City of Kirkland Transportation Impact Fees April 13, 2007 BACKGROUND Develop Rate Study Impact Fee Project List Growth Estimates Trip Generation Rates for Land Uses Need for Update Program previously updated in 1999 GMA


  1. City of Kirkland Transportation Impact Fees April 13, 2007

  2. BACKGROUND � Develop Rate Study � Impact Fee Project List � Growth Estimates � Trip Generation Rates for Land Uses

  3. Need for Update � Program previously updated in 1999 � GMA requires regular updates � Project construction costs have increased substantially due to inflation and changes in scope � New projects added

  4. Transportation Impact Fees don’t pay for... � Existing deficiencies � Operating or maintenance expenses � Non-capacity improvements (i.e., pavement preservation) � Project On-site improvements � Stand-alone multi-modal projects, such as transit, park & ride, bike, pedestrians

  5. Transportation Impact Fee Rate Study Process City of Kirkland

  6. Project List � 16 year Horizon (2006-2022) � Capacity Projects needed to meet Concurrency � 13 Projects � Total Cost $48.3 Million City of Kirkland Transportation Impact Fee Rate Study

  7. Project List

  8. GROWTH ESTIMATES � 2006-2022 Data Land Use Category Unit of Measure 2006* 2022** Growth Single Family Housing Dwelling Units 10,489 11,954 1,465 Multi-Family Housing Dwelling Units 12,450 14,872 2,422 Office Square Feet 5,384,847 6,161,605 777,000 Retail Square Feet 3,765,355 3,974,210 209,000 Industrial Square Feet 2,668,361 2,551,561 (117,000) City of Kirkland Transportation Impact Fee Rate Study

  9. DEFICIENCIES ANALYSIS � City Level of Service (LOS) Standards adopted in Comprehensive Plan � 2007 Conditions Based on average LOS within sub-areas of city � Projects identified on List are within areas that are within City’s adopted LOS standard City of Kirkland Transportation Impact Fee Rate Study

  10. COST ALLOCATION Figure . Impact Fee Cost Allocation Concept

  11. COST ALLOCATION � Growth Impacts Separated for: � Kirkland 50% (Impact Fees) � Outside Kirkland 50% � Outside Kirkland Growth � “Through” Traffic � Half of Trips with One End in Kirkland and One End Outside � Development in Kirkland Only Pays for Growth in Kirkland

  12. COST ALLOCATION

  13. Funding Sources

  14. Developing the Transportation Impact Fee Schedule Impact Fee Cost Impact Fee Cost $22.7 Million $22.7 Million Cost per Peak Trip Cost per Peak Trip $3,398 $3,398 Trip Grow th Trip Grow th 6,674 in PM Peak Hr 6,674 in PM Peak Hr ITE Trip Rates ITE Trip Rates Cost per Cost per Land Use Unit Land Use Unit o Trips per Unit o Trips per Unit o o 52 Land Uses 52 Land Uses Fee Rate in Schedule Fee Rate in Schedule o Cost per dw elling o Cost per dw elling o o Cost per square foot Cost per square foot

  15. TRIP GENERATION � Over 50 Land Uses � 7th Edition ITE Manual � Adjust for “Pass-by” Trips � Adjust for Trip Lengths City of Kirkland Transportation Impact Fee Rate Study

  16. IMPACT FEE SCHEDULE � Cost/Trip = $3,398(PM Peak Hour) � Single Family (unit) $3,432 � Office (sq ft) $ 6.64 � Shopping Ctr (sq ft) $ 4.02 � Industrial Pk (sq ft) $ 4.64 City of Kirkland Transportation Impact Fee Rate Study

  17. Single Family Comparisons Single Family Housing $16,000 $14,000 $12,000 Impact Fees (per unit) $10,000 $8,000 $6,000 $4,000 High High Proposed $2,000 High Low Low Existing Low $0 Kirkland Redmond (2006) Bellevue (2005) Bothell (2002) Kenmore (2005) Woodinville Sammamish (current) (2006) (2006) Jurisdiction

  18. Office Comparisons Office $30.00 $27.50 $25.00 $22.50 Impact Fees (per square foot) $20.00 $17.50 $15.00 $12.50 $10.00 High $7.50 $5.00 Proposed High $2.50 High Low Existing Low Low $0.00 Kirkland Redmond (2006) Bellevue (2005) Bothell (2002) Kenmore (2005) Woodinville Sammamish (current) (2006) (2006) Jurisdiction

  19. Shopping Center Comparisons Shopping Center $25.00 $22.50 $20.00 $17.50 Impact Fees (per square foot) $15.00 $12.50 $10.00 $7.50 High $5.00 High Proposed $2.50 High Low Low Existing Low $0.00 Kirkland (current) Redmond (2006) Bellevue (2005) Bothell (2002) Kenmore (2005) Woodinville (2006) Sammamish (2006) Jurisdiction

  20. Questions?

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.