Construction Site Stormwater Compliance
Presentation for CALBIG October 11, 2017
Peter Schultze‐Allen, EOA, Inc. LEED‐AP, Bay‐Friendly Qualified Professional
- n behalf of the San Mateo Countywide Water
Construction Site Stormwater Compliance Presentation for CALBIG - - PowerPoint PPT Presentation
Construction Site Stormwater Compliance Presentation for CALBIG October 11, 2017 Peter Schultze Allen, EOA, Inc. LEED AP, Bay Friendly Qualified Professional on behalf of the San Mateo Countywide Water Pollution Prevention Program
City/County Association of Governments (C/CAG) Stormwater Committee Technical Advisory Committee New Development and Construction Watershed Assessment and Monitoring Public Information/Participation Trash Committee Commercial/Industrial/Illicit Discharge (C/I/I) Public Works Municipal Maintenance Parks Maintenance/Integrated Pest Management
Green Infrastructure Technical Advisory Committee (GI TAC)
State SW Construction General Permit Municipal Regional Permit City/County Construction Site Control Program Construction Sites disturb ≥1 acre Construction Sites disturb <1 acre
—Has high potential for problems —Is adjacent to a creek
—an average slope of ≥15% (default) or —the Municipality using development
— actual and inferred
Examples of Bonded Fiber Matrix (BFM) and netting applications.
26
27
28
29
30
Six Months Later
32
Netting installed over the compost berm
33
6 Months After Installation Cotton Sock Burlap Sock
34
35
36
37
38
39
40
41
42
—At installation & 20% annually (once every 5 years)
—Likely not designed to handle sediment loading of active
construction sites
—If installed should be protected —Ground may need to be marked to protect from soil
compaction due to vehicle traffic
—Communicate with C.3 inspector – may not be obvious
during 45 day inspection BMP impacted