Central Florida Expressway Authority 1 T itle VI 2 Pha se 1 - - PowerPoint PPT Presentation

central florida expressway authority
SMART_READER_LITE
LIVE PREVIEW

Central Florida Expressway Authority 1 T itle VI 2 Pha se 1 - - PowerPoint PPT Presentation

Central Florida Expressway Authority 1 T itle VI 2 Pha se 1 12 SunRail stations 32 mile s F r e e par king at subur ban stations Platfor ms with c anopie s Passe nge r / e me r ge nc y phone s Se c ur ity c


slide-1
SLIDE 1

Central Florida Expressway Authority

1

slide-2
SLIDE 2

T itle VI

2

slide-3
SLIDE 3
  • 12 SunRail stations
  • 32 mile s
  • F

r e e par king at subur ban stations

  • Platfor

ms with c anopie s

  • Passe nge r

/ e me r ge nc y phone s

  • Se c ur

ity c ame r as

  • Var

iable me ssage signs

  • Audio announc e me nts
  • Bike r

ac ks

  • ADA- c ompliant r

amps

  • Dr

inking fountains

  • F

r e e tr ansfe r s to L YNX and Votr an

Pha se 1

slide-4
SLIDE 4
  • SunRa il c e le bra te s one ye a r of se rvic e
  • Ope ne d Ma y 1, 2014 – o n-time a nd o n-b udg e t
  • Ma y 1, 2015 “T

ha nk Yo u!” to the 1 millio n pa sse ng e rs who use d SunRa il in its ina ug ura l ye a r o f o pe ra tio ns

  • On b o a rd g ive a wa ys; ma na g e r ride s; sta tio n c e le b ra tio ns

4

Pro je c t Upda te

slide-5
SLIDE 5
  • Re ve nue Se r

vic e

  • F

re e Se rvic e Ma y 1-16

  • Ave ra g e d 11,237 pa sse ng e rs pe r da y!
  • Re ve nue Se rvic e b e g a n Ma y 19
  • Adde d la te -nig ht tra in De c . 22, 2014
  • 36 da ily tra ins
  • Co ntra c ting with munic ipa litie s fo r spe c ia l e ve nt

se rvic e

  • Ave ra g e da ily b o a rding s:

May: 4,075

June : 4,212

July: 4,127

August: 3,647

Se pte mbe r : 3,045

Oc tobe r : 3,214

Nove mbe r : 3,198

De c e mbe r : 3,629

Januar y: 3,789

F e br uar y: 3,561

Mar c h: 4,931

Apr il: 3,774

May: 3,636

June : 3,660

July: 3,904

August: 3,635

Se pte mbe r : 3,273

Oc tobe r : 3,397

5

Ride rship

slide-6
SLIDE 6

128,971 13% 33,840 3% 101,638 10% 96,781 9% 50,101 5% 145,570 14% 43,552 4% 63,093 6% 61,073 6% 88,121 9% 66,724 6% 140,961 14%

20,000 40,000 60,000 80,000 100,000 120,000 140,000 160,000 180,000 Sand Lake Road Orlando Health/Amtrak Church Street LYNX Central

  • Fla. Hosp./Health Village

Winter Park Maitland Altamonte Springs Longwood Lake Mary Sanford DeBary Total Boardings (May 1, 2014 - April 30, 2015) 6

Annua l Bo a rding s

slide-7
SLIDE 7
  • Grow Ride rship
  • Se rvic e mo dific a tio ns,

inc luding sc he dule re vie w

  • SunCa rds in re ta il o utle ts
  • Gr
  • w Re ve nue s
  • F

ib e r o ptic s

  • Adve rtising o ppo rtunitie s
  • Inc r

e ase last- mile c onne c tivity

  • Shuttle se rvic e s
  • Busine ss de ve lo pme nt
  • utre a c h

Pro je c t Upda te

Ne xt Ste ps – Pha se 1

7

slide-8
SLIDE 8

8

Pro je c t Upda te

Pha se 2 So uth

  • Phase 2 South
  • F

F GA c e re mo ny he ld Se pte mb e r 28, 2015 a t the K issimme e Amtra k Sta tio n

  • Ong o ing c o o rdina tio n with F

T A, F RA a nd lo c a ls o n sta tus o f g ra de c ro ssing sa fe ty impro ve me nts

  • Co nstruc tio n T

ime line

  • NT

P fo r Co rrido r/ Sta tio ns/ T ra c k – a ntic ipa te d De c . 2, 2015

  • NT

P fo r Wa yside Sig na ls – a ntic ipa te d Ma rc h 25, 2016

  • NT

P fo llo we d b y mo b iliza tio n a nd a c tua l c o nstruc tio n – a ntic ipa te d Q1 2016

  • Sub sta ntia l c o mple tio n o f c o nstruc tio n –

a ntic ipa te d Summe r 2017

  • Syste m inte g ra tio n te sting a nd punc hlist ite ms –

a ntic ipa te d Q3 2017

  • Ope n fo r re ve nue se rvic e – a ntic ipa te d Q4 2017
slide-9
SLIDE 9
  • Phase 2 Nor

th

  • E

xplo ring funding o ptio ns

  • Co o rdina ting with Amtra k o n
  • pe ra tio ns a t De L

a nd Sta tio n

  • Mo ving a he a d with 60%

de sig n pla ns

9

Pro je c t Upda te

Pha se 2 No rth

slide-10
SLIDE 10

10

Pro je c t Upda te

Pha se 3 to OI A

  • 5.5 mile e xte nsion with planne d

c onne c tion at OIA inte r modal fac ility Ongoing c oor dination with City of Or lando, GOAA and OUC

  • Moving for

war d with:

  • Pre limina ry Alig nme nt/ Co nc e pts
  • Ope ra ting Sc e na rio s
  • Pre limina ry Ride rship info rma tio n (pa sse ng e r a nd

e mplo ye e surve ys)

  • Submitte d to F

T A dr aft Class of Ac tion De te r mination – July 23rd

  • Ac c e pte d into Pr
  • je c t De ve lopme nt

Oc tobe r 26, 2015

slide-11
SLIDE 11
  • Ne xt Ste ps
  • NE

PA E va lua tio n

  • I

nc lude s a na lysis o f la nd use a nd zo ning ; e nviro nme nta l c o nse q ue nc e s; a ir q ua lity; no ise a nd vib ra tio n; we tla nds; c o nta mina tio n; tra nspo rta tio n impa c ts, e tc .

  • Se le c tio n o f a lo c a lly pre fe rre d a lte rna tive
  • Ado ptio n into L
  • ng Ra ng e T

ra nspo rta tio n pla n

  • Pre pa re c o st a na lyse s, ride rship e stima te s,
  • pe ra ting pla ns a nd de sig n c rite ria re q uire d fo r

Sma ll Sta rts Gra nt Applic a tio n

11

Pro je c t Upda te

Pha se 3 to OI A

slide-12
SLIDE 12
  • Pa sse ng e r Surve ys – July 2015
  • 1/ 3 re side nts; 2/ 3 no n-re side nts
  • 1/ 3 pe a k pe rio d; 2/ 3 o ff-pe a k
  • ~25 pe rc e nt o f a ir pa sse ng e rs surve ye d we re de stine d

fo r a re a s po te ntia lly se rve d b y SunRa il

  • 2016: 103,000 to ta l pa sse ng e rs
  • 2020: 126,000 to ta l pa sse ng e rs
  • 2030: 171,000 to ta l pa sse ng e rs
  • T
  • da y, 40% o f pa sse ng e rs a re se rve d b y re nta l c a rs;

23% b y shuttle s/ ta xis; 17% pa rk a t the a irpo rt; 15% a re dro ppe d o ff; le ss tha n 1% a re se rve d b y tra nsit.

12

Pro je c t Upda te

Pha se 3 to OI A

slide-13
SLIDE 13

F

  • llow us a t www.sunra il.c om

T witte r .c om/ Ride SunRail fac e book.c om/ Ride SunRail youtube .c om/ Ride SunRail flic kr .c om/ photos/ Ride SunR ail

13