SLIDE 1 Presented By: Eric Loewen, P.Eng. & Felipe Tabet, P.Eng. - AECOM
Detailed Design of the Crescent Lake Causeway
Presentation to City Council
January 14, 2019
SLIDE 2 OUTLINE OF PRESENTATION
- Roundabout Geometry, Refinements since the
Preliminary Design and Safety
- Construction Staging
- Truck Movements
- Structural Design
- Landscape Architecture
- Roadway and Pathway Signs
- Cost Estimate
- Video Presentation
SLIDE 3 ROUNDABOUT GEOMETRY AND REFINEMENTS TO THE PRELIMINARY DESIGN
Roundabouts:
- Reduce conflict points
- Reduce vehicle speeds
- Reduce collision angles
SLIDE 4
CONSTRUCTION STAGING: STAGE 1 - 2019
SLIDE 5
CONSTRUCTION STAGING: STAGE 2 - 2019
SLIDE 6
CONSTRUCTION STAGING: STAGE 3 - 2020
SLIDE 7
CONSTRUCTION STAGING: STAGE 4 - 2020
SLIDE 8
NORTH-SOUTH TRUCK MOVEMENTS
SLIDE 9
EAST-WEST TRUCK MOVEMENTS
SLIDE 10
STRUCTURAL DESIGN
SLIDE 11
LANDSCAPE ARCHITECTURE
SLIDE 12
LANDSCAPE ARCHITECTURE
SLIDE 13
LANDSCAPE ARCHITECTURE
SLIDE 14
ROADWAY AND PATH SIGNS
SLIDE 15
ROADWAY AND PATH SIGNS
SLIDE 16
ROADWAY AND PATH SIGNS
SLIDE 17
COST ESTIMATE
Item Cost ($)
Mobilization, Demobilization & Traffic Diversion 260,000 Roadway 3,350,000 Structural 740,000 Landscaping 270,000 Municipal, Electrical, Utilities, Environmental Mitigation 500,000 Sub-Total 5,120,000 Contingency (20%) 1,024,000 Construction Cost 6,144,000 Engineering 500,000 Inflation 350,000 Total 7,000,000
SLIDE 18
Video Presentation
SLIDE 19
Thank You