December 2016 PROFICO AMBIENTE E ORDENAMENTO, LDA. Morada: Rua - - PDF document

december 2016
SMART_READER_LITE
LIVE PREVIEW

December 2016 PROFICO AMBIENTE E ORDENAMENTO, LDA. Morada: Rua - - PDF document

ENVIRONMENT IS OUR PRIORITY December 2016 PROFICO AMBIENTE E ORDENAMENTO, LDA. Morada: Rua Alfredo da Silva 11-B 1300-040 Lisboa E-mail: ambiente@profico.pt Tel.: (+351) 21 361 93 60 Fax: (+351) 21 361 93 69 www.proficoambiente.pt ENVIRONMENT


slide-1
SLIDE 1

PROFICO AMBIENTE E ORDENAMENTO, LDA. Morada: Rua Alfredo da Silva 11-B 1300-040 Lisboa E-mail: ambiente@profico.pt Tel.: (+351) 21 361 93 60 Fax: (+351) 21 361 93 69 www.proficoambiente.pt

December 2016

ENVIRONMENT IS OUR PRIORITY

slide-2
SLIDE 2

2

“ENVIRONMENT IS OUR PRIORITY”

slide-3
SLIDE 3

3

01.

ABOUT US

02.

MISSION

03.

QUALITY POLICY

04.

TEAM

05.

SERVICES

06.

CLIENTS

07.

PROJECTS

slide-4
SLIDE 4

4

ABOUT US

PROFICO AMBIENTE is a consultancy company working in the Environmental Area developing studies and projects in the fields of Environment and Land Use Planning. PROFICO AMBIENTE CARRIES OUT ITS ACTIVITIES IN AN INTEGRATED MANNER:

  • conceives, analyses and technically supports the selection of the most

sustainable solutions for the problems raised, thus guaranteeing a suitable cost-efficiency;

  • monitors the implementation of the chosen solutions, in order to ensure

their correct application, during the stages of construction, operation and deactivation of sites/enterprises;

  • technically supports its Clients in contacts with the Ministry of the

Environment as well as other authorities involved in the licensing and environmental processes;

  • plans and carries out training and awareness activities, both of general and

specific nature, according to the interests of its Clients.

OUR MISSION

PROFICO AMBIENTE´s main mission consists in the full satisfaction of its Clients through the conception and implementation of solutions finely tuned to their interests and designs within an environmental context. To carry out this objective, PROFICO AMBIENTE encourages a close relationship with its Clients during the development of their projects, which enables the final products to be finely tuned to their true needs, whilst simultaneously respecting environmental standards of quality.

slide-5
SLIDE 5

5

QUALITY POLICY

PROFICO AMBIENTE obtained the ISO 9001:2008 Quality Management System (QMS) certification in 2010 by SGS. Establishing and developing a Quality Policy allows PROFICO AMBIENTE to pursue Excellency of its services in studies and projects in the fields of Environment and Land Use Planning. The first aim of the Company is to provide services which meet the clients’ requests in compliance with internal quality requirements, deadlines and contractual price. An essential condition is also legal and regulatory fulfilment. Bearing in mind the strategic importance of Quality for its services and respecting the principles of professional ethics and deontology in its relationships, the Company commits to:

  • Provide services in its business areas to ensure that CUSTOMER NEEDS ARE

SATISFIED in accordance with the technical specifications and regulations in force;

  • Promote INNOVATION AND TECHNICAL QUALITY in its services, by constantly

updating knowledge and through acquisition of technical potential;

  • Recognize SUPPLIERS AS PARTNERS, favouring those that meet quality

standards compatible with its values. For these purposes, PROFICO AMBIENTE guarantees the necessary resources for its

  • peration and continual improvement of its QMS effectiveness in accordance with

the requirements of the aforementioned standard NP EN ISO 9001:2008.

slide-6
SLIDE 6

6

ORGANISATIONAL STRUCTURE

The organisational structure of PROFICO AMBIENTE is the following.

slide-7
SLIDE 7

7

SERVICES

Environmental Studies:

  • Environmental Impact Assessment
  • Strategic Environmental Assessment
  • Environmental Monitoring
  • Waste Management
  • Wastewater Management
  • Spatial Planning
  • Landscape Integration and Environmental Requalification

Environmental Management:

  • Environmental Auditing
  • Environmental Expert Advice
  • Implementation of Environmental Management Tools (Life Cycle

Assessment (LCA), Environmental Performance Evaluation and Indicators, Ecolabel)

  • Environmental Licensing (IPPC) and Activities Licensing (Industrial,

Commercial or Others)

  • Annual Environmental Reports regarding Environmental Licenses
  • Sustainability Reports
  • Social Responsibility Expert Advice
  • Environmental Risk Assessment

Environmental Monitoring of Works:

  • Construction and Demolition Waste Prevention and Management

Plans

  • Environmental Management Systems/Plans of Works
  • Monitoring Plans for Works Contracts
  • Environmental Monitoring of Works
  • Environmental Supervision of Works

Health and Safety

  • Health and Safety Plans
  • Internal Emergency Plans
  • Risk Assessment

Environmental Training and Awareness

slide-8
SLIDE 8

8 CLIENTS

Governo Provincial do Huambo HERBEX PRODUTOS QUÍMICOS,S.A

slide-9
SLIDE 9

9

. URBINDÚSTRIA, S.A WW

slide-10
SLIDE 10

10

PROJECTS

ENVIRONMENTAL STUDIES

ENVIRONMENTAL ASSESSMENT

ENVIRONMENTAL IMPACT STUDIES AND ENVIRONMENTAL EFFECTS STUDIES

  • Environmental Impact Study of the rehabilitation, modernisation and

expansion of the Railway System of Ressano Garcia, Ports of Maputo and Matola, and Station of Goods, in Mozambique (ECM/CFM), ongoing

  • Environmental Impact Study of the reversible Furnas Hydroelectric Power

Plant– S. Miguel – Azores (EDA), ongoing

  • Evaluation of the Architectural, Archaeological and Cultural Heritage on the

Project of the Beira Alta and Beira Baixa Railway Lines Crossing (Profico – Projetos, Fiscalização e Consultadoria, Lda./Infraestruturas de Portugal, SA), 2016

  • Environmental Impact Study of the Project of the Geothermal Wells CL8, CL9

e CL10 for Electricity Production at the Geothermal Power Station in Ribeira Grande - Azores (EDA RENOVÁVEIS), ongoing

  • Environmental Impact Study of the BIOVEGETAL Industrial Facility in

Alhandra (BIOVEGETAL – Combustíveis Biológicos e Vegetais, S.A.), 2015

  • Environment Reports of the Projects of Rehabilitation and Strengthening of

the Bridges of the Rivers Galego and Cardeira and Replacing of the Bridge of the Municipal Road 392, in the district of Beja (Profico Projetos, Fiscalização e Consultoria, Lda. to Estradas de Portugal, SA), 2014

  • Environmental and Heritage Assessment Study of the Tua Mobility Project,

between Tua Railway Station and 200m upstream of the dam (EDP Produção, SA), 2013

  • Environmental Impact Study of the Slaughter CARNES LANDEIRO, S.A.

(CARNES LANDEIRO, SA), 2013

  • Environmental Impact Study of the Cattle Breeding Facility of AGRO

LANDEIRO, Lda. (AGROLANDEIRO, Lda.), 2013

  • Environmental Study to support the modification of the 220 kV Lines

(LVM.CT 1/LRR.VM1, LVG.VM4 e LRR.VM2) layout route near the electrical power Substation of Vermoim (SVM) (REN, SA), 2012

slide-11
SLIDE 11

11

  • Environmental Assessment of the New Solution for the Foz Tua Hydroelectric

Power Plant and Heritage Impact Study of this solution in the Alto Douro Wine Region, in accordance with the "Guidance on Heritage Impact Assessments for Cultural World Heritage Properties" (ICOMOS, 2011) (EDP – Gestão da Produção, SA), 2012

  • Environmental Study to support the modification of the 220 kV Lines

(LVM.CT 2/LVM.PRD 1) layout route near the electrical power Substation of Vermoim (SVM) (REN, SA), 2012

  • Environmental Study to support the Upgrade of the Line of Recarei –

Vermoim 3 (LRR.VM 3) Electrical Voltage from 220 kV to 400 kV (REN, SA), 2012

  • Environmental Impact Study Review of the Expansion of the Port

Infrastructures and Improvement of Shelter Conditions of Port of Madalena (WW – Consultores de Hidráulica e Obras Marítimas, S.A.), 2012

  • Environmental Impact Study of the IP3 - New Bridge over Dão River, km

75+310 (Profico – Projectos, Fiscalização e Consultadoria, Lda./EP - Estradas de Portugal), 2011

  • Environmental Impact Study of an Outlet (Algarve The Style Outlets) in Estói,

Faro, Algarve (NEINVER), 2011

  • Environmental Impact Study of the Municipal Waste Management Facility in
  • S. Miguel Island, Azores (AMISM – Associação de Municípios da Ilha de S.

Miguel), 2011

  • Environmental

Impact Study

  • f

the Allotment VQPRD DOURO RESORT&HOUSING (EDP Valor - Gestão Integrada de Serviços, S.A.), 2011

  • Environmental Impact Study of the Allotment DOURO/CARRAPATELO, (EDP

Valor - Gestão Integrada de Serviços, S.A.), 2011

  • Environmental Impact Study of the Complementary Spillway of the

Salamonde Dam (EDP - Gestão da Produção de Energia, S.A.), 2010

  • Environmental Impact Study of the Expansion and Renovation of the

Terminal of Faro Airport (ANA - Aeroportos de Portugal), 2010

  • Environmental Effects Study of the Overpass Construction Work at km

205,925 and the Agricultural Overpass Construction Work at km 206,580, of the Alentejo Railway Line (REFER), 2010

  • Environmental Effects Study of the Overpass Construction Work at km

65,372, the Agricultural Underpass at km 72,541, of the South Railway Line, Alcácer do Sal (REFER), 2010

  • Environmental Impact Study of the Guardão Wind Farm (ENERGIEKONTOR),

2010

slide-12
SLIDE 12

12

  • Environmental Impact Study of the Project Railway Link of Cascais and Lisbon

Port to Lisbon Railway Ring (REFER, EPE – Rede Ferroviária Nacional), 2009

  • Environmental Impact Study of the Alcântara Grade Separation Project –

Route Variants 2 and 3 (REFER, EPE – Rede Ferroviária Nacional), 2009

  • Environmental Impact Study of the IKEA Retail Park in Loures, Portugal

(IKEA), 2009

  • Environmental Effects Study of the Alto do Marco Wind Park (FINERGE –

Gestão de Projectos Energéticos, S.A.), 2009

  • Environmental Impact Study of the Foz Tua Hydroelectric Power Plant (EDP –

Gestão da Produção de Energia, S.A.), 2009

  • Environmental Expert Advice for the new IKEA store in Loures (IKEA), 2008
  • Estudos setoriais de Flora e Vegetação, Fauna e Habitats, Paisagem e

Património do Estudo de Impacte Ambiental (AMBILIS – Recolha e Tratamento de Resíduos, S.A./SUINIJANARDO – Produção, Exploração e Comercialização de Suínos, Lda.), 2008

  • Flora and Vegetation, Fauna and Habitats, Landscape and Heritage Sectoral

Studies of the Environmental Impact Study (Pig breeding) (AMBILIS – Recolha e Tratamento de Resíduos, S.A./SUINIJANARDO – Produção, Exploração e Comercialização de Suínos, Lda.), 2008

  • Environmental Impact Study of the Pavements and Infrastructure Project of

the Container Terminal/Yard at the João Paulo II Airport, Azores (ANA – Aeroportos de Portugal), 2008

  • Environmental Impact Study of the Design and Construction Works Contract
  • f the Anaerobic Digestion Unit of the AMARSUL Waste Facility, in Seixal

(AMARSUL – Valorização e Tratamento de Resíduos Sólidos, S.A.), 2008

  • Environmental Effects Study of the Facho da Azóia Wind Farm (CENTEOL –

Centrais Eólicas Reunidas, S.A.), 2008

  • Environmental Impact Study of the Platform W and New Taxiways D and E

Expansion of the João Paulo II Airport, in Azores (ANA – Aeroportos de Portugal), 2008

  • Environmental Impact Study of the Infrastructure Project for the ILS, Lane 10

and Platform and Taxiways Expansion of the Faro Airport (ANA – Aeroportos de Portugal), 2008

  • Environmental Impact Study of the Wastewater Treatment Plant of the Lis

Region Pig Breeding Plants, RECILIS (2007)

slide-13
SLIDE 13

13

  • Environmental Impact Study of the Cogeneration Plant of the Porto Refinery

(GALP POWER), 2007

  • Environmental Impact Study of the Pig Breeding Wastewater Treatment

Plant of the Lis Region – Review (SIMLIS - Saneamento Integrado dos Municípios do Lis, S.A./RECILIS - Tratamento e Valorização de Efluentes, S.A.), 2007

  • Environmental Impact Study of the IC36 – Leiria Sul (IC2)/East Leiria (COL)

(Consortium PCT – Projectos e Consultores de Transportes, Lda. and Profico – Projetos, Fiscalização e Consultadoria, Lda. for EP – Estradas de Portugal for E.P.E.), 2007

  • Environmental Impact Study of the GALP POWER Combined Cycle Power

Station in Sines – S. Torpes, GALP POWER (2006)

  • Environmental Effects Stydy of the Guarda II Wind Farm (CENTEOL – Centrais

Eólicas Reunidas, S.A.), 2007

  • Environmental Impact Study of the Environmental and Functional

Restoration of the Eurominas Terminal and Land Accesses Works Contract (APSS – Administração dos Portos de Setúbal e Sesimbra, S.A.), 2006

  • Environmental Impact Study of the Lot 3A2 – section Lisboa - Montemor-o-

Novo Link via the Tagus Third Crossing (Consortium SENER-GLOBALVIA- CÂNCIO MARTINS for RAVE – Rede Ferroviária de Alta Velocidade), 2006

  • Environmental Impact Study of the Pig Breeding Wastewater Treatment

Plant of the Lis Region (RECILIS - Tratamento e Valorização de Efluentes, S.A.), 2006

  • Environmental Impact Study of the GALP POWER Combined Cycle Power

Station in Sines – Vale Marim (GALP POWER), 2006

  • Environmental Impact Study of the GALP POWER Combined Cycle Power

Station in Sines (GALP POWER), 2006

  • Environmental Impact Study of the Pig Breeding Wastewater Treatment

Plant of Milagres (RECILIS - Tratamento e Valorização de Efluentes, S.A.), 2005

  • Scoping Process for Proposal of the Environmental Impact Study of a

Combined Cycle Power Station in Sines (GALP POWER), 2005

  • Environmental Effects Study of the Hazardous Waste Return, Recovery and

Disposal Integrated Facility (CIRVER) in Chamusca (Consortium HIDURBE/ BEFESA), 2004

  • Environmental Effects Study of the Teixo Hydroelectric Power Plant (HDR

Hidroeléctrica, S.A.), 2004

slide-14
SLIDE 14

14

  • Environmental Effects Study of the Malhadouro Hydroelectric Power Plant

(HDR Hidroeléctrica, S.A.), 2004

  • Environmental Impact Study of the Cogeneration Plant of the Sines Refinery

(GALP POWER, SGPS, S.A.), 2004

  • Environmental Impact Study of the HERBEX Industrial Facility in Albarraque

(Chemical Products Facility) (HERBEX – Produtos Químicos, S.A.), 2004

  • Environmental Effects Study of the Fornelo do Monte Wind Park (GENERG),

2004

  • Environmental Effects Study of the Farves/Novais Wind Park (GENERG), 2004
  • Environmental Impact Study of the Waste Treatment System Expansion in

São Miguel Island (AMISM), 2003

  • Environmental Effects Study for the Variant Solution for the Guia Waste

Water Treatment Plant, (CME – Construção e Manutenção Electromecânica S.A.), 2003

  • Environmental Effects Studies of the Canedo and Ermelo Hydroelectric Power

Plants (HIDROCENTRAIS REUNIDAS), 2003

  • Environmental Effects Studies of the Cabeço Alto and Serra do Gomes Wind

Parks (GENERG), 2003

  • Environmental Impact Study of the Zibreiro-Moeda Wind Park (GENERG),

2003

  • Environmental Effects Study of the Santana Theme Park in the Autonomous

Region of Madeira (EDICARTE), 2002

  • Environmental Impact Study of the Loureiro-Monte Novo Irrigation

Intersection and corresponding Irrigation Area (EDIA – Empresa de Desenvolvimento e Infra-estruturas do Alqueva, S.A.), 2003

  • Environmental Effects Studies of the Casinhas, Mougueiras and Moradal

Wind Parks in the area of Pinhal Interior (GENERG – Gestão e Projectos de Energia, S.A.), 2002

  • Environmental Impact Study of the Outeiro Wind Park (Parque Eólico do

Outeiro, Lda), 2002

  • Environmental Impact Study of the 2nd Phase of the Alvão Wind Park (EEA –

Empreendimento Eólico de Alvadia, Lda.), 2002

  • Environmental Impact Study of the Ericeira-Mafra-Malveira Link Preliminary

Study (PLANVIA – Estudos e Projectos, Lda./Municipality of Mafra), 2002

slide-15
SLIDE 15

15

  • Environmental Effects Study of the S. Lourenço da Montaria Wind Park in

Serra de Arga (GENERG – Gestão e Projectos de Energia, S.A.), 2001

  • Environmental Impact Study of the Regularisation Project of Vala da

Salgueirinha - Palmela (INAG – Water National Institute), 2001

  • Environmental Effects Study of the Fornelo do Monte/Souto Bom Wind Park

in Serra do Caramulo (GENERG – Gestão e Projectos de Energia, S.A.), 2001

  • Environmental Effects Study of the Cleaning and Clearing-up of a Section of

River Águeda (INAG), 2001

  • Environmental Effects Study of the Alvão Wind Park (FINERGE), 2001
  • Comparative Study of the Environmental Sensitivity of the 3rd Road Crossing
  • ver River Tagus (LUSOPONTE), 2001
  • Environmental Effects Study of the Gevancas Wind Park (FINERGE – Gestão

de Projectos Energéticos, S.A.), 2001

  • Environmental Impact Study of the Outeiro dos Fiéis Wind Park (FINERGE –

Gestão de Projectos Energéticos, S.A.), 2001

  • Environmental Impact Study of the Cogeneration Plant in RENOESTE, Carriço

(GALP POWER, SGPS, S.A.), 2000

ENVIRONMENTAL COMPLIANCE OF THE FINAL PROJECT WITH THE EIS (ENVIRONMENTAL IMPACT STATEMENT) REPORTS

  • Environmental Compliance Report (RECAPE) of the Project of the Geothermal

Wells PV12, PV13 and PV14, S. Miguel, Azores (EDA RENOVÁVEIS), ongoing

  • Environmental Compliance Report (RECAPE) of the Project of the Waste

Treatment Facility of S. Miguel Island – Landfill’s Cell I and Expansion/Upgrading of the Leachate Treatment Plant, Azores (MUSAMI - Operações Municipais do Ambiente, E. I. M., S.A.), 2016

  • Environmental Compliance Report (RECAPE) of the Foz Tua Hydroelectric

Power Plant (EDP Produção, SA), 2010

  • Environmental Compliance Report (RECAPE) of the Expansion and

Renovation of the Terminal of Faro Airport (ANA - Aeroportos de Portugal), 2010

  • Environmental Compliance Report (RECAPE) of the Infrastructure Project for

the ILS, Lane 10 of the Faro Airport (ANA – Aeroportos de Portugal), 2010

  • Environmental Compliance Report (RECAPE) of the Cogeneration Plant at the

Porto Refinery (PORTCOGERAÇÃO, S.A./GALP POWER, SGPS, S.A.), 2009

slide-16
SLIDE 16

16

  • Environmental Compliance Report (RECAPE) of the Wastewater Treatment

Plant of the Lis Region Pig Breeding Plants, (RECILIS), 2009

  • Environmental Compliance Report (RECAPE) of the Cogeneration Plant of the

Sines Refinery (SINECOGERAÇÃO - Cogeração da Refinaria de Sines, S.A./ GALP POWER, SGPS, S.A), 2006

  • Environmental Compliance Report (RECAPE) of the Ribabelide Wind Farm

(Empreendimentos Eólicos de Ribabelide), 2006

  • Environmental Compliance Report (RECAPE) of the Lagoa of D. João and

Feirão Wind Farm (Empreendimentos Eólicos de Ribabelide), 2006

  • Environmental

Compliance Report (RECAPE)

  • f

the Ericeira/Mafra/Malveira/A8 Highway - Section Malveira/A8 (PLANVIA – Estudos e Projectos, Lda./Municipality of Mafra), 2005

  • Environmental

Compliance Report (RECAPE)

  • f

the Ericeira/Mafra/Malveira/A8 Highway - Section Ericeira/Malveira (PLANVIA – Estudos e Projectos, Lda./Municipality of Mafra), 2005

  • Environmental Compliance Report (RECAPE) of the Road Mafra/Malveira

(PLANVIA – Estudos e Projectos, Lda./Municipality of Mafra), 2004

STRATEGIG ENVIRONMENTAL ASSESSMENT

  • Master Plan and Detailed Design for Ecological Protection and Improvement
  • f Tasitolu, in East Timor (Consortium GUSTAVO DA CUNHA/PROFICO

PROJETOS/PROFICO AMBIENTE for the Secretary State of Environment/MCIA

  • Ministry of Commerce, Industry and Environment – RDTL), ongoing
  • Strategic Environmental Assessment of the Detailed Plan of Bacelos (MB477

Arquitectura e Território, Lda.), ongoing

  • Strategic Environmental Plan of the Province of Huambo, Angola (PGE -

Projectos e Gestão de Empreendimentos, Lda./Provincial Government of the Huambo), 2013

  • Environmental Baseline Studies to support the Municipal Urban Planning of

Bailundo, Province of Huambo, Angola (PGE - Projectos e Gestão de Empreendimentos, Lda./Provincial Government of the Huambo), 2012

  • Environmental Baseline Studies to support the Municipal Urban Planning of

Londuimbali, Province of Huambo, Angola (PGE - Projectos e Gestão de Empreendimentos, Lda./Huambo Province Government), 2012

  • Environmental Baseline Studies to support the Municipal Urban Planning of

Mungo, Province of Huambo, Angola. (PGE - Projectos e Gestão de Empreendimentos, Lda./Huambo Province Government), 2012

slide-17
SLIDE 17

17

  • Environmental Baseline Studies to support the Municipal Urban Planning of

Catchiungo , Province of Huambo, Angola (PGE - Projectos e Gestão de Empreendimentos, Lda./Huambo Province Government), 2012

  • Strategic Environmental Assessment of the Detailed Plan of Quinta da

Ferraria, Rio Maior (Poligreen – Gestão e Investimentos, S.A./Municipality of Rio Maior), 2011

OTHER ENVIRONMENTAL/SOCIAL STUDIES AND ENVIRONMENTAL EXPERT ADVICE

  • Environmental Expert Advice for developing the Project of the new Rail Link

between Évora and Elvas/Caia (border with Spain) – C – Bridges and Special Structures between North Évora and the Leste Line (Profico – Projetos, Fiscalização e Consultadoria, Lda./Infraestruturas de Portugal, SA), ongoing

  • Monitoring Balance Reports (some environmental factors) and Coordination/

Edition/Assembly of the Environmental Monitoring of the Baixo Sabor Hydroelectric Power Plant (AHBS) Final Report (EDP - Gestão da Produção de Energia, S.A.), ongoing

  • Environmental Study of the Mobility Project - River Component for the Foz

Tua Hydroelectric Power Plant (AHFT) (EDP, Gestão da Produção de Energia, S.A.), ongoing

  • Environmental Restoration and Landscape Integration Project and

Environmental Expert Advice on Implementation of the Measures included in the Environmental Impact Statement (Pig Breeding Facility) (AGROLANDEIRO, Lda.), 2016

  • Environmental and Sustainability Study for the Documentation and

Information Centre pf APL in Alcântara Maritime Station (Profico – Projetos, Fiscalização e Consultoria for Atelier RUA/APL - Administração do Porto de Lisboa, S.A.), 2015

  • Baixo Sabor Hydroelectric Power Plant (AHBS) – Process of Information and

Use of National Ecological Reserve and National Agricultural Areas regarding Compensatory Measures MC2.4 and MC10.5 – Ponds for Amphibian and Black Stork (EDP – Gestão da Produção de Energia, S.A.), 2015

  • Baixo Sabor Hydroelectric Power Plant (AHBS) – Compensatory Measures

Simplified Projects Review (EDP – Gestão da Produção de Energia, S.A.), 2015

  • Baixo Sabor Hydroelectric Power Plant (AHBS) – Technical Note for reply to

the APA’s reasoned Opinion on the Rural Tracks Restoration Unforeseen in the RECAPE – Upstream Level (EDP – Gestão da Produção de Energia, S.A.), 2015

  • Assistance on contacts and facilitating on-site assessments for a pesticide

field leaching project in Portugal (ARCADIS UK/EC HARRIS), 2015

slide-18
SLIDE 18

18

  • Socio-territorial Study regarding the Moatize Industrial Complex and its

Expansion - Detail Design of the Moatize River, National Road N7 and Sena Railway Line Realignment and Requalification, Mozambique (ECM - Engenheiros Consultores de Moçambique/VALE, S.A.), 2014/2015

  • Compensatory Measures Simplified Projects of the Baixo Sabor Hydroelectric

Power Plant (AHBS) (EDP – Gestão da Produção de Energia, S.A.), 2014

  • Operational Datasheets Update of the Baixo Sabor Hydroelectric Power Plant

(AHBS) (EDP – Gestão da Produção de Energia, S.A.), 2014

  • Environmental Component of the Tender for the Concession and Operation

Contract of the Wind Farm of Tofo Beach in Inhambane, Mozambique (ECM for Tecneira SA), 2013

  • Technical Report concerning the NOx Emissions for fresh-air operation of the

Boilers of the Cogeneration Plant Boilers of the Porto Refinery, (PORTCOGERAÇÃO, S.A./GALP POWER, SGPS, S.A.), 2013

  • Dissemination Plan of the Salamonde Hydroelectric Power Plant Power

Boosting Project (Salamonde II) (EDP – Gestão da Produção de Energia, S.A), 2013

  • Lot 1: Study on the applicability of existing chemical industry safety

provisions to enhancing security of chemical facilities. Country Report – PORTUGAL (TAUW IBERIA, S.A./COWI A/S Denmark/ European Commission Directorate-General Home Affairs), 2012

  • Environmental Diagnosis and Action Plan to support water level lowering in

the Caniçada Dam for Power Boost of the Salamonde Dam – Salamonde II ((EDP - Gestão da Produção de Energia, S.A.), 2011l

  • Hydrogeological Assessment of the L04 – Vale de Stº António Allotment

Project (EPUL – Empresa Pública de Urbanização de Lisboa), 2011

  • CCGT Sines: Noise Update Report (GALP POWER), 2010
  • Support Strategic Planning to the Vila Real de Santo António Municipality

Strategic Plan and Action Plan regarding CIUMED Project – Polycentrism through the Medium-sized Cities Network (6 Workshops included) (in partnership with WTeamUp for Vila Real de Santo António Municipality), 2004/2005

slide-19
SLIDE 19

19

WASTE MANAGEMENT (STUDIES, PLANS AND PROJECTS)

  • Hospital Waste Project for the Venteira Health Centre (Profico – Projetos,

Fiscalização e Consultadoria, Lda./Municipality of Amadora), 2016

  • Hospital Waste Project for the Águas Livres Health Unit (Profico – Projetos,

Fiscalização e Consultadoria, Lda./Municipality of Amadora), 2016

  • Environmental Impacts Assessment Study of the Santo Tirso Landfill and an

Estimate of the Cost associated with the Central North Domestic Waste System (Municipality of Santo Tirso), 2015

  • Study for evaluation of the operation conditions of the Santo Tirso Landfill by

RESINORTE (Municipality of Santo Tirso), 2014

  • Project of the Nacala Waste Centre (Project of the Domestic Waste Landfill)

(ECM – Engenheiros Consultores de Moçambique/VALE), 2013

  • Technical Support for Review of the Industrial Waste Management Strategic

Plan (PESGRI) 2014-2020 (APA - Environmental Portuguese Agency), 2011- 2013

  • Market Study for a Cost-Benefit analysis for Sustainability Assessment of the

Emerging Waste Flow – Nappies (APA - Environmental Portuguese Agency), 2009

  • Municipal Solid Waste Action Plans for AMCAL, GESAMB and RESIALENTEJO

in Alentejo Region (GESAMB – Gestão Ambiental e de Resíduos, E.I.M.), 2008

  • Participation in the Review of the Municipal Solid Waste Strategic Plan

(PERSU), PERSU II (INR – Waste National Institute), 2007

  • Physical characterisation of the waste packaging – Non-domestic stream (SPV
  • Sociedade Ponto Verde), 2006
  • Physical characterisation of the waste packaging – Domestic Stream (SPV -

Sociedade Ponto Verde), 2006

  • Annual Environmental Report of the West Waste Landfill for the year 2005

(RESIOESTE – Valorização e Tratamento de Resíduos Sólidos, S.A.), 2006

  • Domestic Waste Component of the Unhos Urbanisation Plan (Profico –

Projetos, Fiscalização e Consultadoria, Lda.), 2005

  • Hazardous Packaging Waste (domestic stream) Management Study (SPV -

Sociedade Ponto Verde), 2005

  • Hazardous Packaging Waste (non-domestic stream) Management Plan (SPV -

Sociedade Ponto Verde), 2005

slide-20
SLIDE 20

20

  • Monitoring of the Implementation of Plans and Strategies - Industrial Waste

Management Strategic Plan (PESGRI) (INR - Waste National Institute), 2005

  • Annual Environmental Report and European Pollutant Emission Register

(EPER) of the West Waste Landfill for the year 2004 (RESIOESTE – Valorização e Tratamento de Resíduos Sólidos, S.A.), 2005

  • Monitoring of the Implementation of Plans and Strategies - Domestic Waste

Strategic Plan (PERSU) (INR - Waste National Institute), 2005

  • Preliminary Study of the Domestic Waste Regulation AMISM – Associação de

Municípios da Ilha de S. Miguel), 2004

  • Annual Environmental Report of the West Waste Landfill for the year 2003

(RESIOESTE – Valorização e Tratamento de Resíduos Sólidos, S.A.), 2004

  • Monitoring of the Implementation of Plans and Strategies - Hospital Waste

Management Plan (PERH) (INR - Waste National Institute), 2004

  • Identification of Waste Production Indexes in Sonae Imobiliária´s Shopping

Centres and procedures for its quantification (Sonae Imobiliária – SGPS, S.A.), 2003

  • Cost Assessment and Legal Framework of the Solid Waste Management in

Sonae Imobiliária´s Shopping Centres (Sonae Imobiliária – SGPS, S.A.), 2002

  • Implementation of a Separate Collection System in the Waste System of

VALNOR (VALNOR – Valorização e Tratamento de Resíduos Sólidos do Norte Alentejano, S. A.), 2001

CHARACTERIZATION STUDIES OF THE DOWNSTREAM VALLEYS AND SURROUNDINGS OF DAM RESERVOIRS

  • Characterisation Study of the Downstream Valley and Surroundings of the

Miranda Dam Reservoir within its Internal Emergency Plan (EDP - Gestão da Produção de Energia, S.A.), ongoing

  • Characterisation Study of the Downstream Valley and Surroundings of the

Bemposta Dam Reservoir within its Internal Emergency Plan (EDP - Gestão da Produção de Energia, S.A.), 2016

  • Characterisation Study of the Downstream Valley and Surroundings of the

Picote Dam Reservoir within its Internal Emergency Plan (EDP - Gestão da Produção de Energia, S.A.), 2016

  • Characterisation Study of the Downstream Valley and Surroundings of the

Pocinho Dam Reservoir within its Internal Emergency Plan (EDP - Gestão da Produção de Energia, S.A.), 2014

slide-21
SLIDE 21

21

  • Characterisation Study of the Downstream Valley and Surroundings of the

Valeira Dam Reservoir within its Internal Emergency Plan (EDP - Gestão da Produção de Energia, S.A.), 2013

  • Characterisation Study of the Downstream Valley and Surroundings of the

Régua Dam Reservoir within its Internal Emergency Plan (EDP - Gestão da Produção de Energia, S.A.), 2013

  • Characterisation Study of the Downstream Valley and Surroundings of the

Baixo Sabor Dam Reservoir within its Internal Emergency Plan (EDP - Gestão da Produção de Energia, S.A., 2012

  • Characterisation Study of the Downstream Valley and Surroundings of the

Carrapatelo Dam Reservoir within its Internal Emergency Plan (EDP - Gestão da Produção de Energia, S.A.), 2011

  • Characterisation Studies of the Downstream Valley and Surroundings of the

Fridão Dam Reservoir within its Internal Emergency Plan (EDP - Gestão da Produção de Energia, S.A.), 2011

  • Characterisation Studies of the Downstream Valley and Surroundings of the

Torrão Dam Reservoir within its Internal Emergency Plan (EDP - Gestão da Produção de Energia, S.A.), 2011

  • Characterisation Study of the Downstream Valley and Surroundings of the

Crestuma-Lever Dam Reservoir within its Internal Emergency Plan (EDP - Gestão da Produção de Energia, S.A.), 2010

  • Characterisation Study of the Downstream Valley and Surroundings of the

Foz Tua Dam Reservoir within its Internal Emergency Plan (EDP - Gestão da Produção de Energia, S.A.), 2010

ENVIRONMENTAL MONITORING AND MINIMISATION/COMPENSATION MEASURES

  • Monitoring for Assessment of the Effectiveness of the Ecological Flows of the

Alto Rabagão and Fronhas Dams, 2015 (year 3) (EDP LABELEC), ongoing

  • Monitoring of the Rio Cávado River Section downstream of the Paradela Dam

for Ecological Qualitative Assessment, 2015 (year 2) (EDP LABELEC), ongoing

  • Monitoring for Assessment of the Effectiveness of the Ecological Flows of the

Vilarinho das Furnas Dam, 2015 (year 1) (EDP LABELEC), ongoing

  • Characterisation Study of the Médio and Alto Sabor Traditional Weirs of the

Baixo Sabor Hydroelectric Power Plant (EDP – Gestão da Produção de Energia, S.A), ongoing

slide-22
SLIDE 22

22

  • Bat Monitoring and Acacia Control and Habitats Restoration Integrated Plant

for the Power Boost of the Salamonde Dam Contract Works – Salamonde II (EDP – Gestão da Produção de Energia, S.A), ongoing

  • Noise mapping for the Project of the Beira Alta and Beira Baixa Railway Lines

Crossing (Profico – Projetos, Fiscalização e Consultadoria, Lda./ Infraestruturas de Portugal, SA), 2016

  • Baixo Sabor Hydroelectric Power Plant (AHBS) – Riparian Galleries

Improvement and Restoration Project regarding the Compensatory Measures MC2.3, MC3.1 and MC4.2 (EDP – Gestão da Produção de Energia, S.A), 2015

  • Baixo Sabor Hydroelectric Power Plant (AHBS) – Further Studies regarding

Compensatory Measure MC9 –Rupicolous Avifauna in Northeast Trás-os- Montes Protection and Improvement Program to (EDP – Gestão da Produção de Energia, S.A), 2015

  • Baixo Sabor Hydroelectric Power Plant – Further Studies regarding the

Compensatory Measure MC10 – Reptiles, Amphibians and Invertebrates in Sabor Valley Protection and Improvement Program (EDP – Gestão da Produção de Energia, S.A), 2015

  • Noise Monitoring and Acacia Control and Habitats Restoration Integrated

Plant for the Power Boost of the Salamonde Dam Contract Works – Salamonde II (EDP – Gestão da Produção de Energia, S.A), 2015

  • Noise Monitoring at the Pico Vermelho Geothermal Power Station (EDA

RENOVÁVEIS), 2015

  • Baixo Sabor Hydroelectric Power Plant – Compensatory Measure MC2.4

Ponds for Black Stork (EDP – Gestão da Produção de Energia, S.A.), 2015

  • Monitoring for Assessment of the Effectiveness of the Ecological Flows of the

Alto Rabagão and Fronhas Dams, 2014 (year 2) (EDP LABELEC), 2015

  • Monitoring of the Rio Cávado River Section downstream of the Paradela Dam

for Ecological Qualitative Assessment, 2014 (year 1) (EDP LABELEC), 2015

  • Ponds for Amphibian and Black Stork Project regarding the Compensatory

Measure MC10 of the Baixo Sabor Hydroelectric Power Plant (AHBS) (EDP – Gestão da Produção de Energia, S.A.), 2015

  • Riparian Galleries Improvement and Restoration Project additional to the

Compensatory Measure MC10 works of the Baixo Sabor Hydroelectric Power Plant (EDP – Gestão da Produção de Energia, S.A), 2013/2014

  • Monitoring for Assessment of the Effectiveness of the Ecological Flows of the

Alto Rabagão and Fronhas Dams, 2013 (year 1) (EDP LABELEC), 2014

slide-23
SLIDE 23

23

  • Baixo Sabor Hydroelectric Power Plant – Compensatory Measures MC3.1

Riparian Galleries Restoration in Médio and Alto Sabor and river Maçãs and MC4.2 Riparian Galleries Restoration in the dams’ immediate environment (EDP – Gestão da Produção de Energia, S.A), 2013

  • Baixo Sabor Hydroelectric Power Plant – Compensatory Measure MC10 -

MC10 – Reptiles, Amphibians and Invertebrates in Sabor Valley Protection and Improvement Program (EDP – Gestão da Produção de Energia, S.A), 2012

  • Baixo Sabor Hydroelectric Power Plant (AHBS) – Compensatory Measure MC9

–Rupicolous Avifauna in Northeast Trás-os-Montes Protection and Improvement Program to (EDP – Gestão da Produção de Energia, S.A), 2012

  • Environmental Monitoring of the Ribabelide Wind Farm (EED -

Empreendimentos Eólicos de Ribabelide, S.A.), 2011

  • Environmental Monitoring of the Lagoa of D. João and Feirão Wind Farm

(EED - Empreendimentos Eólicos de Ribabelide, S.A.), 2011

  • Environmental Monitoring of the Guarda II Wind Farm (Birds and Bats)

(CENTEOL – Centrais Eólicas Reunidas, S.A.) 2010

  • Environmental Monitoring of the Outeiro Wind Farm (Parque Eólico do

Outeiro/FINERGE – Gestão de Projectos Energéticos, S.A.), 2008

  • Environmental Monitoring of 2nd Phase of the Alvão Wind Farm (EEA –

Empreendimento Eólico de Alvadia, Lda.), 2007

  • Environmental Monitoring of 1st Phase of the Wind Farm of Alvão (EEA –

Empreendimento Eólico de Alvadia, Lda.), 2002

ENVIRONMENTAL ASSESSMENT REPORTS

Environmental Assessment Reports of Bridge and Railway Line Projects

SOIL OCCUPATION AND WATER AREAS OF PUBLIC TRUST APPLICATIONS

Soil occupation and Water areas of Public Trust Applications for Bridge, Railway Lines and Dam Projects

slide-24
SLIDE 24

24

ENVIRONMENTAL MANAGEMENT

ENVIRONMENTAL/SAFETY AUDITS (EVALUATION OF LEGAL COMPLIANCE, ISO

14001 AND ENVIRONMENTAL DUE DILIGENCE (PHASE I))

  • Technical Inspection to the Baixo Tâmega Non-hazardous Waste Landfill

(RESINORTE – Valorização e Tratamento de Resíduos Sólidos, S.A.), 2016

  • Audit to the Electric and Electronic Waste Registration Entity ANREEE –

Associação Nacional para o Registo de Equipamentos Elétricos e Eletrónicos (APA – Environmental Portuguese Agency), 2016

  • Audit to the Batteries and End-of-Life Vehicles Management and Registration

Entities - VALORCAR, ECOPILHAS, ANREEE, GVB, Amb3E and ERP Portugal (APA – Environmental Portuguese Agency), 2016

  • Environmental Due Diligence (EDD) Audit to a Paint Facility (COWI A/S

Denmark), 2012

  • Phase I Environmental Site Assessment to an Office Building of a Technology

company, ARCADIS Consult GmbH (Deutschland) (Confidential), 2012

  • Phase I Environmental Site Assessment and Limited Environmental

Compliance Review to a Personal Protective Equipment Facility, ARCADIS UK, 2012

  • Phase I Environmental Site Assessment (ESA) to a Car Dealership in Lisbon

(ARCADIS UK), 2012

  • H&S Audit (Legal Compliance) to the BP – British Petroleum Facilities in

Portugal (ARCADIS GMI), 2011

  • H&S Audit (Legal Compliance) to the BP – British Petroleum GPL Facilities in

Portugal (ARCADIS GMI), 2010

  • Environmental and H&S Legal Compliance Audit to the TRW Facility in Ponte

de Lima (ARCADIS GMI), 2009

  • Phase I Environmental Site Assessment to a Car Plant in Lisbon surroundings

(ARCADIS GmbH Deutschland), 2006

  • Environmental and H&S Legal Compliance Audit to Delphi – Automotive

Systems Seixal Facility, in Portugal (ARCADIS GMI), 2006

  • Phase I Environmental Site Assessment (update) to two Chemical Products

Warehouses (Lisboa and Porto) (Confidential) (ARCADIS NL), 2005

  • Audit to the Waste Management System for Mineral Waters Packaging –

ÁGUA DO MARÃO, Lda. (INR – Waste National Institute), 2005

slide-25
SLIDE 25

25

  • Audit to the Waste Management System for Medical Waste– VALORMED,

Sociedade Gestora de Resíduos de Embalagens e Medicamentos, Lda. (INR – Waste National Institute), 2005

  • Audit to the Waste Management System for Waste Tyres – VALORPNEU,

Sociedade de Gestão de Pneus, Lda. (INR – Waste National Institute), 2005

  • Audit to the Waste Management System for Waste Batteries – ECOPILHAS,

Sociedade Gestora de Resíduos de Pilhas e Acumuladores, Lda. (INR – Waste National Institute), 2005

  • Audit to the Waste Management System for Waste Packaging – Sociedade

Ponto Verde, S.A. (INR – Waste National Institute), 2005

  • Due Diligence Environmental Audit to a Baking Facility at Cabanas – Palmela

(Confidential) (ARCADIS NL), 2004

  • Phase I Environmental Site Assessment to a Car Dealership (Confidential)

(ARCADIS GMI), 2004

  • Phase I Environmental Site Assessment to a Pharmaceutical Facility

(Confidential) (ARCADIS GMI), 2004

  • Audit of the Environmental Management System of General Cable Celcat

(General Cable Celcat – Energia e Telecomunicações, S.A.), 2004

  • Environmental Liabilities Audit to RESITEJO and RIBTEJO Waste Management

Systems (FOMENTINVEST – SGPS, S.A.), 2003

  • ISO 14001 and Legal Compliance Environmental Audit of the General Motors

Audit Services to Opel Portugal (ARCADIS GMI), 2003

  • Environmental Audit to MadeiraShopping (Sonae Imobiliária), 2003
  • Environmental Audit to AlgarveShopping (Sonae Imobiliária), 2003
  • Environmental Audit to ArrábidaShopping (Sonae Imobiliária), 2003
  • Phase I Environmental Site Assessment (ESA) Audits to Commercial and

Service Enterprises (Confidential), 2003

ENVIRONMENTAL MANAGEMENT TOOLS

(LCA, ENVIRONMENTAL PERFORMANCE EVALUATION, ECOLABEL)

  • Environmental Cycle Assessment of the Domestic Waste Management

System of AMISM (AMISM), 2012

  • Environmental Performance Plan for the West Waste Treatment Facility

2009-2013 (RESIOESTE), 2009

slide-26
SLIDE 26

26

  • Reliability Assessment of Five Sonae Sierra’s Shopping Centres - Vasco da

Gama Shopping, Cascais Shopping, Maia Shopping, Loures Shopping and Rio Sul Shopping - Environmental Data Reports (SONAE SIERRA), 2005

  • Environmental Support on the Improvement of the General Cable Celcat’s

Environmental Management System (General Cable Celcat – Energia e Telecomunicações, S.A.), 2004

  • Environmental Performance Plan of the Évora Waste Landfill (AMDE -

Associação de Municípios do Distrito de Évora), 2003

  • Environmental Performance Plan of the West Waste Landfill (RESIOESTE –

Valorização e Tratamento de Resíduos Sólidos, S.A.), 2003.

  • Environmental Management Plan of the Port of the Viana do Castelo, Part 1 –

Environmental Database (IPTM – Instituto Portuário e dos Transportes Marítimos – Delegação dos Portos do Norte), 2003

ENVIRONMENTAL RISKS AND DECONTAMINATION

  • Risk Analysis within the Environmental Impact Study of the BIOVEGETAL

Industrial Facility in Alhandra for the Environmental Licensing Application (BIOVEGETAL - Combustíveis Biológicos e Vegetais, S.A.), 2015

  • Technical Specifications of the Cleaning and Decontamination Works of the

Technical Gallery and Foundations Area of the Canteen Building of Tabaqueira (Tobacco Industrial Company, S.A.) (GESBAU – Engenharia de Gestão, S.A./TABAQUEIRA), 2012

  • Environmental Expert Advice on Soil Contamination Assessment in FERRO

PORTUGAL Industrial Site in Castanheira do Ribatejo (FERRO - Indústrias Químicas de Portugal, Lda.), 2011

  • Deactivation Plan of the FERRO PORTUGAL Facility in Castanheira do Ribatejo

(FERRO - Indústrias Químicas de Portugal, Lda.), 2011

  • Risk Assessment Study of the Cogeneration Plant of the Porto Refinery

(PORTCOGERAÇÃO, S.A./GALP POWER, SGPS, S.A.), 2010

  • Technical Report on Soils and Groundwater Contamination (GALP POWER,

S.A.), 2009

  • Technical Note and Technical Report on Soil Contamination of the Peer

Review Process between Urbindústria and Siderurgia Nacional – Empresa de Produtos Longos, S.A. on Maia lots (Iron and Steel Industry) (Urbindústria, S.A.), 2007

slide-27
SLIDE 27

27

  • Environmental Risk Management Plan of the Évora Waste Sanitary Landfill,

AMDE - Associação de Municípios do Distrito de Évora), 2003

  • Evaluation of the Soil Decontamination Solution for a Santa Iria de Azóia

Facility lots (Confidential), 2002

LICENSING

ENVIRONMENTAL LICENSING (IPPC)

  • Environmental Licensing Application (IPPC) of the Domestic Waste Landfill of

the Waste Treatment Facility of S. Miguel Island (MUSAMI – Operações Municipais do Ambiente EIM, S.A.), 2016

  • Identification and Assessment of the Best Available Techniques (BAT) and

Associated Emission Values included in the applicable BREF within the Environmental Licensing Application of the BIOVEGETAL Industrial Facility (BIOVEGETAL - Combustíveis Biológicos e Vegetais, S.A.), 2014

  • Determination of the Need of Producing a Baseline Report to be included in

the Environmental Licensing Application of the BIOVEGETAL Industrial Facility (BIOVEGETAL - Combustíveis Biológicos e Vegetais, S.A.), 2014

  • Environmental Licensing Update Application (IPPC) of the Porto Refinery

(PORTCOGERAÇÃO, S.A./GALP POWER, SGPS, S.A.) 2010

  • Environmental Licensing Renovation Application (IPPC) of the Carriço

Cogeneration Plant (Carriço Cogeração – Sociedade de Geração de Electricidade e Calor, S.A./GALP POWER, S.A.), 2010

  • Environmental Licensing Renovation Application (IPPC) of the West Waste

Treatment Facility (RESIOESTE), 2008

  • Environmental Licensing Application (IPPC) of the Combined Cycle Power

Plant in Sines – S. Torpes (GALP POWER), 2007

  • Environmental Licensing Application (IPPC) of the Cogeneration Plant of the

Sines Refinery (SINECOGERAÇÃO - Cogeração da Refinaria de Sines, S.A. /GALP POWER, SGPS, S.A.), 2006

  • Environmental Licensing Application (IPPC) of the Carriço Cogeneration Plant

(Carriço Cogeração – Sociedade de Geração de Electricidade e Calor, S.A.), 2002

slide-28
SLIDE 28

28

ACTIVITIES LICENSING (INDUSTRIAL AND COMMERCIAL)

  • Definition of the Environmental Requirements of the Lisbon Medical Park

Project, in Oeiras (Sheehan Medical Limited/INVESCON – Consultoria e Gestão de Empreendimentos, Lda.), 2008

  • Industrial Licensing Update Application of the CYC Facility (fuels and coal

treatment) (CYC – Combustíveis e Carvões, Lda.), 2006

  • Commercial Licensing Application of the IKEA Shopping, Matosinhos (Profico

– Projectos, Fiscalização e Consultadoria, Lda./IKEA), 2006

  • Wastewater and Waste Qualitative and Quantitative Characterization and

Final Destination Identification for a Shopping Centre in Sintra (NEXITY PORTUGAL – Desenvolvimento Imobiliário, Lda.), 2004

  • Industrial Licensing Application of the CYC Facility (fuels and coal treatment)

(CYC – Combustíveis e Carvões, Lda.), 2001

ENVIRONMENTAL MONITORING/SUPERVISION OF WORKS

ENVIRONMENTAL MONITORING/SUPERVISION OF CONTRACT WORKS

  • Coordination and Integration of the Environmental Monitoring of the Foz Tua

Hydroelectric Hydroelectric Power Plant (AHFT) Contract Works (EDP Produção), ongoing

  • Environmental Supervision Support of the Domestic Waste Landfill New Cell

in S. Miguel Island (Engenheiro Tavares Vieira, Lda.), 2012

  • Environmental Supervision of the Docapesca Buildings Demolition Works, in

Pedrouços – VOR (APL – Administração do Porto de Lisboa), 2011

  • Archaeological Monitoring of the Excavations within the Cogeneration Plant
  • f the Porto Refinery Contract Works (PORTCOGERAÇÃO), 2010
  • Environmental Monitoring of the Ribabelide Wind Farm and the 60 kV Line

between the Ribabelide Switching Station and the Valdigem Substation Contract Works (Empreendimentos Eólicos de Ribabelide, S.A.), 2009

  • Environmental Monitoring of the Lagoa of D. João and Feirão Wind Farm

Contract Works (Empreendimentos Eólicos de Ribabelide, S.A.), 2009

  • Environmental and Safety Expert Advice to the Profico – Projetos,

Fiscalização e Consultadoria, Lda. Supervision of Works on the Contract Works Selection of Proposals (Profico – Projetos, Fiscalização e Consultadoria, Lda/Parque Escolar, EPE), 2008

slide-29
SLIDE 29

29

  • Environmental Monitoring of the 60 kV Line between the Ribabelide Wind

Farm Switching Station and the Valdigem Substation Contract Works (Empreendimentos Eólicos de Ribabelide, S.A.), 2008

  • Environmental Monitoring of the Tie Line between the Lagoa of D. João and

Feirão Wind Farm Substation and the Ribabelide Switching Station Contract Works (Empreendimentos Eólicos do Douro, S.A.), 2008

  • Environmental Monitoring of the Wastewaster Treatment of the

Saneamento of Costa do Estoril – SANEST – Guia Refurbishment Contract Works (OPWAY), 2008

  • Environmental Monitoring of the Guarda Wind Farm Expansion Contract

Works (CENTEOL - Centrais Eólicas Reunidas, S.A.), 2008

  • Environmental Monitoring of the SNESGES Deactivated Iron and Steel Plant

Dismantlement and Demolition Contract Works (SNESGES – Administração e Gestão de Imóveis e Prestação de Serviços, S.A.), 2007

  • Environmental Monitoring of the Senhora do Socorro I Wind Farm Contract

Works (FINERGE – Gestão de Projectos Energéticos, S.A.), 2006

  • Environmental Monitoring of the 151 existing Plots in the POLIS Programme

Intervention Area in Cacém Demolition Contract Works (AMBISIDER – Recuperações Ambientais, S.A.), 2006

  • Environmental Monitoring of the Portal da Freita Wind Farm 2nd Phase

Contract Works (FINERGE – Gestão de Projectos Energéticos, S.A.), 2005

  • Environmental Monitoring of the Outeiro Wind Farm Contract Works (Parque

Eólico do Outeiro, Lda), 2005

  • Environmental Monitoring of Inertisation Works of a Waste Oil Tank in a

former Automobile Garage (ARCADIS GMI), 2005

  • Environmental Monitoring of the sewage network route and Close Circuit

Television Inspection (CCTV) and of underground tanks emptying, cleaning and integrity testing in a former Automobile Garage Works (ARCADIS GMI), 2005

  • Integrated Control of the Quality System of the José Afonso Square

Refurbishing Contract Works, in Setúbal (Profico – Projetos, Fiscalização e Consultadoria, Lda.), 2005

  • Environmental Monitoring of the Second Phase of the Alvão Wind Farm

Contract Works (EEA - Empreendimento Eólico de Alvadia, Lda.), 2004

  • Environmental Monitoring of the Luz Stadium Demolition Contract Works

(AMBISIDER), 2003

slide-30
SLIDE 30

30

  • Environmental Monitoring of the Meia Serra Domestic Waste Treatment

Facility Contract Works - Madeira (ACE ETRSU), 2001

ENVIRONMENTAL MANAGEMENT PLANS

  • Environmental Management Plan of the Moatize River, National Road N7 and

Sena Railway Line Realignment and Requalification, Mozambique (ECM – Engenheiros Consultores de Moçambique/ VALE, S.A.), 2016

  • Environmental Management Plan Review of the Moatize Industrial Plant and

its Expansion, Mozambique (ECM – Engenheiros Consultores de Moçambique/ VALE, S.A.), 2015

  • Environmental Management Plan of the 55th Section Shell Contract Works

(Partial), Odivelas Terminal of the Yellow Line of the Lisbon Underground (SOMAGUE and TECNASOL), 2004

  • Environmental Management Plan of the José de Alvalade Stadium

Demolition Contract Works (AMBISIDER – Recuperações Ambientais, S.A.), 2004

  • Environmental Management Plan of the Aldeia da Luz village Dismantling

Contract Works (AMBISIDER – Recuperações Ambientais, S.A.), 2003

  • Environmental Management Plan of half of the Luz Stadium Demolition

Contract Works (AMBISIDER – Recuperações Ambientais, S.A.), 2003

CONSTRUCTION AND DEMOLITION WASTE PREVENTION AND MANAGEMENT PLANS

Construction and Demolition Waste Prevention and Management Plans for all types

  • f contract works – railway lines, bridges, overpasses and underpasses, villages,

markets, health centres, stadiums, buildings, warehouses, retail parks, stores, schools, universities, libraries

slide-31
SLIDE 31

31

HEALTH AND SAFETY

HEALTH AND SAFETY MANAGEMENT OF WORKS

  • Health and Safety Management of the Machado de Castro High School

Contract Works (Profico – Projetos, Fiscalização e Consultadoria, Lda./Parque Escolar, E.P.E.), 2008

  • Health and Safety Management of the Guarda Wind Farm Expansion

Contract Works (CENTEOL – Centrais Eólicas Reunidas, S.A.)., 2008

  • Health and Safety Management of the French High School (Lisbon)

Renovation Contract Works (French Embassy in Portugal), 2007

  • Health and Safety Management of the SNESGES Iron and Steel Plant

Deactivated Facilities Dismantlement and Demolition Contract Works (SNESGES – Administração e Gestão de Imóveis e Prestação de Serviços, S.A.), 2007

  • Health and Safety Management of the RURAL INFORMÁTICA Computer

Centre Building Rehabilitation and Expansion Contract Works (RURAL INFORMÁTICA), 2007

HEALTH AND SAFETY MONITORING OF WORKS

  • Health and Safety Monitoring of the Underwater Survey Programme of the

Bridges – North Area 31 and South Area 30 (Profico – Projectos, Fiscalização e Consultadoria, Lda./EP - Estradas de Portugal), 2007

  • Health and Safety Monitoring of the Contract Works for the Construction of

Public Spaces, Access and Parking for the São João do Estoril and Carcavelos beaches (TRAPSA – Empresa de Transformações Agrárias, S.A./TRAGSA/JAOP – Sociedade de Empreitadas, S.A.), 2007

  • Health and Safety Monitoring of the Storm Sewer Construction Works at the

Sidewalk of Carcavelos beach (East Side) (TRAPSA – Empresa de Transformações Agrárias, S.A.), 2006Health and Safety Monitoring in the Contract Works for the Construction of the Rain Drainage System of the Carcavelos Beach Seafront Path (Eastern Side), (TRAPSA), 2005

HEALTH AND SAFETY PLANS (HSP)

Health and Safety Plans for different types of contract works – railway lines, bridges,

  • verpasses and underpasses, museums, stores, schools
slide-32
SLIDE 32

PROFICO AMBIENTE E ORDENAMENTO, LDA. Morada: Rua Alfredo da Silva 11-B 1300-040 Lisboa E-mail: ambiente@profico.pt Tel.: (+351) 21 361 93 60 Fax: (+351) 21 361 93 69 www.proficoambiente.pt