CLIC: from 380 GeV up to 3 TeV Many new agreements for X- band development and machines recently One new coll. inst. (Canadian Light Source, Saskatoon) WEB pages Nikos Kokkinis has taken over as responsible from Anastasiya Safronava


  1. CLIC: from 380 GeV up to 3 TeV Many new agreements for X- band development and machines recently One new coll. inst. (Canadian Light Source, Saskatoon)

  2. WEB pages • Nikos Kokkinis has taken over as responsible from Anastasiya Safronava (who did a great job getting our WEB pages in a good state – many thanks) • Nikos also covers LCC WEB pages and LC news (moved from Fermilab to CERN) • Will move to common intro page for CLIC (will become clic.cern) for acc. and phys/det: link)

  3. Various meetings • LCWS in Strasbourg in October • Asian LCWS in Japan late May • Next International LCWS will be in the Americas in the Autumn 2018 • ICFA seminar in Ottawa early November – CLIC presented by Phil • ECFA meeting CERN mid November – CLIC presented by Lucie • Again a reminder about the implementation meetings (typically on Friday 9-11)

  4. CLIC week in January – register now Goto: https://indico.cern.ch/ev ent/656356/overview

  5. CLIC week in January – now registered ? from� 9:00:00� AM Beam� Dynamics� X-band� Technologies� -� (BDS+DBRC+Stray� Test� Stands� and� Morning Fields) Components till� 1:00� PM 1:00� PM� -� 2:00� PM Beam� Dynamics� X-band� Technologies� -� from� 2:00� PM Beam� Dynamics� (1:� X-band� Technologies� -� (ATF2+MDI) Fabrication� /� CLIC� Injectors� +� ML� +� RTML� - High� Grad� Tests� &� RF� Afternoon Coffee Module� /� Technical� Adv.� Accel.� 2:� DR) design Systems till� 6:00� PM Technologies Wednesday Thursday Friday from� 9:00:00� AM CLEAR� /� short� Power� Sources� linacs� (e.g.� 3� CompactLight� (public� session) CLIC� plenary� (acc./phys./det.) Morning (Igor) GeV)� till� 1:00� PM 1:00� PM� -� 2:00� PM � Civil� CompactLight� from� 2:00� PM Engineering� and� Open� Common� Plenary� (for� all� Kick-Off� (closed� Afternoon Infrastructures/ CERN)� doors)� 1:30� PM� -� Main� tunnel� 4:30� PM till� 6:00� PM layout� CLIC� Collaboration� Board Dinner

  6. Main accelerator document for Strategy Ed� team Mick,� Phil,� Steinar,� Markus,� Nuria,� Thibaut,� Roberto,� Daniel Timeline First� draft� end� March� for� all� parts� Complete� draft� August� Complete� November� PiP Chapter Section� Pages Comments Intro� 3 intro,� context,� recall� CDR,� describe� document� 380� DB� � 30 Injectors� DR RTML ML BDS MDI Post.� Coll.� and� beam-dump� here,� also� technical� study� Integrated� studies� simulations,� include� operation/energy� scanning,� machine� prot DB� acc � DB� recomb Beam� transp Decelerators Dump� lines� 380� KL � 7 Introduction� and� parameters Main� linac� design Main� Linac� technical� unit Module� and� RF� unit� (Klystron,� pc,� RF) Higher� energies� 10 Introduction,� and� example� parameters "1.5� TeV� included� in� 3� TeV"� (1DB� to� 2� DBs) upgrade� from� Klystron� version Impact� on� systems ML,� sources,� DB,� … � "no� problem!" Progress� on� 3� TeV� BDS? improvements� on� 3TeV� design Energy� upgrades� with� future� techonlogies Two main documents; this one and one about what is needed for 2020-2026 (will describe the second more next time)

  7. CLEAR (no talk today but … . ) Link: https://indico.cern.ch/event/681488/ CLEAR� operation� 2017 Week 33 34 35 36 First� beam! Cont ’ d Cont ’ d First beam� to� August� 18 commissioning commissioning users VESPER 37 38 39 40 Installation of Beam� through VESPER Beam� tuning, plasma� lens plasma� lens plasma lens 41 42 43 44 BCM� WFM Inductive BPMs Cavity� BPMs improvement First� spark LAL:� injector� WFM plasma� lens optimisation 45 46 47 48 Laser� spot� study ESA� at� VESPER Combined AWAKE� screen VESPER THz studies WFM and� Cavity� BPMs 49:� VHEE 50-51:� Plasma� lens,� instrumentation,�THz … .

  8. ~3 GeV X-band linac and SPS for physics Non collider physics workshop 21-22.11 – introduced e-beams at CERN The physics case (light dark matter): https://indico.cern.ch/event/644287/contributions/2762531/attachments/1561974/ 2459592/CERN_Nov2017_Schuster.pdf (page 35 onwards most relevant) Use “LDMX type” of beam as reference (~10 16 electrons/year at around 10 GeV, in bunches of 1-10e per 5-25ns) Accelerator possibility at CERN: https://indico.cern.ch/event/644287/contributions/2758574/attachments/1563035/ 2461801/e-beams.pptx Many possibilities for physics - and accelerator R&D (see links above – more being considered)

  9. e-beam facility at CERN Accelerator implementation at CERN of LDMX type of beam X-band based 60m LINAC to 3 GeV in TT4-5. • Fill the SPS in 2s (bunches 5ns apart) via TT60 • Accelerate to ~10 GeV in the SPS • Slow extraction to experiment in 10s as part of the SPS super-cycle • Experiment(s) considered in UA2 area or – better - bring beam back on Meyrin site using TT10/TT2, two options at the end of TT10 now considered

  10. Today Drink/light food outside for the survivors at the end Several more suggestions for talks received – > CLIC WS and future PMs

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.