slide-1
SLIDE 1

Corporate Presentation

November 2014

slide-2
SLIDE 2

Future Oriented Information

(See additional advisories at the end of this document)

  • In the interest of providing information regarding Paramount Resources Ltd.

("Paramount" or the "Company"), including management's assessment of the Company's future plans and operations, this presentation contains certain forward- looking information and forward-looking statements.

  • The projections, estimates and beliefs contained in such forward-looking

information and statements necessarily involve a number of assumptions and are subject to known and unknown risks and uncertainties which may cause the Company's actual performance and financial results in future periods to differ materially from any estimates or projections of future performance or results expressed or implied by such forward-looking statements. The material assumptions, risks and uncertainties are referred to in the advisories contained in the Advisories Appendix.

  • Accordingly, shareholders and potential investors are cautioned that events or

circumstances could cause actual results to differ materially from those predicted.

  • Any use of information contained within this presentation is expressly forbidden.

2

slide-3
SLIDE 3
  • Founded in 1974; IPO in 1978
  • TSX: POU
  • Market Cap: 104.8 MM shares @ $47/share ~ $4.9 Billion
  • ~50% insider ownership
  • Net Debt (September 30, 2014): $1.26 Billion
  • 2014 Capital Guidance: $900 MM

Low Risk/Repeatable Growth Operations focused on large-scale Deep Basin development

  • Large contiguous acreage
  • Multi-zone potential
  • High condensate/gas ratios
  • Owned and firm service access to infrastructure
  • Significant near-term growth in production and cash flow
  • Reach up to ~50,000 Boe/d in 2014; 70,000 Boe/d in 2015 (1)
  • Production mix evolving to ~45% liquids
  • Exposure to emerging plays and Strategic Investments
  • Duvernay
  • Oil sands
  • Liard Basin shale gas

Corporate Profile

3

(1) Production dependent on availability of downstream NGLs transportation and processing capacity (2) Estimated average sales for the month of October 2014

Corporate Profile

slide-4
SLIDE 4

4

Kaybob Resource

*Graphic courtesy of www.canadianoilstocks.ca

  • Deep Basin liquids-rich gas resources in

multiple stacked horizons

  • 40-160 Bcf/section DGIIP (1)
  • ~5+ Bcf EUR/Hz well (1)
  • >10 Tcf DGIIP + NGLs net to POU (1)

Paramount Acreage (gross):

  • 544 Sections Cretaceous Rights
  • 364 Sections Montney Rights
  • 249 Sections Duvernay Rights
  • Liquids-rich Montney gas play
  • ~70+ Bcf/section DGIIP (1)
  • ~ 22 Tcf DGIIP + NGLs net to POU (1)
  • Potential conventional Devonian exploration
  • Potential Duvernay Shale rock play

(1) Internal estimates: EUR denotes Estimated Ultimate Recovery, DGIIP denotes Discovered Gas Initially In Place. Please refer to "Oil and Gas Measures and Definitions" in the Advisories section

  • f this presentation for further information.
slide-5
SLIDE 5

Cretaceous Gas Resource

  • Hz Falher well at Musreau
  • Tested 16.4 MMcf/d(1) at

20.8 MPa

  • IP: 12.0 MMcf/d
  • Currently producing

~2.3 MMcf/d

  • Cost: $8.6 MM d/c/t
  • Hz Dunvegan well at

Resthaven

  • Tested 11.3 MMcf/d(1) at

6.2 MPa

  • IP: 8.3 MMcf/d
  • Currently producing

~1.2 MMcf/d

  • Cost: $8.3 MM d/c/t

5

(1) Please refer to the heading "Test Results" in the Advisories section of this presentation for further information

slide-6
SLIDE 6

6

Cretaceous Economics

Assumptions Capital: $7.0 MM horizontal well IP: 9.0 MMcf/d Natural Gas (raw): 4.9 Bcf Condensate: 14 Bbl/MMcf C2-C4 NGLs: 6 Bbl/MMcf Refrig facility (61 Bbl/MMcf Deep Cut facility) Economics @ $4.00 AECO, $90.00 WTI (Refrig) NPV 10%: $9.0 MM IRR: 97% Payout (Months): 14 P/I: 2.2

slide-7
SLIDE 7

Montney Gas Resource

  • Liquids-rich Montney gas play
  • Paramount holds ~313 net sections of

Montney rights

  • 2011/2012 program included 12 Hz Montney

wells: tested 5.5-15.4 MMcf/d(1)

  • Montney 2013 program: Drilled 13 wells;

commenced drilling 25 additional wells off 3 pads

  • 24 Kaybob Montney wells rig released YTD

in 2014 including 23 pad wells

  • 3-20 10-well pad completed in Q3 2014 with

combined test rates of 108 MMcf/d + NGLs(1)

  • Two new 6-well pads have spud
  • Offset activity indicating exciting test rates
  • f over 10 MMcf/d + NGLs

(1) Please refer to the heading "Test Results" in the Advisories section of this presentation for further information

7

slide-8
SLIDE 8

8

Montney Economics

Assumptions Capital: $10.0 MM horizontal well IP: 5.8 MMcf/d Natural Gas (raw): 3.0 Bcf Condensate Gas Ratio (CGR): 150 Bbl/MMcf (50 Bbl/MMcf - 400 Bbl/MMcf) C2-C4 NGLs: 90 Bbl/MMcf Deep Cut facility (20 Bbl/MMcf Refrig facility) Economics @ $4.00 AECO, $90.00 WTI (Deep Cut) NPV 10%: $18.1 MM IRR: 144% Payout (Years): 1.1 P/I: 2.9

slide-9
SLIDE 9

9

Montney Drilling/Completion Improvements

  • Pad drilling/pad layout
  • Bits/muds/motors
  • Well design: monobores/orientation/reservoir placement
  • Toe up/toe down: effects on production
  • Natural gas fueled rigs
  • Plug and perf/sliding sleeves
  • Cemented liners/open-hole packers (ECP’s)
  • Frac sizing/spacing/clusters
  • Frac fluid selection /fluid handling
  • Pumping techniques
  • Frac fluid recycling
  • Proppants
  • Flow back/production practices
slide-10
SLIDE 10

Musreau

2014 Capital Plan

  • Drill 27 (27 net)

horizontal Montney wells

  • Start drilling 12 (12 net)

Montney pad wells

  • Drill 6 (5.8 net)

horizontal Falher/Wilrich wells

  • Drill 4 (3.5 net) vertical

wells to hold lands

  • Bring ~70 (net) horizontal

wells on production during 2014

10

slide-11
SLIDE 11

Karr

  • Located 50 km SW of Grande

Prairie

  • Multi-zone potential, including

Halfway, Montney sour and Gething, Bluesky, Falher sweet commingled gas

  • Current lands ~93,500 net

acres (~146 sections)

  • Average 78% working interest
  • Expanded plant and gathering

systems to 40 MMcf/d

2014 Capital Plan:

  • Drill 2 (1.0 net) horizontal

Cretaceous wells

  • Drill 10 (9.3 net) horizontal

Montney wells

11

(1) Please refer to the heading "Test Results" in the Advisories section of this presentation for further information

slide-12
SLIDE 12

12

Gross Raw Capacity MMcf/d Net POU Raw Gas Capacity MMcf/d Potential Sales Volumes Boe/d (1)

Musreau Deep Cut Facility 200 200 50,000 Musreau Refrig Plant 45 45 8,500 Smoky Deep Cut Facility 200 40 10,000 Other Musreau area capacity 70 24 4,500 Subtotal 515 309 73,000 Capacity Under Construction Musreau Condensate Stabilizer Expansion

  • 15,000

6-18 Plant 100 100 25,000 3-15 Plant 100 100 25,000 Subtotal 200 200 65,000 Projected Total 715 509 138,000

(1) Please refer to the heading “Potential Sales Volumes” in the Advisories section for further information.

Kaybob Plant Capacity

slide-13
SLIDE 13

13

Kaybob Processing Capacity (1)

(1) Please refer to the heading “Kaybob Processing Capacity” in the Advisories section for further information.

slide-14
SLIDE 14

Full Capacity at Musreau

  • Amine system
  • Commissioning underway; onstream December 2014
  • Treat sour production at plant instead of wellsites
  • Liquids transportation
  • Pembina HVP in-service
  • LVP in-service
  • De-ethanization capacity
  • Current 8,000 Bbl/d gross C2+ capacity
  • Interruptible capacity with other fractionators
  • Keyera De-ethanizer expansion
  • Phase 1 by Q1 2015 (13,000 Bbl/d)
  • Phase 2 mid-2015 (19,000 Bbl/d)
  • Condensate stabilizer expansion
  • Additional 15,000 Bbl/d
  • Commission Q1 2015; onstream April 2015
  • Long-term contracts
  • Firm service with TCPL
  • 10 year liquids transportation with Pembina
  • 10 year de-ethanization and fractionation with Keyera
  • 10 year ethane sales agreement

Currently operating one sales compressor (120 MMcf/d); 8,000 Bbl/d C2+ stabilization capacity of 8,500 Bbl/d

Full Capacity at Musreau

slide-15
SLIDE 15

Musreau 8-13 Complex

October 13, 2014 15

slide-16
SLIDE 16

200 MMcf/d x 23% Shrinkage = 154 MMcf/d Sales Gas (25,667 Boe/d) + 22,000 Bbl/d condensate + 18,000 Bbl/d NGLs Price Deep-Cut Sales Gas $4.00/Mcf

Yield Bbl/MMcf

154 MMcf/d $616,000 Condensate $90.00/Bbl

110

22,000 Bbl/d $1,980,000 Butane $65.00/Bbl

12.5

2,500 Bbl/d $162,500 Propane $35.00/Bbl

25

5,000 Bbl/d $175,000 Ethane $12.00/Bbl

52.5

10,500 Bbl/d $126,000 Total: 65,667 Boe/d $3,059,500/day Royalty 5% ($152,975/day) Operating Cost ($3.00/Boe) ($197,000/day) Total: 24.0 MMBoe/year $2,709,525/day $989 MM/year $41.26/Boe

16

Illustrative Deep-Cut - Montney Wells

slide-17
SLIDE 17

17

Paramount Deep-Cut Montney - Illustrative Project Economics

  • Paramount’s shallow rights will add substantially to the RLI
  • Paramount has de-risked a substantial amount of its land base and thus could

have the potential to add a series of refrigeration or deep cut plants

  • Simple Payout from free cash flow after start up is 1.0 - 2.2 years

Resource Needed:

200 MMcf/d x 365 ~ 73 Bcf/year x 10 year RLI = 730 Bcf 70 Bcf/section @ ~ 50% recovery = ~ 20 Sections

Cost

60 (5 MMcf/d wells) x $10 MM/well = $600 MM Gas Plant = $250 MM Total: $850 MM

Annual Deep - Cut Cash Flow $989 MM/year Annual Capital = 25 (3.0 Bcf) wells x $10 MM/well $250 MM/year Free Cash Flow $739 MM/year

slide-18
SLIDE 18

18

Pembina Peace Pipeline Expansion

Numbers provided by Pembina Pipelines

LVP Capacity (Bbl/d) HVP Capacity (Bbl/d) In-Service

Current 195,000 115,000 Phase 2 Expansion 55,000 20,000* 2015 Phase 3 Expansion 320,000** 2016/2017 Total 705,000

* By displacement onto 53,000 Bbl/d Pembina North Expansion * *LVP/HVP combined; split to be determined

slide-19
SLIDE 19

Willesden Green

Duvernay Shale Play

  • 64,452 (34,305 net) acres of land

when earning complete(1)

  • Drilled and completed 2 Hz

Duvernay wells to date:

  • Well #1 flowed back ~12,200 Bbl of

condensate and oil and ~11.0 MMcf of natural gas; scheduled to be brought

  • n production Q4 2014
  • Well #2 flowed back ~3,600 Bbl of

condensate and oil and ~16.0 MMcf of natural gas; scheduled to be brought

  • n production in 2015.
  • Drilling one additional Hz Duvernay

well before year end

19

(1) Includes Duvernay lands to be earned.

Paramount has explored for ideal combinations of rock quality/liquids ratio/pressure gradient

slide-20
SLIDE 20

20

Montney

  • Montney shale play (50% WI)
  • Seven Hz Montney wells
  • Production has been processed through pilot facility

limited to 3 MMcf/d

  • NGL yields average 60 Bbl/MMcf
  • Montney/Doig Play
  • 16 wells tied in at restricted rates (midstream

constraints)

  • Evaluating long term production/economics to

determine future investment levels

Valhalla: ~65 sections (~49 net) Montney/~67 sections (~34 net) Doig rights

Birch: ~67 sections (~34 net) Montney rights

(1) Please refer to the heading "Test Results" in the Advisories section of this presentation for further information (2) Based on results from Paramount's wells and publicly disclosed results of competitor wells.

slide-21
SLIDE 21

Paramount Investments

slide-22
SLIDE 22

22

Paramount Investments

slide-23
SLIDE 23

Cavalier Energy Inc.

slide-24
SLIDE 24

24

Cavalier Energy Inc.

  • Approximately 345 (net) sections
  • Prospective primarily for conventional
  • ilsands, bitumen in carbonates, and

cold-flow heavy oil

  • Hoole Project: 100% WI

(1) Resource estimates are Best Estimates based on McDaniel independent engineering reports dated as of October 31, 2011 for Saleski, Granor and Orchid; April 30, 2010 for Eagles Nest; and July 31, 2014 for Hoole. Please refer to "Oil Sands Measures and Definitions" in the Advisories section of this presentation for oil sands reserves, resources and related definitions (including NPV).

  • Created in December 2011; experienced

team led by CEO Dr. Will Roach

  • Paramount contributed its oilsands assets

and seed capital to Cavalier

  • Funding at the Cavalier level will be via a

combination of equity and debt

  • Assets retained as 100% WI within Cavalier

Energy

  • Regulatory approval for the development of

the first 10,000 Bbl/d SAGD project at Hoole received June 2014 Corporate Profile Corporate Resources

slide-25
SLIDE 25

250 275 Kgrand_rp Kjoli_fou

Hoole Grand Rapids - 1st Project

Grand Rapids Reservoir

  • Φ = 30 %, k = 1 to 4 D
  • d = 250m, h ~ 20m, p = 1,500 kPa
  • Viscosity = 200,000 to 2,000,000 cp
  • McDaniel Best Estimate: DEBIP = 2.7 Billion Bbl(1)
  • 80 wells drilled to date; 42 cored
  • 93 Million Bbl Probable Undeveloped Reserves

and 1,157 Million Bbl Best Estimate Contingent Resource(1)

  • Probable Reserves NPV BT 10%: $404 Million(1)
  • Contingent Resource Best Estimate NPV BT 10%:

$2.4 Billion(1)

25

(1) Independent evaluation by McDaniel & Associates Consultants Ltd. effective July 31, 2014 Please refer to "Oil Sands Measures and Definitions" in the Advisories section of this presentation for oil sands reserves, resources and related definitions

slide-26
SLIDE 26

Liard, NWT

Shale Gas

slide-27
SLIDE 27

27

Liard Basin

Besa River Shale Play

  • Drilled and completed b-40-I
  • Completion of d-57-D horizontal

deferred as land earning completed

  • Initiated drilling d-71-G
  • Drilling c-37-D at La Biche planned

for 2015

  • Liard Basin industry estimates(1):
  • 170-500 Bcf / section OGIP
  • ~20% expected recovery
  • ~34-100 Bcf sales gas/section
  • Paramount holds ~156 net sections

with production potential from the Besa River shale gas formation

(1) As publicly disclosed by a large U.S. public E&P company with significant landholdings in the Liard Basin. The resource evaluation disclosed by such E&P company was not noted as having been prepared independently or by a qualified reserves evaluator or auditor (as such terms are defined in NI 51-101) or in accordance with the COGE Handbook. This information is relevant to Paramount’s landholdings in the Liard Basin as the information is in respect of landholdings in the Liard Basin that are close to Paramount’s lands and are, accordingly, likely to have similar geology.

slide-28
SLIDE 28

MGM Energy

28

Mackenzie Delta

  • Land holdings ~ 300,000 (155,000 net) acres
  • Contingent Resources 473 Bcf (1)

Central Mackenzie

  • Land holdings ~1,300,000 (725,000 net) acres
  • Contingent Resources 92 Bcf (1)

Canol Resource Summary

  • Discovered Oil Initially-In-Place ("DOIIP")

625 MMBbl (2)

  • Undiscovered Oil Initially-In-Place ("UOIIP")

4,800 MMBbl (2)

(1) Contingent resource estimates are Best Estimates based on internal engineering studies completed by qualified reserves evaluators and audited by a qualified reserves auditor as of December 31, 2007 for Olivier, Langley, Ellice, Nogha and Umiak and as of March 16, 2009 for

  • Qavvik. Refer to "Oil and Gas Measures and Definitions" in the advisories section of this

presentation for further information. (2) Estimates of DOIIP and UOIIP are based on internal engineering studies completed by qualified reserves evaluators as of December 31, 2013. These estimates include adjustments for working interest, but not for royalties or other encumbrances and reflect the mean volume

  • f OIIP from the probabilistic assessment of oil that is in place. Refer to "Oil and Gas

Measures and Definitions" in the advisories section of this presentation for further information.

slide-29
SLIDE 29

29

Quarterly Operating Results

slide-30
SLIDE 30

30

Conventional Reserves

Columns may not add due to rounding. Conventional reserves only. Includes nominal amounts of estimated reserves in respect of Paramount's initial shale gas well at Patry, B.C.

slide-31
SLIDE 31

Summary

  • Exposure to significant reserve opportunities

– Kaybob Deep Basin: Cretaceous, Montney – Karr: Montney – Valhalla: Montney, Doig – Willesden Green: Duvernay – Birch: Montney

  • Significant asset value

– Trilogy – MEG Energy – Cavalier Energy – Liard Shale Gas

  • Paramount continues to provide long-term value creation for

shareholders

31

slide-32
SLIDE 32

ADVISORIES APPENDIX

slide-33
SLIDE 33

Advisories

Certain statements in this presentation constitute forward-looking information under applicable securities legislation. Forward-looking information typically contains statements with words such as "anticipate", "believe", "estimate", "will", "expect", "plan", "intend", "propose", or similar words suggesting future outcomes or an outlook. Forward looking information in this presentation includes, but is not limited to: projected production and sales volumes and growth and the timing thereof; forecast capital expenditures; exploration, development and associated operational plans and strategies (including planned drilling programs, well tie ins and potential future facility expansions and additions); projected timelines for, constructing, commissioning and/or starting-up new and expanded natural gas processing and associated facilities, and the Kaybob COU’s processing capacity following the completion of these facilities; reserves and resources estimates (including internal estimates of DGIIP, EUR , OIIP and contingent resources related to Paramount properties and estimated net present values of oil sands reserves and resources); illustrative deep-cut processing economics (including the commodity price, royalty rate, capital and operating cost, production volume, NGLs yield, well reserves, reserve life index, cash flow and payout assumptions used therein); Paramount’s potential ability to build and utilize additional processing facilities; projected type well production profiles and net present value estimates (and the initial production rate, reserves, capital and operating cost, shrinkage, NGLs yield and NGLs pricing assumptions used to generate such profiles and estimates); and general business strategies and objectives. Such forward-looking information is based on a number of assumptions which may prove to be incorrect. Assumptions have been made with respect to the following matters, in addition to any

  • ther assumptions identified in this presentation or Paramount’s continuous disclosure documents:

future oil, bitumen, natural gas, NGLs and other commodity prices; royalty rates, taxes and capital, operating, general & administrative and other costs; foreign currency exchange rates and interest rates; general economic and business conditions; the ability of Paramount to obtain the required capital to finance its exploration, development and other operations; the ability of Paramount to obtain equipment, services, supplies and personnel in a timely manner and at an acceptable cost to carry out its activities; the ability of Paramount to secure adequate product processing, transportation, fractionation, de-ethanization and storage capacity on acceptable terms; the ability of Paramount to market its oil, bitumen, natural gas and NGLs successfully to current and new customers; the ability of Paramount and its industry partners to obtain drilling success (including in respect of anticipated production volumes, reserves additions and NGLs yields) and operational improvements, efficiencies and results consistent with expectations; the timely receipt of required governmental and regulatory approvals; and anticipated timelines and budgets being met in respect of drilling programs and other operations (including well completions and tie-ins and the construction, commissioning and start-up of new and expanded facilities). Although Paramount believes that the expectations reflected in such forward looking information are reasonable, undue reliance should not be placed on them as Paramount can give no assurance that such expectations will prove to be correct. Forward-looking information is based on current expectations, estimates and projections that involve a number of risks and uncertainties which could cause actual results to differ materially from those anticipated by Paramount and described in the forward-looking information. These risks and uncertainties include and/or relate (but are not limited) to: fluctuations in oil, bitumen, natural gas, NGLs and other commodity prices; changes in foreign currency exchange rates and interest rates; the uncertainty of estimates and projections relating to future revenue, future production, NGLs yields, royalty rates, taxes and costs and expenses; the ability to secure adequate product processing, transportation, fractionation, de- ethanization and storage capacity on acceptable terms; operational risks in exploring for, developing and producing crude oil, bitumen, natural gas and NGLs; the ability to obtain equipment, services, supplies and personnel in a timely manner and at an acceptable cost; potential disruptions or unexpected technical or other difficulties in designing, developing, expanding or operating new, expanded or existing facilities (including third party facilities); industry wide processing, pipeline, de-ethanization, and fractionation infrastructure outages, disruptions and constraints; risks and uncertainties involving the geology of oil and gas deposits; the uncertainty of reserves and resources estimates (including internal estimates of DGIIP and EUR); the ability to generate sufficient cash flow from operations and obtain financing at an acceptable cost to fund planned exploration, development and operational activities and meet current and future obligations (including costs of anticipated new and expanded facilities and other projects and product processing, transportation, fractionation, de-ethanization and similar commitments); changes in, or in the interpretation of, laws, regulations or policies (including environmental laws); the ability to obtain required governmental or regulatory approvals in a timely manner and to enter into and maintain leases and licenses; general business, economic and market conditions; the effects of weather; the timing and costs of future abandonment and reclamation obligations and potential liabilities for environmental damage and contamination; uncertainties regarding aboriginal claims and in maintaining relationships with local populations and other stakeholders;

33

slide-34
SLIDE 34

34

Advisories cont’d

the outcome of existing and potential lawsuits, regulatory actions, audits and assessments; and other risks and uncertainties described elsewhere in this presentation and in Paramount’s filings with Canadian securities authorities, including its Annual Information Form. The foregoing list of risks is not exhaustive. Additional information concerning these and other factors which could impact Paramount are included in Paramount’s most recent Annual Information

  • Form. The forward-looking information contained in this presentation is made as of the date hereof and, except as required by applicable securities law, Paramount undertakes no obligation to

update publicly or revise any forward-looking statements or information, whether as a result of new information, future events or otherwise. Oil and Gas Measures and Definitions This presentation contains disclosure expressed as "Boe", "MBoe", "MMBoe, and "Boe/d". All oil and natural gas equivalency volumes have been derived using the ratio of six thousand cubic feet of natural gas to one barrel of oil. Equivalency measures may be misleading, particularly if used in isolation. A conversion ratio of six thousand cubic feet of natural gas to one barrel of oil is based on an energy equivalency conversion method primarily applicable at the burner tip and does not represent a value equivalency at the well head. For the nine months ending September 30, 2014, the value ratio between crude oil and natural gas was approximately 19:1. This value ratio is significantly different from the energy equivalency ratio of 6:1. Using a 6:1 ratio would be misleading as an indication of value. This presentation contains internal estimates of Discovered Gas Initially in Place ("DGIIP") and Estimated Ultimate Recovery ("EUR") in respect of the Company’s Kaybob area lands and DOIIP and UOIIP in respect of the Company’s Mackenzie Valley lands. DGIIP means that quantity of gas that is estimated, as of a given date, to be contained in known accumulations prior to

  • production. The recoverable portion of DGIIP includes production, reserves and contingent resources; the remainder is unrecoverable. DGIIP is the most specific category that could be assigned

to the applicable gas resource. There is no certainty that it will be commercially viable to produce any portion of this DGIIP. EUR means those quantities of oil or gas which are estimated, on a given date, to be potentially recoverable from an accumulation, plus those quantities of oil or gas already produced therefrom. DOIIP and UOIIP mean that quantity of oil that is estimated, as of a given date, to be contained in known accumulations prior to production. There is no certainty that it will be commercially viable to produce any portion of the resources. DOIIP is the most assignable category for the resources assigned to EL 466 as a well specifically targeting the Canol shale oil play has been drilled, however, there is insufficient data to determine an expected recovery factor and therefore a contingent or prospective resource or reserve amount cannot be estimated. UOIIP is the most assignable category to the remaining Mackenzie Valley Canol oil leases as no wells specifically targeting the Canol shale oil play have been drilled on these exploration licenses. Also, there is insufficient data to determine an expected recovery factor and therefore a contingent or prospective resource or reserve amount cannot be estimated. There is no certainty that any portion of the resources will be discovered. If discovered, there is no certainty that it will be commercially viable to produce any portion of the resources. “Contingent Resources” in respect of the Company’s Mackenzie Delta lands the means those quantities of naturel gas estimated on a given date to be potentially recoverable from known accumulations but are not currently economic due to: (i) lack of pipeline infrastructure, making the project uneconomic on a stand-alone basis; (ii) potential regulatory issues with respect to the construction of the pipeline and facility infrastructure; (iii) lack of demonstrated intent to bring the volumes to market within a specific time frame; and (iv) insufficient drilling or technical data to accurately estimate total pool productivity. Conventional reserve estimates include nominal amounts of volumes and future net revenues related to Paramount’s completed shale gas well. The estimates of reserves and future net revenue for individual properties may not reflect the same confidence level as estimates of reserves and future net revenue for all properties, due to the effects of aggregation. In addition, estimates of future net revenue do not represent fair market value. Non-GAAP Measures In this presentation “Net Debt” and “Funds Flow” (collectively, the “Non-GAAP measures”) are used and do not have any standardized meanings as prescribed by GAAP. Net Debt is a measure

  • f a company's overall debt position after adjusting for certain working capital amounts and is used by management to assess a company’s overall leverage position. Funds flow refers to cash

from operating activities before net changes in operating non-cash working capital, geological and geophysical expenses and asset retirement obligation settlements. Funds flow is commonly used in the oil and gas industry to assist management and investors in measuring a company’s ability to fund capital programs and meet financial obligations. Non-GAAP measures should not be considered in isolation or construed as alternatives to their most directly comparable measure calculated in accordance with GAAP, or other measures of financial performance calculated in accordance with GAAP. The Non-GAAP measures are unlikely to be comparable to similar measures presented by other issuers.

slide-35
SLIDE 35

35

Advisories cont’d

Test Results The Kaybob test rates disclosed in this document represent the average rate of gas-flow during post clean-up production testing at the largest choke setting. The flow tests typically range from 5 to 53 hours in duration. Karr-Gold Creek and Valhalla test rates represent the average rate of gas-flow during the last 12 hours of post-clean up production testing up 2 7/8” tubing. Pressure transient analyses and well-test interpretations have not been carried out for any of these wells and, as such, all data should be considered preliminary until such analyses or interpretations have been done. Liquids yields have not been included in the Kaybob, Karr-Gold Creek and Valhalla test results as the bulk of the tested wells were fracture stimulated using frac

  • il with the result that substantially all liquids recovered during the test period were load fluid. Test results are not necessarily indicative of long-term performance or of ultimate recovery.

Potential Sales Volumes "Potential Sales Volumes" means the potential volumes of saleable natural gas and NGLs (expressed on a combined basis in Boe/d) that could result from processing the associated quantities of raw natural gas set out in the "Net POU Raw Gas Capacity" column. These potential sales volumes should not be construed as a projection of Paramount's Kaybob area production at or by any particular date, as they will include some unavoidably commingled third-party production, and are subject to a number of factors and contingencies including the following: (a) production volumes sufficient to fill Paramount's processing capacity will not be available in all periods and under certain conditions; (b) during maintenance periods and at other times, the processing facilities will not

  • perate at design capacity; and (c) NGLs sales volumes will vary depending on the liquids content of individual wells and the manner in which the facilities are operated. The potential sales

volumes for each facility, other than the 6-18 Plant and 3-15 Plant (the "New Plants"), have been estimated assuming that natural gas processing and condensate stabilization capacity is fully

  • utilized. The potential sales volumes for the New Plants have been estimated assuming that natural gas processing and condensate stabilization capacity is fully utilized, except for approximately

5,000 Bbl/d of potential sales volumes for each New Plant related to oversized condensate stabilization capacity. Kaybob Processing Capacity "Kaybob Processing Capacity" means the aggregate processing capacity of the Kaybob COU's owned and firm service natural gas and condensate processing facilities. These processing capacity estimates are subject to a number of assumptions and risks and should not be construed as projections of Paramount's Kaybob area production volumes at or by any particular date or

  • dates. The Company's net sales volumes in the Kaybob COU will be lower than the capacity shown because of a number of factors including, but not limited to: a) some unavoidably commingled

third-party volumes will be processed using Paramount capacity; b) the liquids content of wells will vary; c) production volumes sufficient to fill capacity will not be available in all periods and under certain conditions; and d) during maintenance periods and at other times, the facilities will not operate at design capacity. Increases in Kaybob COU processing capacity are shown at the mid-point of the period in which new facilities and facilities expansions are scheduled to be completed. However, the completion

  • f such facilities may occur at any point during such period or may occur in a different period and the actual ramp-up will be different than depicted.

Oil Sands Measures and Definitions This presentation contains disclosure of certain results of (i) an updated independent evaluation by McDaniel of the bitumen reserves and resources of Cavalier Energy Inc.’s (Cavalier) in the Grand Rapids formation in Cavalier’s Hoole oil sands property as of July 31, 2014; (ii) an independent evaluation by McDaniel of Cavalier’s bitumen resources in its Saleski and other carbonate bitumen properties (House, Orchid and Granor) as of October 31, 2011; and (iii) an independent evaluation by McDaniel of Cavalier's bitumen resources in its Eagle Nest oil sands property as of April 30, 2010 (collectively, the McDaniel Evaluations). Specifically, this presentation includes McDaniel’s assessment as of July 31, 2014 of Cavalier’s probable undeveloped reserves, best estimate economic contingent resources and discovered exploitable bitumen in place in the Grand Rapids formation at Hoole (and the estimated net present value of these probable undeveloped reserves and economic contingent resources); McDaniel’s best estimate as of October 31, 2011 of Cavalier’s contingent resources (technology under development) in its Saleski carbonate bitumen property and of the discovered and undiscovered exploitable bitumen in place at Saleski and Cavalier’s other carbonate bitumen properties; and McDaniel's best estimate as of April 30, 2010 of Cavalier's discovered and undiscovered bitumen in place in its Eagle's Nest property. These terms, as used in the McDaniel Evaluations, have the following meanings: “Probable reserves” are reserves that are less certain to be recoverable than proved reserves. Specifically, whereas proved reserves are reserves that can be estimated with a high degree of certainty to be recoverable (i.e. it is likely that the actual remaining quantities recovered will exceed the estimated proved reserves), in the case of probable reserves it is equally likely that the actual quantities recovered will be greater or less than the estimated probable reserves (or where there are both proved and probable reserves the sum of the estimated proved plus probable reserves).

slide-36
SLIDE 36

36

Advisories cont’d

"Contingent resources" are those quantities of bitumen resources estimated, as of a given date, to be potentially recoverable from known accumulations using established technology or technology under development, but which are classified as resources rather than reserves due to one or more contingencies, such as the absence of regulatory applications, detailed design estimates or near term development plans. "Economic contingent resources" are a sub-category of contingent bitumen resources that are considered to be currently economically recoverable based on the reserves evaluator’s then current forecasts of commodity prices and costs. At Hoole, a portion of Cavalier’s economic contingent resources were re-classified by McDaniel as probable reserves in McDaniel's evaluation effective as of December 31, 2012 by virtue of Cavalier having finalized its plans for a pilot project and submitted a regulatory application for this pilot project. Cavalier will need to finalize plans for the commercial development of the balance

  • f the Hoole oil sands properties and submit regulatory applications for their development before the balance of Cavalier's contingent resources at Hoole can be re-classified as probable
  • reserves. These same contingencies will also have to be overcome in the case of the Saleski carbonate bitumen property in order for Cavalier’s contingent resources in this property to be re-

classified as probable reserves. In addition, as sustained commercial production has not yet been obtained from any carbonate bitumen reservoirs, it will also be necessary in the case of the Saleski property to demonstrate the successful application of SAGD or other production technology to the Saleski reservoir (or a reasonable analog thereof). It is for this reason that Cavalier’s bitumen resources at Saleski are referred to as “contingent resources (technology under development)”. There is no certainty that it will be commercially viable to produce any portion of Cavalier’s contingent resources at either Hoole or Saleski. "Discovered bitumen in place" or "DBIP" (equivalent to discovered resources) is the aggregate quantity of bitumen that is estimated, as of a given date, to be contained in a known accumulation prior to production. To qualify as “discovered exploitable bitumen in place" or "DEBIP" these volumes must be contained in a reservoir that meets or exceeds certain characteristics, such as minimum continuous net pay, porosity and mass bitumen content. DBIP or DEBIP volumes that are considered to be recoverable as of a given date are classified as reserves or contingent resources (with the remaining DBIP or DEBIP volumes being those that are considered to be unrecoverable as of that date). "Undiscovered bitumen in place" or "UDBIP" (equivalent to undiscovered resources) is the aggregate quantity of bitumen that is estimated, as of a given date, to be contained in accumulations that have yet to be discovered. To qualify as “undiscovered exploitable bitumen in place” or "UDEBIP" these volumes must have been mapped using known data points penetrating the applicable subsurface stratigraphic intervals and possess definitive geophysical log data along with seismic data and regional mapping. At Hoole, DEBIP volumes have been ascribed by McDaniel to those portions of the Grand Rapids formation where they felt minimum continuous net pay, porosity, mass bitumen content and

  • ther reservoir characteristics allowed for the commercial application of known recovery technologies.

For Saleski and the other carbonate bitumen properties, DEBIP volumes have been restricted to those portions of the reservoirs that have a minimum thickness of 10 meters of substantially clean, continuous predominantly bitumen-saturated carbonate with log porosity of at least 10 percent and bitumen saturation greater than 50 percent, and with competent top and lateral reservoir

  • containment. In addition, DEBIP volumes have generally been limited to areas within one mile of known data points that penetrate the applicable stratigraphic intervals and possess definitive

geophysical log data. However, in certain circumstances DEBIP volumes have been assigned to areas outside these one mile limits were it was felt that reservoir continuity existed between

  • ffsetting data points.

There is no certainty that it will ever be commercially viable to produce any portion of: (i) the DEBIP at Hoole or at Saleski or any of the other carbonate bitumen properties; or (ii) the DBIP at Eagles Nest. There is also no certainty that any of the UDEBIP at Saleski and the other carbonate bitumen properties, or the UDBIP at Eagles Nest, will ever be discovered, or if it is discovered that it will ever be commercially viable to produce any portion of it. "Best estimate" is considered to be the best estimate of the quantity of contingent resources that will actually be recovered. It is equally likely that the actual remaining quantities recovered will be greater or less than the best estimate (or stated another way, there is a 50 percent confidence level that the actual quantities recovered will equal or exceed the best estimate amount). “Net present value” or “NPV” of Cavalier’s probable undeveloped reserves and economic contingent reserves at Hoole represents McDaniel’s estimates of Cavalier’s share of future net revenues, before the deduction of income taxes, from these reserves and resources discounted at 10%. In calculating these NPVs McDaniel considered items such as revenues, royalties, operating costs, abandonment costs and capital expenditures (but excluded financing and general and administrative costs). Their calculations assume natural gas is used as a fuel for steam generation, and are based on their forecast commodity prices as of January 1, 2014 and forecast costs as of December 31, 2013. Royalties were calculated based on Alberta’s Royalty Framework applicable to oil sands projects. McDaniel’s estimated NPVs do not represent fair market value.