DCT Gdansk Presentation 20th March 2019 Mateusz Frankiewicz, - - PowerPoint PPT Presentation

dct gdansk presentation
SMART_READER_LITE
LIVE PREVIEW

DCT Gdansk Presentation 20th March 2019 Mateusz Frankiewicz, - - PowerPoint PPT Presentation

DCT Gdansk Presentation 20th March 2019 Mateusz Frankiewicz, Marketing Business Partner Why Choose DCT Gdansk? 2 1 Unique Location has made DCT Largest and Fastest-Growing Container Terminal in the Baltic Sea 2 Only Deep-Water Terminal in


slide-1
SLIDE 1

DCT Gdansk Presentation

20th March 2019

Mateusz Frankiewicz, Marketing Business Partner

slide-2
SLIDE 2

Unique Location has made DCT Largest and Fastest-Growing Container Terminal in the Baltic Sea Only Deep-Water Terminal in the Baltic Capable of Receiving Direct Vessel Calls from Asia Best Road and Intermodal Connectivity to Whole of Polish Market

Northern Gateway to Central and Eastern Europe with Price Advantage

1 2 3 4 5 6

Most Cost-Effective Hub Port for the Upper Baltic Market World-Class Operating Performance & Ice-Free Year Round

Why Choose DCT Gdansk?

2

slide-3
SLIDE 3

3 DCT Gdansk: Best in Class Marine Access

A Port With Zero Access Restrictions

Port Restrictions for 17m depth

GDANSK

None

ROTTERDAM

None

WILHELMSHAVEN

None

BREMERHAVEN

Weser, tides

HAMBURG

Elbe, tides, turning circles

AARHUS

Depth (14 m)

GOTHENBURG

Depth (13.5 m)

ANTWERP

Schelde, tides, locks

KOPER

Depth (14.5 m)

Gdansk Hamburg Wilhelmshaven Bremerhaven Aarhus Gothenburg Rotterdam Antwerp

Deepwater Terminal Deepwater Terminal without nautical restrictions (ie. 17m depth)

Koper

POLAND

Winter Ice Line

slide-4
SLIDE 4

4

:

3,25* mln TEU

Annual capacity

2.5 km

Railway siding with tracks (4)

2 Deepwater berths

(up to 17m)

14 STS cranes

(up to 26 rows)

40

RTG and eRTG yard cranes

1.072

Reefer plugs

556

Vessel calls in 2018

950+

Employees

DCT Gdansk: Technical Specifications

Facts and Figures 8.200 m2

CFS

* Incl. T2B project

slide-5
SLIDE 5

5

T1

6 x 18-wide STS

T2

8 x 25-wide STS* Logistics Zone Gdansk City Unrestricted Rail & Highway Access

DCT Gdansk

DCT Gdansk: Unrestrained Location

Dedicated Logistics and Intermodal Access

T1

6 x 18-wide STS

T2

8 x 25-wide STS* Logistics Zone Gdansk City Unrestricted Rail & Highway Access

DCT Gdansk

*by end Q1 2019

slide-6
SLIDE 6

Polish Container Terminals Volume

DCT Gdansk Customer Volume Development 2008-2018

6

Direct Call Effect on Polish Container Volume

Source: Official PL statistics NAMIARY na Morze i Handel, DCT Gdansk internal data 0% 10% 20% 30% 40% 50% 60% 70% 80% 500 000 1 000 000 1 500 000 2 000 000 2 500 000 3 000 000 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 Other terminals DCT Market share

Mostly By Transhipment Mostly Direct Calls

slide-7
SLIDE 7

7

Marine Access to DCT

Deep Sea Approach and Turning Circles to Operate Largest Vessels

Three turning circles with the diameters

  • f 650m and 670m

Approach Fairway 17 meters deep with no tidal restrictions

Source: Port of Gdansk

DCT Gdansk operates 24/7, 365 days a year.

slide-8
SLIDE 8

8

399m 59m Up to 10 tiers

DCT Gdansk

No Restrictions Regarding Vessel Size – Today and Tomorrow

slide-9
SLIDE 9

9 Deepsea Calls in DCT Gdansk

2M Alliance on a Weekly Basis

2010 - First Direct Call to Baltics from Far East with Maersk Line 2M Alliance - 10 years Vessel Sharing Agreement between ML and MSC FEB 2015 - The first 2M vessel call to Gdansk Services: AE10 (ML) / Silk (MSC) / NERA 6 (HSUD) / EU2 (HMM) +18 000 TEU capacity container vessels deployed

TRANSIT TIME:

slide-10
SLIDE 10

10 Deepsea Calls in DCT Gdansk

OCEAN Alliance on a Weekly Basis

OCEAN Alliance - Vessel Sharing Agreement between COSCO, CMA-CGM Group, Evergreen, OOCL MAY 2017 - The first OCEAN vessel call to Gdansk Services: FX5 (APL), AEU1 (COSCO), FAL5 (CMA-CGM), NE1 (Evergreen), LL1 (OOCL) +21 000 TEU capacity container vessels deployed

TRANSIT TIME:

slide-11
SLIDE 11

11 DCT Gdansk: Regional Hub

Locational Advantage

(OA/ML) (OA/ML) (ML) (OA/ML) (OA/ML) (OA) (ML) (ML) (ML)

Regular Feeder Connections with Baltic Ports DCT as a Hub Port with Unique Location

slide-12
SLIDE 12

35% / 65% - rail to road ratio Fully open access terminal Priority for new non-Polish intermodal products 500 block trains served every month Rail connections with vast majority of inland container terminals and destinations in Poland Direct connection to the Czech Republic (AWT Paskov terminal near Ostrava) Served by most of intermodal operators in Poland (Rail Cargo Operator, Loconi Intermodal, PCC Intermodal, Spedcont, Erontrans, OstSped, PKP Cargo Connect, etc.) and biggest carriers (PKP Cargo, Lotos Kolej, CTL Logistics)

12

Creating Effective and Competitive Services

DCT Gdansk Intermodal Advantage

On-Dock Intermodal Solution

slide-13
SLIDE 13

Gdansk Intermodal: CEE Gateway

Via Czech Republic (Ostrava-Paskov Terminal)

13

CRITERIA

OCEAN TRANSIT TIME FROM KOREA (BUSAN) NUMBER OF FE CALLS PER WEEK RAIL TRANSIT (TIME) RAIL TRANSIT (DIST., km) MAX TRAIN LENGTH MAX TEU PER TRAIN Total Cost (EUR per TEU)**

PORT KOPER

29 days 2 1.5 days 853 500 70

1395

HAMBURG

35 days 12 1.5 days 840 750 110

1230

GDANSK

39 days 2 1.0 days 629 620/750* 90/110*

1105

* From 2019 ** Sea freight, Inland transit, THC in port

Direct service Gdansk – Ostrava – 2 Times/week DCT can offer both feeder connections to serve Baltics as well as competitive rail shuttle

DCT Gdansk - improved reliability with 15% cost reduction

slide-14
SLIDE 14

T2B Development Program

Starting Q1 2019, DCT Will be Offering Additional Capacity

RAILHEAD EXPANSION

  • 2 x RMGs (Q4/2019)
  • 3rd RMG (Q1/2020)
  • 2 additional rail tracks - 6 in total (Q3/2019)
  • Extension to 750m of 4 existing rail tracks (Q4/2020)

BERTH EXPANSION

Super-Post Panamax STS

  • 6th & 7th STS (JAN 2019)
  • 8th STS (Q2/2019)

YARD EXPANSION (Q4/2019)

  • 1,000+ ground slots

NEW eRTGs (Q2/2019)

  • 5 x e-RTGs

GATE EXPANSION (Q2/2019)

  • E-gate VBS system
  • Automated gate process
  • OCR cameras on gate and rail

14

BERTH EXPANSION

Super-Post Panamax STS

  • 6th STS (FEB 2019)
  • 7th and 8th STS (Q2/2019)

RAILHEAD EXPANSION

  • 3 x RMGs (H2/2019)
  • 3 additional rail tracks - 7 in total (Q4/2020)
  • Extension to 750m of 4 existing rail tracks (Q4/2020)

GATE EXPANSION (Q2/2019)

  • E-gate VBS system
  • Automated gate process
  • OCR cameras on gate and rail

YARD EXPANSION (Q4/2019)

  • 1,000+ ground slots

NEW eRTGs (Q2/2019)

  • 1 x eRTGs (April 2019)
  • 4 x eRTGs (May 2019)
slide-15
SLIDE 15

15

Tunnel under Vistula River

COMPLETED

Upgrade of railway 226 and new Railway bridge

COMPLETED

Expansion and upgrade of road network in Pomeranian Logistics Centre

ONGOING (Gdansk Municipality)

Expansion and upgrade

  • f road and rail network

Finalization: 2020 (Port Authority)

Parallel Investments in Gdansk

Road & Rail Modernization

Upgrade of rail network – additional track to DCT

Finalization: 2020 (Port Authority)

Scope of work – modernisation, redevelopment, and construction of about 5.6 km of roads (i.e. Kontenerowa Str.) and construction of 9.7 km of railways (i.e. track to DCT) and Northern Port railway station

Public truck parkings

Finalization: 2021 (Port Authority) Rail Network Port Logistics Center Road Network Port Railway station

slide-16
SLIDE 16

Maritime Adminstration investments:

New Fairway, Additional Breakwaters, Turning Circle Expansion

New breakwaters will be constructed by the Maritime Office Investment Value: EUR 211mln Tender process commenced Planned completion: by 2021 Reduction in pilot-station to berth time Multiple vessel arrival / departure Improved access resilience

16

Current infrastructure Planned infrastructure

Sea access: New breakwaters and turning circles

slide-17
SLIDE 17

17 DCT Gdansk: Hub for Today

…and Tomorrow

slide-18
SLIDE 18

THANK YOU!