Campus Master Plan - Church Conference 12/11/2012 Mission - - PowerPoint PPT Presentation

campus master plan church conference 12 11 2012 mission
SMART_READER_LITE
LIVE PREVIEW

Campus Master Plan - Church Conference 12/11/2012 Mission - - PowerPoint PPT Presentation

A Presentation for First United Methodist Church Cary, NC Campus Master Plan - Church Conference 12/11/2012 Mission Statement of the FUMC-Cary Long Range Planning Committee To discern, through prayer and the input of our congregation,


slide-1
SLIDE 1

A Presentation for First United Methodist Church

Cary, NC

Campus Master Plan - Church Conference 12/11/2012

slide-2
SLIDE 2

Mission Statement of the FUMC-Cary Long Range Planning Committee

  • To discern, through prayer and the input of our congregation,

God's plan for the future of our church

  • To envision, evaluate, and recommend the optimal facilities

solution to support His plan, particularly the missions and ministries of our church

  • To be responsible stewards of God’s gifts
  • To create and grow disciples of Jesus Christ
  • To respectfully and fairly include in our discovery and

deliberations, the views of all persons and groups having an interest in the future of FUMC-Cary

slide-3
SLIDE 3

Current Campus Master Plan

  • Completed in late 2004 in response to a request by the Admin Board for a

recommended plan of development for the then recently acquired South Campus

  • Comprised of six Phases which were anticipated to play out over a 12 – 15

year timeline

  • Phase 1: Expand Parking on South Campus (2006) – COMPLETE
  • Phase 2: Create Fellowship/Education Center (2008)
  • Phase 3: Expand Fellowship/Education Center (2011)
  • Phase 4: Renovate Existing Church Complex (2012)
  • Phase 5: Sanctuary and/or Education Expansion (2016)
  • Phase 6: Purchase additional property as available - COMPLETE
slide-4
SLIDE 4

Reasons for Reviewing Current Campus Master Plan

  • Acquisition of new acreage
  • Growing/Giving Expectations vs. Reality
  • Columbarium – Precise Best Location
  • Town of Cary – Downtown Revitalization Efforts
slide-5
SLIDE 5

What is a Campus Master Plan?

A “Diagram for Growth” that recognizes the present and future needs of a Congregation, both tangible and intangible, and presents them in a comprehensive format that relates budget and schedule. This is a PLAN for how the property could/should be developed in the future. This plan is not a request for approval to construct.

slide-6
SLIDE 6

Congregational Survey Results

Number of Surveys Returned:

334

slide-7
SLIDE 7

Summary of Survey Results

§ Stay on the current campus § Priority need is better Fellowship space § Secondary need is Education/Meeting space § Future need is expanded Sanctuary § Improve internal circulation § Better bathrooms § Respect the history of the church

slide-8
SLIDE 8

Master Plan Concepts

This plan is CONCEPTUAL. Our task was to consider the broad scope of facilities, not the intricate details of design.

slide-9
SLIDE 9

Master Plan Concepts

CURRENT SITE

slide-10
SLIDE 10
slide-11
SLIDE 11

Master Plan Concepts

Phase No. 1 MULTI-PURPOSE SPACE

slide-12
SLIDE 12
slide-13
SLIDE 13
slide-14
SLIDE 14
slide-15
SLIDE 15

Summary of FELLOWSHIP

§ High school basketball court § Seating for meals of 450 - 500 § Commercial kitchen § Locker rooms with showers § Seventeen (17) rooms (class, meeting, or other) § Café / lounge with terrace § Covered pick-up / drop-off § Improved playground § Possible parking

slide-16
SLIDE 16
slide-17
SLIDE 17
slide-18
SLIDE 18

Town of Cary Downtown Plans

slide-19
SLIDE 19

Master Plan Concepts

Phase No. 2 SANCTUARY and SUPPORT

slide-20
SLIDE 20
slide-21
SLIDE 21
slide-22
SLIDE 22

Summary of SANCTUARY and SUPPORT

§ Expanded Sanctuary for 800 § Expanded Chancel and Choir Area § Expanded Narthex and Welcome Lobby § Consolidated Administration Suite § New Choir Suite and Storage § Eleven (11) rooms (class, storage, other) § Improved Bathrooms § Improved Circulation and Elevator Access § New Chapel on the Upper Level

slide-23
SLIDE 23

Summary of MASTER PLAN PHASES

Phase No. 1 – FELLOWSHIP

  • Recreation Court
  • Commercial Kitchen
  • Locker rooms with showers
  • Seventeen (17) rooms to be configured as needed
  • Cabin and Columbarium

Phase No. 2 – SANCTUARY and SUPPORT

  • Expanded Sanctuary for 800
  • Expanded narthex and Welcome Entrance
  • Administration and Choir Suites
  • Improved Bathrooms
  • Clearer Circulation and Access
slide-24
SLIDE 24

Budget

slide-25
SLIDE 25

Budget

slide-26
SLIDE 26

Budget

slide-27
SLIDE 27

Budget

slide-28
SLIDE 28

Questions and Answers