BRIDGE CHRIS SHIELDS - JUNE 2016 THE LOCATION 2 IPWEAQ CQ BRANCH - - PowerPoint PPT Presentation

MOORES CREEK TRUNK SEWER BRIDGE CHRIS SHIELDS - JUNE 2016 THE LOCATION 2 IPWEAQ CQ BRANCH CONFERENCE THE LOCATION 3 IPWEAQ CQ BRANCH CONFERENCE THE NEED 4 IPWEAQ CQ BRANCH CONFERENCE THE NEED 5 IPWEAQ CQ BRANCH CONFERENCE THE NEED 6


slide-1
SLIDE 1

MOORES CREEK TRUNK SEWER BRIDGE

CHRIS SHIELDS - JUNE 2016

slide-2
SLIDE 2

IPWEAQ CQ BRANCH CONFERENCE 2

THE LOCATION

slide-3
SLIDE 3

IPWEAQ CQ BRANCH CONFERENCE 3

THE LOCATION

slide-4
SLIDE 4

IPWEAQ CQ BRANCH CONFERENCE 4

THE NEED

slide-5
SLIDE 5

IPWEAQ CQ BRANCH CONFERENCE 5

THE NEED

slide-6
SLIDE 6

IPWEAQ CQ BRANCH CONFERENCE 6

THE NEED

slide-7
SLIDE 7
  • More robust replacement – not like for like
  • Minimal impact on tidal area
  • Close consideration of constructability (fabricate / transport / erect)
  • Safety in Design for the whole life-cycle
  • All pointed to a box girder truss bridge

IPWEAQ CQ BRANCH CONFERENCE 7

THE APPROACH

slide-8
SLIDE 8
  • Tides & the elements (corrosion protection)
  • High flowrate / velocities in storm conditions
  • Floating debris impact & debris mat loading
  • Thermal expansion of truss elements (fixed / roller) & PE pipe
  • Pipe material selection & connections
  • Abutment load bearing and overturning considerations
  • Crane outrigger loading
  • Vandalism prevention / safety
  • Satisfying Council / DILGP / Aurizon requirements
  • Constructability (civil & structural)

IPWEAQ CQ BRANCH CONFERENCE 8

THE DESIGN CHALLENGES

slide-9
SLIDE 9

IPWEAQ CQ BRANCH CONFERENCE 9

THE DESIGN

slide-10
SLIDE 10

IPWEAQ CQ BRANCH CONFERENCE 10

THE DESIGN

slide-11
SLIDE 11

IPWEAQ CQ BRANCH CONFERENCE 11

THE DESIGN

slide-12
SLIDE 12
  • Access (tides)
  • Asbestos removal & alteration
  • Crocs
  • Coordination with nearby levee works
  • Acid Sulphate Soils
  • Abutment bolt assembly location
  • Raw sewage (especially when the bungs let go!)
  • Crane selection & the lift

IPWEAQ CQ BRANCH CONFERENCE 12

THE CONSTRUCTION CHALLENGES

slide-13
SLIDE 13

IPWEAQ CQ BRANCH CONFERENCE 13

THE CONSTRUCTION

slide-14
SLIDE 14

IPWEAQ CQ BRANCH CONFERENCE 14

THE CONSTRUCTION

slide-15
SLIDE 15

IPWEAQ CQ BRANCH CONFERENCE 15

THE CONSTRUCTION

slide-16
SLIDE 16

IPWEAQ CQ BRANCH CONFERENCE 16

THE CONSTRUCTION

slide-17
SLIDE 17

IPWEAQ CQ BRANCH CONFERENCE 17

THE CONSTRUCTION

slide-18
SLIDE 18

IPWEAQ CQ BRANCH CONFERENCE 18

THE CONSTRUCTION

slide-19
SLIDE 19

IPWEAQ CQ BRANCH CONFERENCE 19

THE CONSTRUCTION

slide-20
SLIDE 20

IPWEAQ CQ BRANCH CONFERENCE 20

THE CONSTRUCTION

slide-21
SLIDE 21
  • Thinking outside the box early
  • Making constructability & SiD top priority
  • Working collaboratively between Council, Consultants & Contractor

IPWEAQ CQ BRANCH CONFERENCE 21

THE SECRET TO SUCCESS

slide-22
SLIDE 22

IPWEAQ CQ BRANCH CONFERENCE 22