Colorado Transmission Planning Stakeholder Outreach Meeting 12.02.11

slide-2
SLIDE 2

Agenda

Meeting Purpose and “Ground Rules” Overview of Tri-State Tri-State Transmission Planning Process Colorado PUC Rule 3627 Transmission Capital Construction Plan for

Colorado

Questions

2

slide-3
SLIDE 3

Q&A and feedback

Please save your questions for the end of the

presentation, or submit via the webinar chat function

3

slide-4
SLIDE 4

Transmission Planning Annual Stakeholder Outreach Meeting on October 17, 2011

To allow stakeholders the opportunity to

participate in Tri-State’s transmission planning process consistent with:

 Development of Tri-State’s system wide

long-term transmission plans

 Attachment L of Tri-State’s OATT  CPUC 3627  Generator Interconnection Procedures

4

slide-5
SLIDE 5

Colorado Transmission Planning Stakeholder Outreach Meeting

 This meeting focuses on Colorado transmission

plans and CPUC Rule 3627.

 The purpose of this meeting is to allow

stakeholders the opportunity to:

 Be involved in and aware of transmission plans  Provide feedback and ask questions  Identify alternative solutions for consideration

 First meeting under the new CPUC Rule 3627

5

slide-6
SLIDE 6

Overview of Tri-State

 Tri-State is a member owned, not-for-profit, generation

and transmission cooperative

 44 member owners across NM (12), CO (18), NE (6), WY (8)  Members serve approximately 1.4 million  200,000 square miles of service territory

 Mission Statement:

 “Provide our member owners a reliable, cost-based supply of

electricity while maintaining a sound financial position through effective utilization of human, capital and physical resources in accordance with cooperative principles.”

6

slide-7
SLIDE 7

Tri-State G&T Member Cooperative Systems

7

slide-8
SLIDE 8

Basic Statistics

 Peak Member Load (Summer 2011) ~ 2654 MW  5 customers/ line mile average  Load by State

 New Mexico

471 MW ~ 17%

 Colorado

1729 MW ~ 61%

 Nebraska

357 MW ~ 12%

 Wyoming

277 MW ~ 10%

 Diverse Membership

 United Power– Brighton, CO – 65,000 meters – 300 MW  Garland L&P- Powell, WY – 1,900 meters – 6 MW

8

slide-9
SLIDE 9

Tri-State’s Transmission System

 Tri-State wholly or jointly owns 5,177 miles of transmission

 1220 miles - 345 kV  984 miles - 230 kV  184 miles - 138 kV  2740 miles - 115 kV  49 miles - 69 kV

 ~ 220 Stations  ~ 400 Communication Sites  DC Tie (Stegall, NE)

9

slide-10
SLIDE 10

Tri-State Transmission Planning Process

Tri- State’s Tariff provides the best description of our transmission planning process:

“Tri-State’s transmission planning process is intended to facilitate the timely and coordinated development of transmission infrastructure that both maintains system reliability and meets customer needs, while continuing to provide reliable low cost electric power to its 44 member cooperatives.”

slide-11
SLIDE 11

Tri-State Transmission Planning Objectives

  • Network Customer service
  • Point-To-Point Transmission Customer service
  • System Reliability
  • System load growth
  • Coordinate interconnections with neighboring TPs

11

slide-12
SLIDE 12

Coordinated Transmission Planning Process

 WECC  WestConnect  CCPG

12

slide-13
SLIDE 13

FERC Order 890 Planning Principles

 Coordination  Openness  Transparency  Information Exchange  Comparability  Dispute Resolution  Regional Coordination  Economic Planning Studies  Cost Allocation

13

slide-14
SLIDE 14

Transmission Planning Studies

 Reliability Studies

 Bulk System infrastructure  Sub-transmission

 Feasibility Studies  System Impact Studies  Transmission Service Requests  Generator Interconnection Studies  Facilities Studies  Economic Studies

14

slide-15
SLIDE 15

Transmission Planning Cycle

 Calendar year cycle- 10 year planning horizon

 3627 requires a 20 year plan starting in 2014

 Annual updates are filed with the RUS  Typical Transmission Planning activities are

numerous, ongoing, and specific milestone dates

15

slide-16
SLIDE 16

16

slide-17
SLIDE 17
slide-18
SLIDE 18

CPUC Rule 3627

Coordinated 10 year transmission planning First filing no later than February 1, 2012, Subsequent filings every other year Conceptual 20 year plans required beginning with the February 1, 2014 filing Specific stakeholder outreach seeks meaningful participation in the planning process

18

slide-19
SLIDE 19

Colorado Transmission Capital Construction Plan

 Projects included generally meet these criteria:

 Budgeted  > 100 kV  In Colorado

19

slide-20
SLIDE 20

Colorado Transmission Capital Construction Plan

slide-21
SLIDE 21

21

slide-22
SLIDE 22

22

slide-23
SLIDE 23

Big Sandy

Big Sandy-Calhan 230 kV Line

Calhan

23

slide-24
SLIDE 24

24

slide-25
SLIDE 25

25

slide-26
SLIDE 26

North Yuma

Burdett 115 kV Delivery Point Project

Burdett

26

slide-27
SLIDE 27

27

slide-28
SLIDE 28

Burlington-Wray 230 kV Line

Wray Burlington

28

slide-29
SLIDE 29

29

slide-30
SLIDE 30

Carey 230 kV Substation

Carey

30

slide-31
SLIDE 31

31

slide-32
SLIDE 32

South Kersey

DCP Midstream (South Kersey) 115 kV Delivery Point Project

Kersey West

32

slide-33
SLIDE 33

33

slide-34
SLIDE 34

Falcon-Midway 115 kV Line Uprate

Midway Falcon

34

slide-35
SLIDE 35

35

slide-36
SLIDE 36

Olive Creek 115 kV Delivery Point

Olive Creek Tap Olive Creek

36

slide-37
SLIDE 37

37

slide-38
SLIDE 38

Plaza Waverly

Plaza-Waverly 115 kV Loop Project

38

slide-39
SLIDE 39

39

slide-40
SLIDE 40

Weld

Promontory Park Project

Promontory Park

40

slide-41
SLIDE 41

41

slide-42
SLIDE 42

San Juan Project

Shiprock Iron Horse Kiffen Canyon

42

slide-43
SLIDE 43

43

slide-44
SLIDE 44

Prairie Center

United Power System Improvement Project (Phase III)

Bromley

44

slide-45
SLIDE 45

45

slide-46
SLIDE 46

Questions?

46

slide-47
SLIDE 47

For More Information

 www.tristategt.org/TransmissionPlanning

 Comment Form  Transmission Planning Documents  Presentation

 Email: TransmissionPlanning@tristategt.org

47

slide-48
SLIDE 48

Timeline for feedback and filing

 To provide comments and alternative solutions, email

TransmissionPlanning@tristategt.org by December 31, 2011

 Tri-State to evaluate those alternative solutions

provided, prepare recommendations for inclusion in its 10-year plan, and notify you of the recommendations by January 15, 2012

 Filing at Colorado PUC on February 1, 2012.

48