based on Q1 Results 2014 PT SARANA KARYA Golden Steps to The Best - - PowerPoint PPT Presentation

based on q1 results 2014
SMART_READER_LITE
LIVE PREVIEW

based on Q1 Results 2014 PT SARANA KARYA Golden Steps to The Best - - PowerPoint PPT Presentation

Investor Relations Update for Analysts and Investors based on Q1 Results 2014 PT SARANA KARYA Golden Steps to The Best VISION To be One of The Best Integrated EPC and Investment Company in South East Asia MISSION Providing Excellent


slide-1
SLIDE 1

Golden Steps to The Best

Investor Relations’ Update for Analysts and Investors

based on Q1 Results 2014

PT SARANA KARYA

slide-2
SLIDE 2

Golden Steps to The Best

VISION

To be One of The Best Integrated EPC and Investment Company in South East Asia

MISSION

Providing Excellent Integrated Product and Services on EPC and Investment for Infrastructure, High-Rise Building, Energy, Industrial Plant, Precast Industry & Property Accomplish Key Stakeholders Expectation Practicing Business Ethics to Promote Good Corporate Citizen and Company Sustainability Strategic Overseas Expansion Implementing “Best Practice” Integrated Management System

2

slide-3
SLIDE 3

3

WIKA’S BUSINESS PORTFOLIO

INDUSTRY INFRASTRUCTURE & BUILDING ENERGY & INDUSTRIAL PLANT REALTY & PROPERTY INVESTMENT Precast Concrete :

  • Precast Concrete Product
  • Natural Resources

Management

Industrial Facilities :

  • Steel Fabrication
  • Aluminium Casting
  • Plastic Injection

Bitumen :

  • Granular Asphalt
  • Extraction Asphalt

Civil Construction :

  • Road and Bridge
  • Seaport, Jetty
  • Dam & Barrage

Building Construction :

  • Residential & Commercial
  • Airport
  • Facility

Steel Construction :

  • Erection
  • Equipment Installation

EPC :

  • Oil and Gas Plant
  • Petrochemical Plant
  • Cement Plant, Power Plant
  • Mining, Biofuels, Fertilizer

Operation & Maintenance :

  • Power Plant
  • Industrial Equipment

Realty & Property :

  • Landed House
  • Highrise (Apartment,

Condotel, Office Mixed Use)

  • Industrial Estate

Property Management Energy Water & Environment Transportation Infrastructure

Civil Work Department Regional Department Overseas Department Building Department Industrial Plant Department Power Construction Department Power Investment Department Building Department Power Investment Department

SERVICES/PRODUCTS

DEPARTMENT, SUBSIDIARIES, ASSOCIATES

PT SARANA KARYA

slide-4
SLIDE 4

Golden Steps to The Best

Jakarta MRT Underground and Elevated Section Design and built for civil work including 8 elevated stations and 13 Underground Stations Estimated Time of Completion 2018

Located in Jatigede district, West Java. With height more than 100m and 980 cubic mtr capacity, planned to have function to irrigate 90.000 acre area, providing fresh water for society .

INFRASTRUCTURE & BUILDING

Civil Construction

4

slide-5
SLIDE 5

Golden Steps to The Best

15 November 2013 The New Ngurah Rai International Airport was finished and handover to Angkasa Pura I. Terminal 3 Extension Soekarno-Hatta Airport , Jakarta Design and Built, including 380.000sqm showpieces facility and new 25mppa terminal, open for business in late 2015 5

INFRASTRUCTURE & BUILDING

Building Construction

slide-6
SLIDE 6

Golden Steps to The Best

WIKA’s 1st EPC of Coal Fired Power Plant Amurang 2 X 25 MW, North Sulawesi, WIKA become the pioneer

  • f local company to finished EPC power plant outside

Java Installation of Sucker Rod Oil Pump, located at NDD 13, Duri Pekanbaru 6

ENERGY & INDUSTRIAL PLANT

EPC

slide-7
SLIDE 7

Golden Steps to The Best

Operation & Maintenance Diesel Engine PP Bali 3X18 MW Operation & Maintenance Diesel Engine PP Bali 3X18 MW 7

ENERGY & INDUSTRIAL PLANT

Operating & Maintenance

slide-8
SLIDE 8

Golden Steps to The Best Bogor Plant - The biggest plant with 8 line of production, produce piles and poles precast Bogor Plant - The biggest plant with 8 line of production, produce piles and poles precast produce piles and poles precast

Operational Area

8

INDUSTRY

Beton Precast

slide-9
SLIDE 9

Golden Steps to The Best Clinker and Cement Additives Transport System Steel Fabrication 9

INDUSTRY

Industrial Facilities

slide-10
SLIDE 10

Golden Steps to The Best ASPHALT MINING ASPHALT MINING 10

INDUSTRY

Bitumen

slide-11
SLIDE 11

Golden Steps to The Best

  • NOR

T H S UMA T E R A E AS TKAL I MANT AN S UL A WE S I WE S T J A V A & B ANT E N J AKAR T A C E NT R AL J A V A E AS T J A V A B AL I

Land Bank (as of September 2013) Landed House: 1.580.760 m2 High rise: 25.297 m2

  • included JO
  • NOR

T H S UMA T E R A

De

b a gT a T a T a T a T a a T a T a a ma n m s a r i

  • Me

d a n L a L a L a L a L a L a n d e n d h d h h

  • u

s

  • u

s

  • u

s

  • u

s

  • u

s

  • u

s

  • u

s u

  • e

: 1 1 . 7 5 4 7 5 7 5 7 5 7 5 7 m2

T

a n a h a h a h a h a h hAc Ac A e h e h

  • A

Ac e c e c e c Ac L a L a L a L a L a L a L a L a a n d e n d e n d e n d e n d e n d e n d e d e d e e d d d d h d h h d d h d d h h

  • u

s

  • e

: 8 7 8 8 7 8 7 8 7 8 7 8 8 7 8 7 8 7 m2 m2 m2 m2 m2 m2 m2 m2 m2 m s e : 8

E AS TKAL I MANT AN

T

a ma n ma s a r i B u k i t Mu t i a r a

  • B

a l B a l a l a l a l a l a l a l a l i k p i k p i k k i k p i k p a p a a p a a p a a p a a p a a n L a n d e d e d e d e d e e d h

  • u

s e : 1 9 . 5 4 3m2 2

G

r a n dT a T a T ma n s a r i

  • S

a S a S a S a S a S a S a S ma r ma r ma r ma r ma m i n d a L a n d e d h h

  • u

s

  • u e

: 7 7 7 7 7 7 7 7 7 . 5 7 8 m2

S UL A WE S I

T

a T a ma n s a r i Me t r

  • p
  • l

i t a n a n

  • M
  • Ma

n a a n n a n d

  • d
  • L

a n d e d h

  • u

s e : 2 7 . 4 4 4m2 2 m2 m

T

h e L a g

  • n

T a ma n s a r r i Ap p A a r t r t me me n t t Hi g h r i s e : 2 . 4 8 8 m2 2

At

At a n a n g n g n g gMa Ma M k a s k a s s a r s a r- Ma k a k Ma k k Ma k Ma k Ma k k Ma k k Ma k Ma k a a s a s a r r L a L a a L a L a a L a a n d n d n d n d n d e d n e d d h dh h d h d h d h

  • u

s

  • u

s u s u s s u s e : e : e 1 5 1 5 5 . 1 56 9 5 9 5 6 9 5 6 9 6 9 9 5 5 9 6 9 m2 e : : e : e : e : e : e 1 5 1 5 1 5 5 1 5 1 5 1 5 1

T

a T a T a T a T a T a T a a ma n ma n n s a r r i K i K i K Ka y a y a a y g a n g a n

  • n
  • Ke

Ke n d d a r i r i r i r i i r i r i a y a y a a y y a y a a y a a y a a y a y a n g n g n g L a L a L a a L a n d e n d h dh h d h d dh

  • u

s

  • u

s

  • u

s

  • u

s

  • u

s

  • u

s

  • u

s s

  • u
  • u e

: e : e : e : e : e : : e : e 4 2 4 2 4 . 4 . 4 1 m2

WE S T J A V A & B ANT E N

T

a ma n s a r i Ma g l a y a n g R e g e n c y

  • B

a n d u n g n g g L a n d e d h

  • u

s e d : 8 8 . 1 8 3 m2 L a n d e dh

  • u

s e d : 8 8 8 . 1 8 3m2

T

a ma n s a r i P u r i B a l i

  • De

p

  • k

L a n d e d h

  • u

s e : 1 9 . 1 5 2 m2

T

a ma n s a r i P e l a b u h a n r a t u

  • S

u k a b u mi L a n d e d h

  • u

s e : 2 4 2 . 3 3 8 m2

T

a ma n s a r i P a n

  • r

a mi c

  • B

a n d u n g Hi g h r i s e : 4 . 1 2 5 m2

L

a G r a n d e T a ma n s a r i Me r d e k a

  • B

a n d u n g Hi g h r i s e : 4 . 3 9 3 m2

T

a ma n B u k i t Da ma i

  • B

a n d u n g L a n d e d h

  • u

s e : 8 2 9 m2 d h

  • u

s e : 8 2 9 m2 e d h

  • u

s e : 8 2 9 m2 d h

  • u

s e : 8 2 9 m2

T

a ma n s a r i P e r s a d a

  • B
  • g
  • r

n L a n d e d h

  • u

s e : 1 . 7 5 7 m2 e d d

J AKAR T A C E NT R AL J A V A

T

a ma n s a r i Ma j a p a h i t

  • S

e ma r a n g L a n d e d h

  • u

s e : 5 . 7 6 m2

T

h e Hi l l T a ma n s a r i

  • S

e ma r a n g L a n d e d h

  • u

s e : 1 6 . 4 8 m2

E AS T J A V A

De

P a p i l i

  • T

a ma n s a r i

  • S

u r a b a y a Hi g h r i s e : 5 . 3 8 4 m2

B AL I

J

i v v a R e s

  • r

t @T a ma n s a r i

  • L

e p a n g L a n d e d h

  • u

s e : 1 . 2 5 9 m2

J

i n e n g T a ma n s a r i

  • B

a l i L a n d e d h

  • u

s e : 1 2 . m2

T

a ma n s a r i S S e ma e ma ma ma ma ma ma ma a ma m e n g g i i A A Ap a r p a r r a r a r a r a r a r a t e t e m e me n Hi g h r i s e : 8 2 2 2 1 m m 1 m m2 2 2 2 2 2

T

h e Hi v e @T a ma n s s a a r i r i r i r i r i r i r i r i r i r i r i r Hi g h r i s e : 6 . 7 m2 2

T

a ma n s a r i P e s

  • n

aB a l l i

  • i

J a k a r r t a t a t a t a t a t a t a t a t a t a a L a n d e d h

  • u

s e : 1 . 1 4 4 m2

F

e s t i v a l F a t ma wa t i

  • J

a k a r t a a F e s t i v a l F a t ma wa t i J a k a r k a t a a L a n d e d h

  • u

s e : 1 2 9 m2

Land Bank (as of September 2013) Landed House: 1.580.760 m2 High rise: 25.297 m2 included JO

Ongoing Project

11

PROPERTY

Realty

slide-12
SLIDE 12

Golden Steps to The Best TURBINE GAS POWER PLANT BORANG 2 X 30MW

TURBINE GAS POWER PLANT BORANG 2 X 30MW

12

INVESTMENT

Energy

slide-13
SLIDE 13

Golden Steps to The Best 13

  • 1. SK Menteri BUMN No. SK-16/S.MBU/2012

2.Assessment by Indonesia Quality Award (IQA) 3.Assessment by “Kriteria Penilaian Kinerja Unggul” (KPKU) 4.Assessment by LPPM 5.Assessment by AON Hewitt

  • 6. Assessment based Coso Framework
  • 7. Assessment based ISO 31000
  • GCG SCORE

(Assessor: BPKP)

  • CORPORATE RATING

(Assessor: PEFINDO)

  • PERFORMANCE

EXCELLENCE

  • ENGAGEMENT

LEVEL

  • RISK MATURITY

LEVEL

  • CORPORATE ASSESSMENT
slide-14
SLIDE 14

Golden Steps to The Best

  • GCG SCORE

(

  • BPKP

BUMN BERSIH

  • BUMN BERSIH Team

CGPI INDEX

  • ASEAN SCORECARD
  • CORPORATE GOVERNANCE ASSESSMENT

14

slide-15
SLIDE 15

Golden Steps to The Best

  • AWARDS & CERTIFICATIONS

15

slide-16
SLIDE 16

Golden Steps to The Best

ORDER BOOK, NEW CONTRACT, SALES & NET INCOME

2010 - 2014F

2010 2011 2012 2013 2014F

14,098 11,885 9,905 7,742 6,023 25,831 17,731 17,125 13,568 10,223 49,972 38,267 33,718 26,591 20,839

Order Book New Contract Sales Net Income

CAGR Net Income

1 9 , 2 %

C A G R S a l e s

18,52%

16

285 354 479 570 678

slide-17
SLIDE 17

Golden Steps to The Best 17

1250 2500 3750 5000

J an Feb Mar

  • ORDER BOOK & SALES
slide-18
SLIDE 18

Golden Steps to The Best 18

Government Private SOE

* Included Private Project in Oil & Gas 2012 = Rp 1,73 trilion 2013 = Rp 859 trilion 2014 = Rp 2,4 trilion

2012

18,4% Rp 3.136 30,6% Rp 5.249 * 51,0% Rp 8.740 33.0% Rp 3.302 39.4% Rp 3.938 27.6% Rp 2.754 27,2% Rp 7.022 34,2% Rp 8.842 * 38,6% Rp 9.967 25,4% Rp 4.809 34,9% Rp 6.605 39,7% Rp 7.516

2014F

24,3% Rp 4.312 40,7% Rp 7.209 * 35,0% Rp 6.210 26,8% Rp 4.041 30.8% Rp 4.649 42,3% Rp 6.382

2013

Sales New Contract Sales New Contract Sales New Contract

(bilion Rp.)

NEW CONTRACT & SALES

Sales New Contract Sales New Contract Sales New Contract

slide-19
SLIDE 19

Golden Steps to The Best 19

NEW CONTRACT

slide-20
SLIDE 20

Golden Steps to The Best 20

Description 2012 2013

  • CONSOLIDATED OF COMPREHENSIVE INCOME 2013
slide-21
SLIDE 21

Golden Steps to The Best 21

Description 1Q13 1Q14

  • CONSOLIDATED OF COMPREHENSIVE INCOME 1Q14
slide-22
SLIDE 22

Golden Steps to The Best 22

Description 2012 2013

Growth YoY

Total Current Assets 7.250,64 7.994,29 9,30% Total Non Current Assets 3.770,13 4.600,67 18,05% TOTAL ASSETS

11.020,77 12.594,96 12,50%

Total Current Liabilities 6.580,33 7.298,47 9,84% Total Non Current Liabilities 1.606,14 2.069,53 22,39% TOTAL LIABILITIES

8.186,47 9.368,00 12,61%

Share Capital 610,56 614,01 0,56% Treasury Stock (10,27) Additional PIC 756,06 713,75

  • 5,93%

Change of Equity in Subsidiaries 23,53 429,40 94,52% Retained Earning 1.204,22 1.202,09

  • 0,18%

Sub TOTAL EQUITY

2.594,36 2.948,96 12,02%

Non Controlling Interest 239,93 278,00 13,69% TOTAL EQUITY

2.834,30 3.226,96 12,17%

TOTAL LIABILLITIES & EQUITY

11.020,77 12.594,96 12,50%

  • CONSOLIDATED OF FINANCIAL POSITION 2013
slide-23
SLIDE 23

Golden Steps to The Best 23

Description 1Q13 1Q14

Growth YoY

Total Current Assets 7,994.29 7,892.37

  • 1.27%

Total Non Current Assets 4,600.67 4,975.21 8.14% TOTAL ASSETS

12,594.96 12,867.58 2.16%

Total Current Liabilities 7,298.47 7,417.69 1.63% Total Non Current Liabilities 2,069.53 2,039.83

  • 1.44%

TOTAL LIABILITIES

9,368.00 9,457.52 0.96%

Share Capital 614.00 614.00 0.00% Treasury Stock

  • 10

(10.27) 0.00% Additional PIC 713.75 713.75 0.00% Change of Equity in Subsidiaries 429.40 429.40 0.00% Retained Earning 1,202.09 1,369.61 13.94% Sub TOTAL EQUITY

2,948.96 3,116.48 5.68%

Non Controlling Interest 278.00 293.58 5.61% TOTAL EQUITY

3,226.96 3,410.06 5.67%

TOTAL LIABILLITIES & EQUITY

12,594.96 12,867.58 2.16%

  • CONSOLIDATED OF FINANCIAL POSITION 1Q14
slide-24
SLIDE 24

Golden Steps to The Best 24

Description

  • Received from Customers

9.680,39 11.253,37 Payment to Suppliers (8.828,93) (10.381,93 Payment for Directors and Employees (162,98) (233,39) Payment for Operating Expenses and Others (89,24) (124,53) Deposit Interest Receipt 36,49 24,11 Payment of Interest (44,58) (64,03) Payment of Taxes (112,99) (184,49) CASH FLOW FROM OPERATING ACTIVITIES 478,15 289,11 CASH FLOW FROM INVESTING ACTIVITIES (1.072,56) (619,87) CASH FLOW FROM FINANCING ACTIVITIES 871,06 185,31 INCREASE (DECREASE) OF NET CASH & CASH Q 276,65 (145,45) BEGINNING BALANCE OF CASH & CASH EQUIVALENT 1.255,50 1.532,15 ENDING BALANCE OF CASH & CASH EQUIVALENT 1.532,15 1.386,71

  • CONSOLIDATED STATEMENT OF CASH FLOW 2013
slide-25
SLIDE 25

Golden Steps to The Best 25

Description

  • Received from Customers

2,300.66 2,221.67 Payment to Suppliers (2,256.44) (2,276.28) Payment for Directors and Employees (48.12) (61.46) Payment for Operating Expenses and Others (34.98) (27.46) Deposit Interest Receipt 13.50 8.75 Payment of Interest (1.15) (10.51) Payment of Taxes (97.52) (75.68) CASH FLOW FROM OPERATING ACTIVITIES (124.06) (220.97) CASH FLOW FROM INVESTING ACTIVITIES (298.14) (156.15) CASH FLOW FROM FINANCING ACTIVITIES 294.29 133.52 INCREASE (DECREASE) OF NET CASH & CASH Q (127.91) (243.60) BEGINNING BALANCE OF CASH & CASH EQUIVALENT 1,499.14 1,386.71 ENDING BALANCE OF CASH & CASH EQUIVALENT 1,371.23 1,143.10

  • CONSOLIDATED STATEMENT OF CASH FLOW 1Q14
slide-26
SLIDE 26

Golden Steps to The Best

  • 26
  • CAPITAL EXPENDITURE 2013
slide-27
SLIDE 27

Golden Steps to The Best 27

  • CAPITAL EXPENDITURE 2014F
slide-28
SLIDE 28

Golden Steps to The Best

  • 28

SHAREHOLDER’S STRUCTURE

  • O ver 600 institutional investors
  • Approximately 8,391 individual shareholder
  • 669 Employees and former employees are shareholders

h ld

slide-29
SLIDE 29

Golden Steps to The Best

Year Net Income (IDR Bio) EPS (IDR) Dividend Payout Ratio 2008 156.03 26.75 30% 2009 189.22 33.37 30% 2010 284.92 50.15 35% 2011 354.5 60.59 30% 2012 457.86 76.01 30% 2013 569.94 92.93 30%

  • 29

STOCK PRICE PERFORMANCE

slide-30
SLIDE 30

Golden Steps to The Best

  • Additional Information is available upon request.

For further Information please contact: Natal Argawan Pardede, Corporate Secretary Phone (021) 8192808 or Facsimile (021) 8191235 Visit us: www.wika.co.id

  • Disclaimer
  • This material is for Information only, and we are not soliciting any action based upon it. This report is not to be construed

as an offer to sell or the solicitation of an offer to buy any security in any jurisdiction where such an offer or solicitation would be illegal. The Information herein has been obtained from sources believed to be reliable, but we do not warrant that it is accurate or complete, and it should not be relied upon as such. Opinion expressed is our current opinion as of the date appearing on this material only, and subject to change without notice. It is intended for the use by recipient only and may not be reproduced or copied/photocopied or duplicated or made available in any form, by any means, or redistributed to others without written permission of PT Wijaya Karya (Persero) Tbk.

The End of Presentation

30