SLIDE 1
Phase 1 Q Runway 18/ 36 Open Q Runway 28 ILS Available 25 Calendar - - PowerPoint PPT Presentation
Phase 1 Q Runway 18/ 36 Open Q Runway 28 ILS Available 25 Calendar - - PowerPoint PPT Presentation
Q Runway 10/ 28 Open Q Runway 10/ 28 Lights - Available Phase 1 Q Runway 18/ 36 Open Q Runway 28 ILS Available 25 Calendar Days Q Runway 10 VASI Available 8/ 5 8/ 30/ 17 RUNWAY CONDUIT\ CANS [ NIGHT WORK 90 M IN. PPR NOTAM ]
SLIDE 2
SLIDE 3
Phase 3
10 Calendar Days 9/ 4-9/ 14/ 17
RUNWAY 10-28 TEM PORARY THRESHOLD M ARKING AND LIGHTS (6,008’ X 150’) CONSTRUCT BLAST P AD, M ALSR THRESHOLD AND FOUNDATIONS, RSA GRADING EXTEND TAXIWAY G EXTEND TAXIWAY D VASIs OTS
Q Runway 10/ 28 – OPEN 6008’ Q Runway 10/ 28 Lights - Available Q Runway 18/ 36 – Open Q Runway 28 ILS – EST
. OTS 9/ 7
Q Runway 10 VASI – OTS
SLIDE 4
RUNWAY 18-36 CLOSED 2300-0600 HOURS INSTALL P API FOUNDATIONS (OUTSIDE RWY 18/ 36 RSA) TAXIWAY C CLOSED DAYTIM E BACK TAXI ON RUNWAY 18/ 36 CONSTRUCT P AVED SHOULDERS W/ IN RUNWAY 18/ 36 RSA [NIGHT WORK 90 M IN.PPR NOTAM ] RUNWAY 10-28 CLOSED RESURFACING 5,000’, RECONSTRUCTION OF 800’ P AVEM ENT , NEW DISTANCE REM AINING SIGNS, NEW EDGE LIGHTING SYSTEM
Phase 4
1.5 Calendar Days 9/ 15-9/ 16/ 17
Q Runway 10/ 28 – CLOSED Q Runway 10/ 28 Lights - OTS Q Runway 18/ 36 – Open Daytime Q Runway 28 ILS – OTS Q Runway 10 VASI – OTS
SLIDE 5
INSTALL P API [NIGHT WORK] RUNWAY 18-36 CLOSED 2300-0600 HOURS EST . 2 NIGHTS CONSTRUCT PAVED SHOULDERS WITHIN RSA OF BOTH RUNWAYS [NIGHT WORK] CONSTRUCT 115’ EXTENSION RUNWAY 10-28 RESURFACING 5,000’, RECONSTRUCTION OF 800’ P AVEM ENT , RESURF ACE SHOULDERS, NEW DISTANCE REM AINING SIGNS, NEW EDGE LIGHTING SYSTEM , TEM PORARY M ARKINGS
Phase 5
14 Calendar Days 9/ 15-9/ 29/ 17
Q Runway 10/ 28 – CLOSED Q Runway 10/ 28 Lights - OTS Q Runway 18/ 36 – Open Q Runway 28 ILS – OTS Q Runway 10 VASI – OTS
SLIDE 6
PAVEM ENT CURING
(~20 Days After Paving) 9/ 27-10/ 17/ 17
RUNWAY 10-28 NO RUNWAY GROOVING OR POROUS FRICTION COURSE
Q Runway 10/ 28 – Open Q Runway 10/ 28 Lights - Available Q Runway 18/ 36 – Open Q Runway 28 ILS – Available Q Runway 10 PAPI – Available
ILS FLIGHT CHECK
- EST. 9/ 29/ 17
P API FLIGHT CHECK
- EST. 9/ 29/ 17
SLIDE 7
Phase 6
16 Calendar Days (~20 Days After Paving) 10/ 17-11/ 2/ 17
GROOVE & P AINT RUNWAY 10-28 (~20 DAYS AFTER P AVING) RUNWAY 10-28 CLOSED 2300-0600 HOURS 90 M INUTE PPR
Q Runway 10/ 28 – DAYTIM E Q Runway 10/ 28 Lights - Available Q Runway 18/ 36 – Open Q Runway 28 ILS – Available Q Runway 10 P
API – Available
SLIDE 8
Phase 7
10 Calendar Days 9/ 13-9/ 23/ 17
REM OVE TEM PORARY FENCE AND COM PLETE PERIM ETER ROAD WORK
Q Runway 10/ 28 – Open Q Runway 10/ 28 Lights - Available Q Runway 18/ 36 – Open Q Runway 28 ILS – Available Q Runway 10 P
API – Available
SLIDE 9
Phase 8
21 Calendar Days 9/ 29-10/ 20/ 17
CONSTRUCT M ALSR SYSTEM AND SERVICE ROAD CONSTRUCT PRIVACY FENCE
Q Runway 10/ 28 – Open Q Runway 10/ 28 Lights - Available Q Runway 18/ 36 – Open Q Runway 28 ILS – Available Q Runway 10 P
API – Available
SLIDE 10
POST CONSTRUCTION
Q Approach Published
(1 M i.+ M inimums) Dec 2017
Q M ALSR Operational
Early 2018 – Pending Tree Clearing
Q Approach Amendment
(3/ 4 M i. M inimums) M arch 2018
Q Runway 10/ 28 – Open Q Runway 10/ 28 Lights - Available Q Runway 18/ 36 – Open Q Runway 28 ILS – Available Q Runway 10 P
API – Available
00000 00000 00000 00000 00000 00000 00000 00000 00000 000000000