NigerStar 7 Com pany Overview & Capabilities June 2015 11-Jun-15 Page 1 www.NigerStar7.com Safety and Core Values About NigerStar 7 Local Engineering Capabilities Local SCM Capabilities Agenda Our Yards


slide-1
SLIDE 1

1 Page 11-Jun-15 www.NigerStar7.com

NigerStar 7

Com pany Overview & Capabilities

June 2015

slide-2
SLIDE 2

2 Page 11-Jun-15 www.NigerStar7.com

  • Safety and Core Values
  • About NigerStar 7
  • Local Engineering Capabilities
  • Local SCM Capabilities
  • Our Yards
  • Onshore Construction

Competencies and Capacity

  • Offshore Assets
  • Local Content
  • Nigeria Host Community Relations
  • Main References

Agenda

slide-3
SLIDE 3

3 Page 11-Jun-15 www.NigerStar7.com

Safety is one of our core values

  • NigerStar 7 is committed to an incident-free workplace,

everyday, everywhere. Our performance depends on our ability to continually improve the quality of the services we provide to our clients, while protecting people and minimising the impact on the environment.

  • We will always communicate openly on HSEQ

issues with our stakeholders and share with them our experience and knowledge of successful HSEQ initiatives.

slide-4
SLIDE 4

4 Page 11-Jun-15 www.NigerStar7.com

Our core values

Safety I ntegrity I nnovation Perform ance Collaboration

slide-5
SLIDE 5

5 Page 11-Jun-15 www.NigerStar7.com

NigerStar 7 Presentation

About NigerStar 7

Nigerstar7-Update-v2.mp4

slide-6
SLIDE 6

6 Page 11-Jun-15 www.NigerStar7.com

NigerStar 7, a Nigerian EPCI Contactor

  • Joint venture company, created by

Jagal and Subsea 7

  • NigerStar 7 is a majority owned

Nigerian company

slide-7
SLIDE 7

7 Page 11-Jun-15 www.NigerStar7.com

Our Locations in Nigeria

Nigerstar7 Nigerstar7 Nigerstar7 Nigerstar7

NigerStar 7 operates from 4 locations:

  • Lagos: Head Office in Victoria

Island, Lagos State

  • Lagos: Fabrication yard in Snake

Island Free Zone, Lagos State

  • W arri: Fabrication yard (Delta

State)

  • Onne / Port Harcourt:

Offshore support, logistics base and operations at Federal Ocean Terminal (Rivers State)

slide-8
SLIDE 8

8 Page 11-Jun-15 www.NigerStar7.com

Main Expertises

  • Deepwater expertise (Subsea Umbilicals,

Risers and Flowlines - SURF)

  • Conventional field development projects

and hook-up revamping

  • Project management expertise
  • Engineering (detailed and installation)
  • Fabrication (facilities in Lagos and Warri)
  • Installation expertise of Subsea 7
slide-9
SLIDE 9

9 Page 11-Jun-15 www.NigerStar7.com

Capabilities and Capacities

  • Workforce of 1,000+ experienced

people located in Lagos, Port Harcourt and Warri

  • 2 fabrication yards in Lagos and Warri

with a total maximum capacity of 4- million productive man-hours per year

  • Support of Subsea 7’s offshore

construction fleet, one of the largest in the industry

slide-10
SLIDE 10

10 Page 11-Jun-15 www.NigerStar7.com

Capabilities and Capacities (Cont’d) NigerStar 7 performs the engineering, procurement, construction, installation and commissioning of:

  • Platforms (jacket, piles & topsides), topside modules and flares
  • Riser towers
  • Manifolds
  • Buoyancy tanks, offloading buoys
  • Suction and anchor piles, PLETs, PLEMs, FLETs, FTA, ITA
  • Double joints, pipe-in-pipe, reeled pipelines
  • Jumpers and spools
  • FPSO modules, helidecks
slide-11
SLIDE 11

11 Page 11-Jun-15 www.NigerStar7.com

LOCAL ENGI NEERI NG CAPABI LI TI ES

slide-12
SLIDE 12

12 Page 11-Jun-15 www.NigerStar7.com

Global Oceon - Personnel

Global Oceon = Subsea 7 + Petrolog Group

9 5 %

5 %

Nigerians Expatriates

7 3 % 2 7 %

Engineers Non- Engineers

Workforce Profile Total Nigerians 56 Expatriates 3 Engineers 43 Non‐Engineers 16 TOTAL NO. OF EMPLOYEES = 59 NCD Trainees = 9 Not included in the headcount NCD Trainees = 9 Not included in the headcount

slide-13
SLIDE 13

13 Page 11-Jun-15 www.NigerStar7.com

Global Oceon - Departments

  • Seafastening
  • Installation Aids
  • Barge Strength Analysis
  • PLET/PLEM Design
  • Jacket, Deck Design
  • Boat Landing Design
  • Barge Stability Analysis
  • Manifold Design
  • Lifting Analysis
  • Transportation Analysis
  • In Place Analysis

Structures Pipeline

  • Route Selection
  • Line Pipe Material

Selection

  • Pipeline Wall Thickness
  • Cathodic Protection
  • On‐Bottom Stability
  • On‐Bottom Roughness
  • Free Span Analysis
  • Pipeline Expansion
  • Upheaval Buckling
  • Lateral Buckling
  • Pipeline Crossing
  • Shore Approach
  • Pipelay Analysis : J‐Lay,

S‐Lay & Reel Lay

  • Pipeline Termination

Installation

Riser & Hydrodynamics

  • Steel Catenary Risers

(SCRs)

  • Hybrid Risers (SHRs &

HRTs)

  • Flexible Risers
  • Global Performance

Analysis

  • Riser Mechanical Design
  • Extreme Analysis
  • Fatigue Analysis
  • VIV Assessment
  • Interference/Clashing

Analysis

  • Lowering/Deployment

Analysis

  • Mooring Analysis &

Design

Drafting

  • Drafting Support for all

engineering disciplines

  • 3D Modelling
  • Installation Procedures

Sketches

  • Installation Aids
  • Field Architecture
  • Sea Fastening
  • Fabrication Drawings
slide-14
SLIDE 14

14 Page 11-Jun-15 www.NigerStar7.com

Global Oceon - Softwares

Structure

 SACS  StruCAD  NSO/ISYMOST  ABAQUS  In House Software

(Padeye, Ring Stress) Pipeline

 OffPipe  Orcaflex  AGA  PlusOne  MathCAD  Sage Profile  Abaqus

Riser and Hydrodynamic

 Orcaflex  Shear7  Deeplines  In‐house tools

Drafting

 PDMS  Microstation  AutoCAD

slide-15
SLIDE 15

15 Page 11-Jun-15 www.NigerStar7.com

LOCAL SCM CAPABI LI TI ES

slide-16
SLIDE 16

16 Page 11-Jun-15 www.NigerStar7.com

SCM Department Responsibilities

The SCM department is responsible for the following functional areas:

  • Sourcing
  • Supplier Management
  • Procurement of Goods and Services (PO’s and

Subcontracts)

  • Expediting
  • Transit / Logistics / Temporary Importation Permit
  • Inventory Management & Warehousing
slide-17
SLIDE 17

17 Page 11-Jun-15 www.NigerStar7.com

Procurement Process

Prepare Bidders List Request for Quotation (Prepare RFQ, Issue RFQ) Bid Analysis through Bid administration (Receive,Analyse, Negotiate) Supplier Recommendation Purchase Order Post Award expediting

  • Our procurement process, standards, guidelines, processes and procedures is

consistent across on all project and non-project activities

  • We develop and maintain strategic supplier relationships that bring long-term

value to our business and remain committed to developing local suppliers and adhering to the NCD requirements

slide-18
SLIDE 18

18 Page 11-Jun-15 www.NigerStar7.com

Materials & Services Purchased by SCM Nigeria

MATERI ALS Concrete, Mattress I nstrum entation/ Autom ation Fire & Safety Equip Fittings / Connector Lifting/ Rigging Vessel Fuel & Oil ( Bunkering) Diving Gas & Equip Personnel Protective Eqp ( PPE) Valves for Topside/ Subsea Paints Vessel consum ables Cathodic Protection ( Anodes) Pipe Fittings/ Bends Forged I tem s ( Flanges/ Fittings) Steel & Steel Prods I ndustrial Gas Crane/ W inch Purchase W elding Equip & Cons Buoyancy Float Foam ( Buoys/ Fenders) Linepipe / Piping Vessel Spares/ Equipm ( Life rafts/ Boats) Mechanical/ Rotating Equipm ent ( Com pressors, Gens) SERVI CES Scaffolding Services Survey Service Com m unication Equipm ent/ Svc W aste Managem ent Svc Catering Services Fire/ Safety Service Painting/ Sandblasting MPI / NDT Service / Post W eld heat treatm ent Engineering Services 2 nd and 3 rd Party I nspection Tem p Personnel Hire W eather Forecasting Air-Helicopter Svc Line Pipe Coating/ Other coating repairs Pre-Com m issioning Crane & W inch Hire Fabrication ( Minor / Major / Assets) W elding Services Sea Fastening services Other Dest. Testing Cutting Services Diving Services Bolt Tensioning Rigging Services/ Certification Equipm ent Rental / Repairs / Recertification Vessel Victualling Pipeline Services

slide-19
SLIDE 19

19 Page 11-Jun-15 www.NigerStar7.com

Nigerdock ( Lagos) and Subsea 7 ( W arri)

OUR YARDS

slide-20
SLIDE 20

20 Page 11-Jun-15 www.NigerStar7.com

Nigerdock Yard Presentation

slide-21
SLIDE 21

21 Page 11-Jun-15 www.NigerStar7.com

Nigerdock Yard

  • Area: 252 hectares, 78 hectares currently in use
  • Covered Workshop Areas:

Fabrication West: 16,000 m²

Fabrication East: 10,000 m²

Rolling Shop 3,500 m²

2 x Blasting & Painting Shops: 625 m²

Internal Lift Capacity (Gantry Cranes): (3.5, 5, 12.5, 20, 32 & 50MT)

  • Material Management
  • Warehouses: 3,000 m² ; 1,200 m² ; 840 m²
  • Laydown Areas: 134,000 m²
  • Other
  • Various Modern Office Complexes; Fire Station; 24 hour Fully Manned Clinic
  • Load Out Quay/ Docks

– Offshore 35 MT/ m 2 100m Load-Out Quay – Offshore 35 MT/ m 2 70m Load-Out Quay – 200m Shipyard Repair Quay – Dry Dock & Floating Dock

  • Training School
  • 52 Fully Equipped Welding Booths; Pipefitting Benches; Bed Lathe & Axis Milling M/ C’s
  • Classrooms
  • Housing Complex

– 52 Houses (1 to 10 Bedrooms) – 102 Rooms (Phase 1 of 300 Rooms) – Messing and Recreation Facilities

slide-22
SLIDE 22

22 Page 11-Jun-15 www.NigerStar7.com

Nigerdock Yard (Cont’d)

  • Main Fabrication Equipment:

– 5 x CNC Profile Machines and 12 Portable Burning Machines – 2x Kaltenbach Saw, 1 x Traenjaeger Saw – 2 Pipe Profiling Machines cutting up to 1 metre diameter, – 4 Sets of Rolling Machines, large rolls 3m wide, small rolls 3.5m wide (thickness varies depending on yield strength of material) – New Pile Rack – 12 x Sub Arc Welding Stations – Gas Fired Furnace

  • Mobile Plant & Equipment:

Vehicle & Passenger Ferries

5 x Fast Boats

2 x SPMT Power Packs and Cars (420 MT capacity)

2 x 400MT Crawler Cranes

2 x 275MT Crawler Cranes

1 x 100MT Mobile Crane

6 x 80MT Mobile Cranes

1 x 55MT Mobile Crane

3 x 35MT Mobile Cranes

3 x 30MT Mobile Cranes

4 x Cherry Picker Mobile Elevated Work Platforms

Range of Forklifts up to 50MT

  • Welding Capabilities
  • SAW, SMAW, TGAW, FCAW, TIG, FLUX CORE
slide-23
SLIDE 23

23 Page 11-Jun-15 www.NigerStar7.com

Nigerdock Yard (Cont’d)

Snake I sland I ntegrated Free Zone 2 5 2 Hectares 7 8 Hectares Currently in Use

slide-24
SLIDE 24

24 Page 11-Jun-15 www.NigerStar7.com

Nigerdock Yard (Cont’d)

Fabrication W est 1 6 ,0 0 0 m ² Covered Workshops for Construction of Pressure Vessels, Piles and Process Piping Fabrication East 1 0 ,0 0 0 m ² Covered Fabrication Area for Sub-Assemblies External Fabrication Area 1 5 0 ,0 0 0 m ² For Construction, Erection and Load Out of Offshore Structures Multiple Modern Office Solutions

slide-25
SLIDE 25

25 Page 11-Jun-15 www.NigerStar7.com

W arri Yard Presentation

slide-26
SLIDE 26

26 Page 11-Jun-15 www.NigerStar7.com

Warri Yard

  • Area: 22 hectares
  • Covered workshop areas circa 16,000 m² :

– Main fabrication hall: 7,000 m² – Plate shop: 1,250 m² (450 m2 + 800 m2 extension) – Super duplex workshop: 1,200 m² – Warehouse: 1,800 m² – Maintenance / Machine shop: 1,800 m² – Elect / Inst. / Workshop / Marine equipment storage: 2,300 m² – Industrial building: 800 m²

  • Office accommodation:

– Main office building: 1,300 m² – Client office: 900 m2

  • Muller pipe cutting machine up to 24-inch Dia.
  • 2 x Oxytom plate cutting machines (120mm - plasma capability)
  • Plate rolling machine up to 76.2mm thick.
slide-27
SLIDE 27

27 Page 11-Jun-15 www.NigerStar7.com

Warri Yard (Cont’d)

  • Indoor lifting capacity:

– Main building : 2 x 25t overhead cranes + 2 x 5 t overhead cranes – Plate shop : 1 x 15t overhead crane – Super duplex workshop : 2 x 5t overhead cranes + 4 jib cranes 1t

  • Outdoor lifting capacity:

– 1 American crane 9310 (225t) – 1 Manitowoc crane 4600 (200t) – 3 Manitowoc cranes 4000 (100t) – 1 Manitowoc 3900 (70t) – 4 PPM cranes A400 (35t) – 1 Forlift 15t – 2 Forklift 3t

  • Welding capabilities: SAW, SMAW, TGAW, FCAW, etc
  • Waterfront: 600 m
  • Loading quay: 73 m (2,000t quay 25m x 15m + 2 smaller quays rated at

1,000t and 500t capacity)

slide-28
SLIDE 28

28 Page 11-Jun-15 www.NigerStar7.com

Warri Yard (Cont’d)

W arri Yard 2 2 Hectares

slide-29
SLIDE 29

29 Page 11-Jun-15 www.NigerStar7.com

ONSHORE CONSTRUCTI ON COMPETENCI ES & CAPACI TY

slide-30
SLIDE 30

30 Page 11-Jun-15 www.NigerStar7.com

Construction Competencies and Capacity

Yard maximum capacity : – Nigerdock : Max 3-millions productive man-hours / 12,000t per year – Warri : Max 1-million productive man-hours / 4,000t per year

Com petency Nigerdock S7 W arri

Steel work Yes Yes CS Piping Yes Yes Exotic Piping (Duplex 22% & 25% Cr, clad) ~ Yes Yes Small Bore Piping / Tubing No Yes Fabrication Large Conventional Structures (Jacket, Deck, Helideck, etc) Yes Yes Fabrication Subsea Structures ~ Yes Yes Welding Engineering Yes Yes Painting In-house Subcontracted NDE Subcontracted Subcontracted Lifting Yes Yes

slide-31
SLIDE 31

31 Page 11-Jun-15 www.NigerStar7.com

OFFSHORE ASSETS

slide-32
SLIDE 32

32 Page 11-Jun-15 www.NigerStar7.com

Offshore Assets

  • Seven Antares is a pipelay vessel

ideal for conventional market and hook-up projects

  • Length 119m x breadth 32m
  • 120t S-lay up to 60-inch pipe

diameter

  • 300t main crane
  • Accommodation in excess of 330

berths

  • Deck area 1,370m2
  • Seven Inagha is a jack-up

accommodation and crane barge. Self- propelled and self elevating vessel.

  • Length 83.38m x breadth 39.32m
  • Leg length 3 x 97.5m
  • Crane 2 x 295t
  • Accommodation 150 persons

Assets permanently based in Nigeria

slide-33
SLIDE 33

33 Page 11-Jun-15 www.NigerStar7.com

Offshore Assets

  • Seven Borealis is a state-of-the-art strategic

enabler for ultra-deep and deepwater projects in the world’s harshest environments

  • Length 182m x breadth 46m
  • 600t tension S-lay up to 46 inch pipe diameter
  • 1,000t top tension J-lay system up to 24-inch

pipe diameter

  • 2,400t onboard pipe storage
  • Heave compensated 5,000t crane
  • Accommodation for 399 persons
  • 2 x workclass ROVs
  • Seven Polaris is a barge for

pipelay and heavy lift activities in deepwater fields, offering IMO Class 3 dynamic positioning

  • Length 137m x breadth 39m
  • S-lay 136t up to 60-inch pipe

diameter

  • Main crane 1,440t
  • Accommodation for 262 persons
  • 2 x workclass ROVs

Subsea 7 has one of the largest fleet in the industry including 40+ vessels and 175+

  • ROV. Vessels can be mobilised in Nigeria to suit projects needs
slide-34
SLIDE 34

34 Page 11-Jun-15 www.NigerStar7.com

Offshore Assets

  • Seven Esperanca is a construction

vessel, capable of working in water depths of up to 3,000m.

  • Length 103.70m x breadth 19.70m
  • Deck area 1,150m²
  • Heave compensated 150t crane
  • Class 2 DP System
  • Rockwater 1 is a diving vessel

featuring an 18-man* single bell saturation dive system consisting of three chambers and a hyperbaric lifeboat.

  • Length 98m x breadth 18m
  • Deck area 550m²
  • 120t crane
  • 18-man* single bell saturation dive

system

  • 1 x observation class ROV
slide-35
SLIDE 35

35 Page 11-Jun-15 www.NigerStar7.com

LOCAL CONTENT

slide-36
SLIDE 36

36 Page 11-Jun-15 www.NigerStar7.com

Local Content

  • Committed to developing Nigerian skilled labour and maximizing in a

sustainable manner, the use of Nigerian human resources, materials, equipment and services

  • Dedicated training school at Nigerdock

– Over 2000 personnel trained – 150 trainees currently registered

  • Human Capacity Development

– Project management personnel training – Basic and apprenticeship fabrication training programs (welding/ fitting/ machining) – Project specific training program (various competences)

  • Substantial capital injection in infrastructure upgrades over the past 18

months at Nigerdock – New equipment, machines, paint shops, rolling and can assembly shop – New offices, accommodation, and warehouse – New and refurbished load-out quays

slide-37
SLIDE 37

37 Page 11-Jun-15 www.NigerStar7.com

NI GERI A HOST COMMUNI TY RELATI ONS

slide-38
SLIDE 38

38 Page 11-Jun-15 www.NigerStar7.com

Nigeria Host Community Relations

  • NigerStar 7 has a long term presence in Nigeria and has carried out many

major projects in the Oil and Gas industry

  • NigerStar 7 developed a sustainable policy in the area of Community

Relations and Development (CRD).

  • The milestones achievements cut across :

– Employment (circa 200 community youths have gained continuous employment for the past 5 years) – Trainings – Numerous developmental projects (in the areas of health, education and other social amenities such as provision of potable water) – Physical presence in the community (Community Liaison Office in Eket,

  • ne of the 4 Core Communities)

– Community empowerment.

slide-39
SLIDE 39

39 Page 11-Jun-15 www.NigerStar7.com

Projects have been selected to demonstrate NigerStar 7 capacities and capabilities in executing various types of projects and environment:

  • Onshore fabrication (subsea,

conventional & topside)

  • SURF in deep water
  • Conventional pipelaying and

lifting in shallow water

  • Hook-up

MAI N REFERENCES

slide-40
SLIDE 40

40 Page 11-Jun-15 www.NigerStar7.com

Erha / Erha North Project (SURF)

Client: ExxonMobil Location: Nigeria Year: 2002 – 2006 Asset: Warri Fabrication Yard Vessels: Seven Polaris, Acergy Legend, Seven Eagle

The Erha Project included the engineering, procurement, fabrication, installation and pre- commissioning of:

  • 10 Flowlines/ SCR + 3 flowlines
  • Offshore loading buoy (fabrication in Lagos)
  • 41 Suctions anchors (FPSO, SPM, manifolds,

SHO)

  • Mooring lines (FPSO & SPM),
  • 2 Rigid oil offloading line
  • Subsea structures, jumpers, etc
  • Installation of umbilicals, flying leads, etc
slide-41
SLIDE 41

41 Page 11-Jun-15 www.NigerStar7.com

Erha Deepwater Buoy

Client: ExxonMobil Location: Nigeria Asset: Lagos Fabrication Yard Year: 2003 – 2005

The project included:

  • Fabrication of the buoy body
  • Integration of the turn table

platform

  • Load out and launching
  • Testing prior to towing

Buoy’s characteristics:

  • Diam: 23m
  • Height: 10m
  • Weight: 920t.
slide-42
SLIDE 42

42 Page 11-Jun-15 www.NigerStar7.com

Agbami FPSO Topsides

Client: Chevron Location: Nigeria Year: 2005 Asset: Lagos Fabrication Yard

The project included the fabrication

  • f topside module 3S and Std

laydown module 1S for the Agbami FPSO. The scope of work comprised the fabrication engineering, procurement, fabrication of girder beams, construction, pipe works, painting, load-out and seafastening

  • f the 2 topside modules.

Topside packages totaling 1,150t.

slide-43
SLIDE 43

43 Page 11-Jun-15 www.NigerStar7.com

Shell Bonga FPSO

Client: Shell Nigeria Exploration & Production Company (Snepco) Location: Nigeria, Lagos Year: 2005 Asset: Lagos Fabrication Yard

  • 620t of topside structural steel

and pipe works for final integration onto Bonga FPSO,

  • Manpower services for onsite

fabrication,

  • Construction & shop engineering,
  • Procurement of materials,
  • Blasting/ painting,
  • Hydro testing of pipe spools
  • Upgrading the living

accommodation and load-out.

slide-44
SLIDE 44

44 Page 11-Jun-15 www.NigerStar7.com

Chevron Meji Platform

Client: Chevron Location: Nigeria Asset: Lagos Fabrication Yard Year: 2005

The Chevron Escravos Gas Project Phase 3A involved the fabrication

  • f the Meji and Okan platforms.

The scope of work included:

  • The fabrication of the Meji GGCP

jacket & piles,

  • Meji GGCP flare bridge & support

tripod,

  • Meji GGCP to Meji RP utility

bridge,

  • Okan NWP jacket & piles.
slide-45
SLIDE 45

45 Page 11-Jun-15 www.NigerStar7.com

Akpo & Usan Manifolds Fabrication

Client: Cameron for Total Location: Nigeria Asset: Warri Fabrication Yard Year: 2005 -2008 (Akpo) / 2008 – 2011 (Usan)

Akpo project (1,500t)

  • 7x Production manifolds,
  • 1x Gas manifold
  • 8x Manifold support structures,
  • 10x Suction piles,

Usan project (2,400t)

  • 8x Production manifolds,
  • 8x Manifold support structures,
  • 8x Suction piles,
  • 43x Tree guide bases
slide-46
SLIDE 46

46 Page 11-Jun-15 www.NigerStar7.com

Total Usan FPSO Topsides

Client: Total Location: Nigeria Asset: Lagos Fabrication Yard Year: 2008

The scope of work included:

  • Fabrication of over 7,500 tons of

structural steel components,

  • Modules P1 and S1,
  • 15 sets of pressure vessels,
  • Flare tower,
  • Fabrication of the helideck,
  • Mooring protection structures.
slide-47
SLIDE 47

47 Page 11-Jun-15 www.NigerStar7.com

EPC4A – Greenfield Scope of Work

Client: ExxonMobil Location: Nigeria Year: 2008 – 2009 Vessels: Acergy Orion, Seven Polaris

EPC4A Project included the transportation and installation of:

  • 3 Jackets
  • 3 Decks
  • 3 Bridges
  • 2 Flare towers adjacent to the

existing Idoho and Ubit platforms to support new flares

slide-48
SLIDE 48

48 Page 11-Jun-15 www.NigerStar7.com

EPC4A – Brownfield Hook-Up Scope of Work

Client: ExxonMobil Location: Nigeria Year: 2008 – 2010 Vessels: Acergy Orion, Seven Polaris

EPC4A Project – Brownfield scope included the Transportation, Installation, Retrofit & Revamp, Hook-Up and Commissioning of Production and wellhead Platforms which includes:

  • Iyak A – Full Revamp (Deck Ext.)
  • Unam A - Full Revamp (Deck Ext.)
  • Unam C – Partial Revamp (Deck Ext.)
  • Mfem B – Partial Revamp (Deck Ext.)
  • Ubit B – Partial Revamp (Deck Ext.)
  • Unam D – Partial Revamp (Deck Ext.)

UNAM D

slide-49
SLIDE 49

49 Page 11-Jun-15 www.NigerStar7.com

EPC4A Hook-up – 4th Compressor

Client: ExxonMobil Location: Nigeria Year: 2009 – 2011 Vessels: Acergy Orion, Seven Polaris

The project scope of work included:

  • Seven Polaris - Heavy Lift of

Compressor/ Turbine – 100mT

  • Installation of 3 Nos. Inter-stage Coolers
  • Approx. 50mT each
  • Fabrication and Installation / Hook-Up of:
  • Structural – 88mT
  • Piping CS & SS – 63mT
  • Commissioning and Start Up of

Compressor Package

slide-50
SLIDE 50

50 Page 11-Jun-15 www.NigerStar7.com

Chevron EGP3B

Client: Chevron Location: Nigeria Year: 2009 – 2012 Vessels: Seven Polaris, Acergy Hawk, Seven Antares

The Escravos Gas Project 3B consisted of the EPCI of:

  • 7 Offshore pipelines, dia

16 to 28”, total length 110 km.

  • Clamps, risers, riser

guards and spools

slide-51
SLIDE 51

51 Page 11-Jun-15 www.NigerStar7.com

OSO RE Pipeline Replacement Project

Client: ExxonMobil/ MPN Location: Nigeria Year: 2010 – 2011 Vessels: Seven Polaris, Seven Antares, Seven Hawk & Orion

OSO RE Pipeline replacement included:

  • Remove corroded risers and

portions of existing corroded pipelines

  • Install 4 CRA (corrosion

resistance alloy) lined pipelines & risers to replace existing corroded carbon steel pipelines

slide-52
SLIDE 52

52 Page 11-Jun-15 www.NigerStar7.com

OSO RE Topside Project

Client: ExxonMobil/ MPN Location: Nigeria Year: 2011– 2012 Vessels: Seven Orion, Seven Inagha, Lewek Leader, Cutlass Fish

OSO RE Topside Project included:

  • Tie-ins at RB, RD, RE, RH and RR
  • Upgrade the instrument/ power gas

systems for reliable injection system operation

  • Provide chemical injection system

for topsides piping corrosion inhibition

  • Restore fire damaged facilities at

RE platform

slide-53
SLIDE 53

53 Page 11-Jun-15 www.NigerStar7.com

Satellite Field Phase 1

Client: ExxonMobil Location: Nigeria Year: 2011 – 2012 Vessels: Seven Polaris, Seven Antares, Seven Inagha

The MPN Satellite Field Development Project consisted of:

  • Installation of 3 new Wellhead

platforms (Abang, Oyot and Itut)

  • Installation of 3 shallow water

pipelines, in depths ranging from 16m to 28m. The pipelines linked the new Wellhead platforms to the Host platforms (Usari and Ubit)

slide-54
SLIDE 54

54 Page 11-Jun-15 www.NigerStar7.com

OFON Phase 2 Project

Client: TOTAL E&P Nigeria Location: Nigeria Year: 2011 - On-going Vessels: Seven Borealis, Rockwater 2, Simar Esperanca, Seisranger, Seven Antares

The OFON 2 Project consists of the EPCI of :

  • Fabrication and installation 2

new wellhead platforms (OFD3 & OFD5) and 2 bridges

  • Laying 8 pipelines dia. 4” to

16”, 105 km,

  • Clamps, risers, riser guards

and spools

  • Laying 2 electrical cables

(10kms)

  • Hook-up
slide-55
SLIDE 55

55 Page 11-Jun-15 www.NigerStar7.com

Erha North Project Phase 2

Client: EEPNL Location: Nigeria Year: 2013 - Ongoing Vessels: Seven Borealis, Seven Pacific, Simar Esperanca, Jascon 25 (WAV), Jascon 31 (WAV) The Project consists of an extension of the existing Erha subsea system and infrastructure:

  • EPCI of the new production lines and associated

structures, jumpers and steel catenary riser

  • EPCI of new water injection lines and

associated structures jumpers and steel catenary riser

  • T&I of Umbilicals and associated UTA, SDU,

flying leads, production and water injection manifolds, gas lift module, pigging loop module, including removal of existing Jumpers and flying leads and EPCI of new jumpers

  • Modifications of the existing FPSO ,topside
  • Installation of 3 subsea manifolds and 2

modules

slide-56
SLIDE 56

56 Page 11-Jun-15 www.NigerStar7.com