BRADLEY SURFACE MINE LIAISON COMMITTEE PRESENTATION 24 February - - PowerPoint PPT Presentation

bradley surface mine
SMART_READER_LITE
LIVE PREVIEW

BRADLEY SURFACE MINE LIAISON COMMITTEE PRESENTATION 24 February - - PowerPoint PPT Presentation

BRADLEY SURFACE MINE LIAISON COMMITTEE PRESENTATION 24 February 2020 Our Blessed Lady and St Joseph Church Continuous Air Quality Monitoring Nov 17 th to Feb 23 rd - 24 hour mean values Moisture due to early morning fog from 03:00hrs to


slide-1
SLIDE 1

BRADLEY SURFACE MINE LIAISON COMMITTEE PRESENTATION

24 February 2020

slide-2
SLIDE 2

Our Blessed Lady and St Joseph Church Continuous Air Quality Monitoring Nov 17th to Feb 23rd - 24 hour mean values

2

Moisture due to early morning fog from 03:00hrs to 12:00hrs, S/NW wind direction, very little breeze

slide-3
SLIDE 3

10 20 30 40 50 60 70 80 90 100 17/11/2019 00:00:00 27/11/2019 00:00:00 07/12/2019 00:00:00 17/12/2019 00:00:00 27/12/2019 00:00:00 06/01/2020 00:00:00 16/01/2020 00:00:00 26/01/2020 00:00:00 05/02/2020 00:00:00 15/02/2020 00:00:00

Graph

Total particles (ug/m^3) PM10 particles (ug/m^3) PM2.5 particles (ug/m^3) PM1 particles (ug/m^3)

Douglas Terrace Continuous Air Quality Monitoring Nov 17th to Feb 23rd - 24 hour mean values

3

slide-4
SLIDE 4

4

Pont Road Continuous Air Quality Monitoring Nov 17th to Feb 23rd - 24 hour mean values

Moisture due to early morning fog from 02:00hrs to 13:00hrs, S/NW wind direction, very little breeze Moisture due to early morning fog 01:00hrs to 07:00hrs, SW wind direction Very little breeze

slide-5
SLIDE 5

50 100 150 200 250 300 350 400 450 500 17/11/2019 00:00:00 27/11/2019 00:00:00 07/12/2019 00:00:00 17/12/2019 00:00:00 27/12/2019 00:00:00 06/01/2020 00:00:00 16/01/2020 00:00:00 26/01/2020 00:00:00 05/02/2020 00:00:00 15/02/2020 00:00:00

Graph

Total particles (ug/m^3) PM10 particles (ug/m^3) PM2.5 particles (ug/m^3) PM1 particles (ug/m^3)

Moisture due to early morning fog from 02:00hrs to 12:00hrs, S/NW wind direction, very little breeze

5

Low Bradley Continuous Air Quality Monitoring Nov 27th to Feb 23rd - 24 hour mean values

slide-6
SLIDE 6

Noise Monitoring Brooms Farm

6

DATE TIME TOTAL AMBIENT SOUND LEVEL LAeq dB NORMAL OPERATIONS LAeq dB PLANNING LIMIT NORMAL OPS LAeq dB PLANNING LIMIT TEMPORARY OPS LAeq dB COMMENTS 18/11/2019 14:16 61.4 52 55 70 Road traffic dominant noise source. Site audible at times in few breaks in traffic 11/12/2019 14:27 61.4 55 70 Total ambient noise, road traffic dominant noise source. Site operations not audible 17/01/2020 14:30 63 55 70 Total ambient noise, road traffic dominant noise source. Site operations not audible 05/02/2020 15:05 60.6 55 70 Total ambient noise, road traffic dominant noise source. Site operations not audible

slide-7
SLIDE 7

Ambient Noise Monitoring at Pont Road

7

DATE TIME TOTAL AMBIENT SOUND LEVEL LAeq dB NORMAL OPERATIONS LAeq dB PLANNING LIMIT NORMAL OPS LAeq dB PLANNING LIMIT TEMPORARY OPS LAeq dB COMMENTS 18/11/2019 13:35 65 55 70 Road traffic main noise source, aircraft. Site operations not audible 11/12/2019 10:16 63.9 55 70 Road traffic main noise source. Site operations not audible 23/01/2020 13:00 62.6 55 70 Road traffic main noise source. Site operations not audible 06/02/2020 09:34 65.8 55 70 Road traffic main noise source. Site operations not audible

slide-8
SLIDE 8

Ambient Noise Monitoring at Douglas Terrace

8

DATE TIME MONITORING DURATION TOTAL AMBIENT SOUND LEVEL LAeq dB NORMAL OPERATIONS LAeq dB TEMPORARY OPERATIONS LAeq dB PLANNING LIMIT NORMAL OPS LAeq dB PLANNING LIMIT TEMPORARY OPS LAeq dB NOTES 18/11/2019 14:50 01:00:01 Bttm of bank 48.2 50 70 Total ambient sound level including road traffic noise. Site audible 11/12/2019 15:20 01:00:02 Bttm of bank 55 48.9 50 70 Road traffic noise, dog barking, conversation. Site audible - dozer tracks & engine, clunk of bucket or skip at times. 23/01/2020 11:14 01:00:02 Bttm of bank 47.3 50 70 Total ambient sound level including aircraft. Site audible - dozer tracks, engines & occasional bucket of material into dump truck 05/02/2020 13:47 01:00:12 Bttm of bank 48.3 50 70 Total ambient sound level including aircraft, siren, birdsong . Site audible - dozer tracks & engines

slide-9
SLIDE 9

Ambient Noise Monitoring Our Blessed Lady and St Joseph Church *

9

DATE TIME TOTAL AMBIENT SOUND LEVEL LAeq dB NORMAL OPERATIONS LAeq dB COMMENTS 18/11/2019 13.55 53 Total ambient noise, mainly road traffic noise. Site audible in gaps of traffic at times - <50dBA 11/12/2019 09:26 50.1 Total ambient noise, mainly road traffic. Site not audible 17/01/2020 14:10 55.9 Total ambient noise, mainly road traffic. Site not audible 06/02/2020 09:12 55.6 Total ambient noise, mainly road traffic. Site not audible

slide-10
SLIDE 10

Low Bradley Ambient Sound Levels *

10

DATE TIME TOTAL AMBIENT SOUND LEVEL LAeq dB NORMAL OPERATIONS LAeq dB COMMENTS 18/11/2019 13:13 46.1 Total ambient sound levels including resident activity. Site operations are audible 11/12/2019 09:52 48.8 Total ambient noise level. Birdsong, sheep bleating, dogs barking. Site operations audible. 17/01/2020 11:30 57.5 Total ambient sound level including tractor working in farm yard. Site operations are audible 06/02/2020 10:20 48.4 Total ambient sound level including farm traffic. Site operations are audible

slide-11
SLIDE 11

Blasting operations:

2 4 6 8 10 12 14

BRADLEY PPV (MM/S) RESULTS

Brooms Farm Douglas Terr Pont Road 95%<6mm/s All <12 mm/s

slide-12
SLIDE 12

Complaints:

1 x Blasting 1 x Coal stocks

12

slide-13
SLIDE 13

SITE PROGRESS

13

slide-14
SLIDE 14

PROGRESS OF SITE OPERATIONS

  • Area B now advanced to cut 6 (cut 18).
  • Extraction of Top Brass Thill, Bottom Brass Thill and Hutton seams.
  • Main overburden mound near completion then advancing through Area

B at restoration level.

slide-15
SLIDE 15

Area B main overburden mound and cut 6

15

slide-16
SLIDE 16

Operations in Area B including Hutton extraction

16

Box cut now complete and now advancing cut 3. Soil stripping continuing through September.

slide-17
SLIDE 17

HIGHWAYS UPDATE

Steven Hanlon Transport Manager

slide-18
SLIDE 18

5 4 3 5 4 5 3 0 0 0 12 14141514 5 1313 24 15 4 5 6 4 4 0 0 0 0 0 0 0 0 0 0 0 0 0 6 4 9 13 24 35 31 19 2627 19 8 44 24 31 33 36 47 49 57 19 8 44 24 31 10 20 30 40 50 60 70 WC 18/11/19 WC 25/11/19 WC 2/12/19 WC 09/12/201 9 WC 16/12/19 WC 23/12/19 WC 30/12/19 WC 6/1/20 WC 13/1/20 WC 20/1/20 WC 27/1/20 WC 3/2/20

  • NO. OF HGV MOVEMENTS

HGV Movements (Monday to Friday)

Daily Total 4 Week Average (Actual) 4 Week Average (Planning Permission)

slide-19
SLIDE 19

2 4 6 8 10 12 14 16 23/11/2019 30/11/2019 07/12/2019 14/12/2019 21/12/2019 28/12/2019 04/01/2020 11/01/2020 18/01/2020 25/01/2020 01/02/2020 08/02/2020

  • NO. OF HGV MOVEMENTS

HGV Movements (Saturdays)

Daily Total 4 Week Average (Actual) 4 Week Average (Planning Permission)

slide-20
SLIDE 20

23/1/20 between 1640 hrs and 1710 hours – Two HGVs returning to Bradley were required to follow Police diversion due to issue on A693.

slide-21
SLIDE 21

Traffic Data Analysis

Range - 17th August 2018 to 9th February 2020

  • Total HGV Movements (In & Out) 17,666 (16,710 - Coal & 956 - Other)
  • Distance covered on approved route – 194,326 Miles
  • Despatched Coal – circa. 233,940 tonnes
  • No. of road traffic accidents – Zero
  • DVSA Enforcements - Zero
  • No of issues raised - Zero