  2. MEASURE E - PLANNING MEASURE E - PLANNING 3/15/17 Bond Sa Sales Ø On February 14, 2017, Bond sales were completed for Measure E ($300 million) and Measure K ($150 million) Ø Favorable interest rates Ø Sold before most districts with new bond programs 2 Long Beach Unified School District

  3. MEASURE E - PLANNING MEASURE E - PLANNING 3/15/17 Ci Citizens’ Bond Oversight Co Commi mmittee Ø December 20, 2016 - the Board approved COC Bylaws to allow oversight over expenditures of the Measure E and K Bond Program Ø January 19, 2016 - meeting to review preliminary planning and implementation of Measure E 3 Long Beach Unified School District

  4. MEASURE E - PLANNING MEASURE E - PLANNING 3/15/17 Planning Act ctivities Ø December 8, 2016 – RFQ released for Architectural Services Ø 50 proposals received on January 18, 2017 Ø Architectural Agreements anticipated April 2017 Ø March 6, 2017 – RFQ released for Lease Lease-Back Construction Services Ø Proposals due March 28, 2017 Ø Agreements anticipated May 2017 3 Long Beach Unified School District

  5. MEASURE E - PLANNING MEASURE E - PLANNING 3/15/17 (Revised) Phasing Plan (Revised) Phasing Plan Planning Proce cess (Co Continuous) Phase 3 Phase 3 Phase 2 Phase 2 Phase 1 Phase 1 To Begin Su Summe mmer 2019 To Begin Su Summe mmer 2018 To Begin Su Summe mmer 2017 (or sooner) (or sooner) (or sooner) (or sooner) • Cl Cleveland – – HVAC C • Barton – – HVAC C • Ca Cabrillo – – Track ck & Field • Garfi field – – HVAC C • Bixb xby – – HVAC C • Poly – – Track ck & Field • Jeffe ferson – – HVAC C • Burch cham m – – HVAC C • Wilson – – Track ck & Field • Kettering – – HVAC C • Longfe fellow – – HVAC C • Kettering – – Interim m Housing • Lindsey – – HVAC C • Lowell – – HVAC C • McK cKinley – – Interim m Housing • Lake kewood – – HVAC C • MacA cArthur – – HVAC C • Monroe – – Interim m Housing • McK cKinley – – HVAC C • Mann – – HVAC C • Riley – – Interim m Housing • Riley – – HVAC C • St Stanfo ford – – HVAC C • Webster – – Interim m Housing • Rogers – – HVAC C • Washington – – HVAC C • St Stephens – – HVAC C • Webster – – HVAC C • Millika kan – – New 1000 Bldg Bldg • Wilson – – HVAC * Changes from initial plan Ø *Muir – – HVAC C (2020) 4 Long Beach Unified School District

  6. MEASURE E - PLANNING MEASURE E - PLANNING 3/15/17 Ch Changes to Initial Phasing • Garfi field – – 3 rd rd , 4 , 4 th th & 5 & 5 th th grades grades mo moving to Webster - - 2018 2018 • Jeffe ferson – – All Grades mo moving to Butler - - 2018 • Rogers – – 8th Grade Only mo moving to Browning - - 2018 • Lowell – – Sh Sharing cl classrooms ms with Rogers - - 2019 • Webster – – Using on site interim m housing – – 2019 • Muir K-8 -8 – – 6 th th , 7 , 7 th th & 8 & 8 th th Grade to St Stephens 2020 • 3 3 rd rd , 4 , 4 th th & 5 & 5 th th Grades to W Grades to Webster 2020 ebster 2020 5 Long Beach Unified School District

  7. MEASURE E - PLANNING MEASURE E - PLANNING 3/15/17 Ar Areas eas Addr Addres essed ed Ø HVAC System Installation Ø Utility Upgrades Ø ADA – Accessibility Upgrades Ø Elevators Ø Fire Alarm Upgrades Ø Intercom, Clocks, Speakers (Measure K) Ø Overhead Projectors Ø Ceiling Repair Ø Interior Lights Ø Exterior Paint at selected sites Ø Other State Funded Repairs Ø Potential for $300M in matching funds 6 Long Beach Unified School District

  8. MEASURE E - PLANNING MEASURE E - PLANNING 3/15/17 Interim m Housing Preparations Ø New Portable Classrooms (As Needed) Ø Site Re-Configuration Ø Site Modifications Ø “Outfitting” of Sites Examples Ø Testing devices and instructional materials Ø Additional administration 7 Long Beach Unified School District

  9. MEASURE E - PLANNING MEASURE E - PLANNING 3/15/17 Track ck and Field Upgrades Ø New Synthetic/All-Weather Field Ø New Synthetic Running Track Ø Bleacher/Stadium Upgrades or Replacement Ø ADA Upgrades Ø Lighting Upgrade or Installation 8 Long Beach Unified School District

  10. MEASURE E - PLANNING MEASURE E - PLANNING 3/15/17 Next xt St Steps • Communication and coordination with affected sites (continuous) • Architects and Engineers RFP – Final Selection interviews ongoing – Prequalified list and design contracts - April • Lease Lease-Back Contractor Selections • Develop and submit plans to Division of State Architect • Construction Contracts (Constructability Reviews) • Community and stakeholder collaboration 9 Long Beach Unified School District

  11. Q & A Q & A Ema mail : LBsch choolbonds@lbsch chools.net Website: LBsch choolbonds.net Sch School Bond Offi fice ce (562) 997-7 -7550

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.