SLIDE 1
Bridge Replacement SR 1002, Section 450 White Township Indiana - - PowerPoint PPT Presentation
Bridge Replacement SR 1002, Section 450 White Township Indiana - - PowerPoint PPT Presentation
PENNDOT PROJECT INFORMATION Ramsey Run Bridge #1 Bridge Replacement SR 1002, Section 450 White Township Indiana County PROJECT TEAM Design Unit: Direct Questions to Kurt J. Kretchman, P.E., Design Project Manager at 724.357.4804 or
SLIDE 2
SLIDE 3
PURPOSE OF PRESENTATION & PROJECT INTRODUCTION ▪ The purpose of this presentation is to introduce the public to the project and gather feedback from the public. ▪ The purpose of the project is to provide a safe and reliable crossing of SR 1002 over Ramsey Run in White Township, Indiana County.
SLIDE 4
PROJECT LOCATION
Project Location
SLIDE 5
PROPOSED PROJECT IMPROVEMENTS ▪ Replace the existing structure with a concrete box culvert. ▪ Minor approach roadway paving to tie into the new structure. ▪ Guiderail, signing and pavement marking updates. ▪ Minor Right-of-Way will be acquired at the structure location. ▪ Construction anticipated to begin and end in 2022. ▪ Project cost estimate: $1,000,000.
SLIDE 6
PROPOSED DETOUR
SLIDE 7
PRELIMINARY PLAN
SLIDE 8
PRELIMINARY STRUCTURE
SLIDE 9
NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) Public outreach begins with PennDOT Connects and extends into the National Environmental Policy Act (NEPA) process:
▪ NEPA requires agencies to integrate environmental values into their decision-making processes by considering the environmental impacts
- f their proposed actions and
reasonable alternatives to those actions. ▪ NEPA includes public involvement activities and gathering feedback from the public.
SLIDE 10