 300t main crane
- Accommodation in excess of 330
berths
- Deck area 1,370m2
- Seven Inagha is a jack-up
accommodation and crane barge. Self- propelled and self elevating vessel.
- Length 83.38m x breadth 39.32m
- Leg length 3 x 97.5m
- Crane 2 x 295t
- Accommodation 150 persons
Assets permanently based in Nigeria
33 Page 11-Jun-15 www.NigerStar7.com
Offshore Assets
- Seven Borealis is a state-of-the-art strategic
enabler for ultra-deep and deepwater projects in the world’s harshest environments
- Length 182m x breadth 46m
- 600t tension S-lay up to 46 inch pipe diameter
- 1,000t top tension J-lay system up to 24-inch
pipe diameter
- 2,400t onboard pipe storage
- Heave compensated 5,000t crane
- Accommodation for 399 persons
- 2 x workclass ROVs
- Seven Polaris is a barge for
pipelay and heavy lift activities in deepwater fields, offering IMO Class 3 dynamic positioning
- Length 137m x breadth 39m
- S-lay 136t up to 60-inch pipe
diameter
- Main crane 1,440t
- Accommodation for 262 persons
- 2 x workclass ROVs
Subsea 7 has one of the largest fleet in the industry including 40+ vessels and 175+
- ROV. Vessels can be mobilised in Nigeria to suit projects needs
34 Page 11-Jun-15 www.NigerStar7.com
Offshore Assets
- Seven Esperanca is a construction
vessel, capable of working in water depths of up to 3,000m.
- Length 103.70m x breadth 19.70m
- Deck area 1,150m²
- Heave compensated 150t crane
- Class 2 DP System
- Rockwater 1 is a diving vessel
featuring an 18-man* single bell saturation dive system consisting of three chambers and a hyperbaric lifeboat.
- Length 98m x breadth 18m
- Deck area 550m²
- 120t crane
- 18-man* single bell saturation dive
system
- 1 x observation class ROV
35 Page 11-Jun-15 www.NigerStar7.com
LOCAL CONTENT
36 Page 11-Jun-15 www.NigerStar7.com
Local Content
- Committed to developing Nigerian skilled labour and maximizing in a
sustainable manner, the use of Nigerian human resources, materials, equipment and services
- Dedicated training school at Nigerdock
– Over 2000 personnel trained – 150 trainees currently registered
- Human Capacity Development
– Project management personnel training – Basic and apprenticeship fabrication training programs (welding/ fitting/ machining) – Project specific training program (various competences)
- Substantial capital injection in infrastructure upgrades over the past 18
months at Nigerdock – New equipment, machines, paint shops, rolling and can assembly shop – New offices, accommodation, and warehouse – New and refurbished load-out quays
37 Page 11-Jun-15 www.NigerStar7.com
NI GERI A HOST COMMUNI TY RELATI ONS
38 Page 11-Jun-15 www.NigerStar7.com
Nigeria Host Community Relations
- NigerStar 7 has a long term presence in Nigeria and has carried out many
major projects in the Oil and Gas industry
- NigerStar 7 developed a sustainable policy in the area of Community
Relations and Development (CRD).
- The milestones achievements cut across :
– Employment (circa 200 community youths have gained continuous employment for the past 5 years) – Trainings – Numerous developmental projects (in the areas of health, education and other social amenities such as provision of potable water) – Physical presence in the community (Community Liaison Office in Eket,
- ne of the 4 Core Communities)
– Community empowerment.
39 Page 11-Jun-15 www.NigerStar7.com
Projects have been selected to demonstrate NigerStar 7 capacities and capabilities in executing various types of projects and environment:
- Onshore fabrication (subsea,
conventional & topside)
- SURF in deep water
- Conventional pipelaying and
lifting in shallow water
- Hook-up
MAI N REFERENCES
40 Page 11-Jun-15 www.NigerStar7.com
Erha / Erha North Project (SURF)
Client: ExxonMobil Location: Nigeria Year: 2002 – 2006 Asset: Warri Fabrication Yard Vessels: Seven Polaris, Acergy Legend, Seven Eagle
The Erha Project included the engineering, procurement, fabrication, installation and pre- commissioning of:
- 10 Flowlines/ SCR + 3 flowlines
- Offshore loading buoy (fabrication in Lagos)
- 41 Suctions anchors (FPSO, SPM, manifolds,
SHO)
- Mooring lines (FPSO & SPM),
- 2 Rigid oil offloading line
- Subsea structures, jumpers, etc
- Installation of umbilicals, flying leads, etc
41 Page 11-Jun-15 www.NigerStar7.com
Erha Deepwater Buoy
Client: ExxonMobil Location: Nigeria Asset: Lagos Fabrication Yard Year: 2003 – 2005
The project included:
- Fabrication of the buoy body
- Integration of the turn table
platform
- Load out and launching
- Testing prior to towing
Buoy’s characteristics:
- Diam: 23m
- Height: 10m
- Weight: 920t.
42 Page 11-Jun-15 www.NigerStar7.com
Agbami FPSO Topsides
Client: Chevron Location: Nigeria Year: 2005 Asset: Lagos Fabrication Yard
The project included the fabrication
- f topside module 3S and Std
laydown module 1S for the Agbami FPSO. The scope of work comprised the fabrication engineering, procurement, fabrication of girder beams, construction, pipe works, painting, load-out and seafastening
- f the 2 topside modules.
Topside packages totaling 1,150t.
43 Page 11-Jun-15 www.NigerStar7.com
Shell Bonga FPSO
Client: Shell Nigeria Exploration & Production Company (Snepco) Location: Nigeria, Lagos Year: 2005 Asset: Lagos Fabrication Yard
- 620t of topside structural steel
and pipe works for final integration onto Bonga FPSO,
- Manpower services for onsite
fabrication,
- Construction & shop engineering,
- Procurement of materials,
- Blasting/ painting,
- Hydro testing of pipe spools
- Upgrading the living
accommodation and load-out.
44 Page 11-Jun-15 www.NigerStar7.com
Chevron Meji Platform
Client: Chevron Location: Nigeria Asset: Lagos Fabrication Yard Year: 2005
The Chevron Escravos Gas Project Phase 3A involved the fabrication
- f the Meji and Okan platforms.
The scope of work included:
- The fabrication of the Meji GGCP
jacket & piles,
- Meji GGCP flare bridge & support
tripod,
- Meji GGCP to Meji RP utility
bridge,
- Okan NWP jacket & piles.
45 Page 11-Jun-15 www.NigerStar7.com
Akpo & Usan Manifolds Fabrication
Client: Cameron for Total Location: Nigeria Asset: Warri Fabrication Yard Year: 2005 -2008 (Akpo) / 2008 – 2011 (Usan)
Akpo project (1,500t)
- 7x Production manifolds,
- 1x Gas manifold
- 8x Manifold support structures,
- 10x Suction piles,
Usan project (2,400t)
- 8x Production manifolds,
- 8x Manifold support structures,
- 8x Suction piles,
- 43x Tree guide bases
46 Page 11-Jun-15 www.NigerStar7.com
Total Usan FPSO Topsides
Client: Total Location: Nigeria Asset: Lagos Fabrication Yard Year: 2008
The scope of work included:
- Fabrication of over 7,500 tons of
structural steel components,
- Modules P1 and S1,
- 15 sets of pressure vessels,
- Flare tower,
- Fabrication of the helideck,
- Mooring protection structures.
47 Page 11-Jun-15 www.NigerStar7.com
EPC4A – Greenfield Scope of Work
Client: ExxonMobil Location: Nigeria Year: 2008 – 2009 Vessels: Acergy Orion, Seven Polaris
EPC4A Project included the transportation and installation of:
- 3 Jackets
- 3 Decks
- 3 Bridges
- 2 Flare towers adjacent to the
existing Idoho and Ubit platforms to support new flares
48 Page 11-Jun-15 www.NigerStar7.com
EPC4A – Brownfield Hook-Up Scope of Work
Client: ExxonMobil Location: Nigeria Year: 2008 – 2010 Vessels: Acergy Orion, Seven Polaris
EPC4A Project – Brownfield scope included the Transportation, Installation, Retrofit & Revamp, Hook-Up and Commissioning of Production and wellhead Platforms which includes:
- Iyak A – Full Revamp (Deck Ext.)
- Unam A - Full Revamp (Deck Ext.)
- Unam C – Partial Revamp (Deck Ext.)
- Mfem B – Partial Revamp (Deck Ext.)
- Ubit B – Partial Revamp (Deck Ext.)
- Unam D – Partial Revamp (Deck Ext.)
UNAM D
49 Page 11-Jun-15 www.NigerStar7.com
EPC4A Hook-up – 4th Compressor
Client: ExxonMobil Location: Nigeria Year: 2009 – 2011 Vessels: Acergy Orion, Seven Polaris
The project scope of work included:
- Seven Polaris - Heavy Lift of
Compressor/ Turbine – 100mT
- Installation of 3 Nos. Inter-stage Coolers
- Approx. 50mT each
- Fabrication and Installation / Hook-Up of:
- Structural – 88mT
- Piping CS & SS – 63mT
- Commissioning and Start Up of
Compressor Package
50 Page 11-Jun-15 www.NigerStar7.com
Chevron EGP3B
Client: Chevron Location: Nigeria Year: 2009 – 2012 Vessels: Seven Polaris, Acergy Hawk, Seven Antares
The Escravos Gas Project 3B consisted of the EPCI of:
- 7 Offshore pipelines, dia
16 to 28”, total length 110 km.
- Clamps, risers, riser
guards and spools
51 Page 11-Jun-15 www.NigerStar7.com
OSO RE Pipeline Replacement Project
Client: ExxonMobil/ MPN Location: Nigeria Year: 2010 – 2011 Vessels: Seven Polaris, Seven Antares, Seven Hawk & Orion
OSO RE Pipeline replacement included:
- Remove corroded risers and
portions of existing corroded pipelines
- Install 4 CRA (corrosion
resistance alloy) lined pipelines & risers to replace existing corroded carbon steel pipelines
52 Page 11-Jun-15 www.NigerStar7.com
OSO RE Topside Project
Client: ExxonMobil/ MPN Location: Nigeria Year: 2011– 2012 Vessels: Seven Orion, Seven Inagha, Lewek Leader, Cutlass Fish
OSO RE Topside Project included:
- Tie-ins at RB, RD, RE, RH and RR
- Upgrade the instrument/ power gas
systems for reliable injection system operation
- Provide chemical injection system
for topsides piping corrosion inhibition
- Restore fire damaged facilities at
RE platform
53 Page 11-Jun-15 www.NigerStar7.com
Satellite Field Phase 1
Client: ExxonMobil Location: Nigeria Year: 2011 – 2012 Vessels: Seven Polaris, Seven Antares, Seven Inagha
The MPN Satellite Field Development Project consisted of:
- Installation of 3 new Wellhead
platforms (Abang, Oyot and Itut)
- Installation of 3 shallow water
pipelines, in depths ranging from 16m to 28m. The pipelines linked the new Wellhead platforms to the Host platforms (Usari and Ubit)
54 Page 11-Jun-15 www.NigerStar7.com
OFON Phase 2 Project
Client: TOTAL E&P Nigeria Location: Nigeria Year: 2011 - On-going Vessels: Seven Borealis, Rockwater 2, Simar Esperanca, Seisranger, Seven Antares
The OFON 2 Project consists of the EPCI of :
- Fabrication and installation 2
new wellhead platforms (OFD3 & OFD5) and 2 bridges
- Laying 8 pipelines dia. 4” to
16”, 105 km,
- Clamps, risers, riser guards
and spools
- Laying 2 electrical cables
(10kms)
- Hook-up
55 Page 11-Jun-15 www.NigerStar7.com
Erha North Project Phase 2
Client: EEPNL Location: Nigeria Year: 2013 - Ongoing Vessels: Seven Borealis, Seven Pacific, Simar Esperanca, Jascon 25 (WAV), Jascon 31 (WAV) The Project consists of an extension of the existing Erha subsea system and infrastructure:
- EPCI of the new production lines and associated
structures, jumpers and steel catenary riser
- EPCI of new water injection lines and
associated structures jumpers and steel catenary riser
- T&I of Umbilicals and associated UTA, SDU,
flying leads, production and water injection manifolds, gas lift module, pigging loop module, including removal of existing Jumpers and flying leads and EPCI of new jumpers
- Modifications of the existing FPSO ,topside
- Installation of 3 subsea manifolds and 2
modules