Boston Logan Runway 9/27 Safety Rehabilitation
May 7, 2020
M a s s a c h u s e t t s P
- r
t A u t h
- r
Boston Logan Runway 9/27 Safety t u A t r Rehabilitation o P - - PowerPoint PPT Presentation
y t i r o h Boston Logan Runway 9/27 Safety t u A t r Rehabilitation o P s t t e s u h c a s s a M May 7, 2020 Logans Runway 9/27 will be temporarily closed for major maintenance y t i r o h t u A t r o
May 7, 2020
2
NW
3
higher altitudes, North/South Shore communities
End, Roxbury, JP, Hyde Park, Roslindale and Milton
4
R9 R27
weathering, improve drainage and install new LED edge and centerline lights
summer travel period- the current, significant drop in flight operations has provided an opportunity to avoid major operational disruptions
when flights return
5
6
R 22s
Boston, Revere, Lynn, Nahant
South Boston, Hull R 33L
points west R 4s
Milton, and South Shore
East Boston, Revere, Lynn, Nahant
Runway Use May June July
Runway
Arr Dep Arr Dep Arr Dep 9 46% 36% 32% 27 10% 9% 17% 8% 15% 8% 4s 53% 5% 43% 4% 37% 5% 22s 25% 27% 28% 27% 37% 38% 33L, 32 11% 9% 12% 17% 11% 12% Total 99% 96% 100% 92% 100% 95%
1,100 300
Pre COVID Current
7
PAVEMENT – Widespread cracking, weathering, raveling and rutting of surface PONDING – Drainage issues on and alongside runway
8
conduit system
standard geometry
9
construction for any questions or comments:
10