BACKGROUND JULY 23 rd WORK SESSION GMP BIDS AT $25,000,000 OVER TOTAL PROJECT COST. REDESIGN AND VE TO $15,000,000 OVER TPC. ON BUDGET BY SHELLING 100% OF LABS AND OFFICES. JULY 30 th EXECUTIVE MEETING PROJECT BUDGET


  1. BACKGROUND JULY 23 rd WORK SESSION • GMP BIDS AT $25,000,000 OVER TOTAL PROJECT COST. • REDESIGN AND VE TO $15,000,000 OVER TPC. • ON BUDGET BY SHELLING 100% OF LABS AND OFFICES. JULY 30 th EXECUTIVE MEETING • PROJECT BUDGET INCREASED TO $110,000,000. • RETAIN FULL PROGRAM (AT 50% LAB SHELL). • MAINTAIN CHARACTER OF BOARD APPROVED DESIGN. AUGUST 7 th WORK SESSION • LOWERED BUILDING “TO GRADE”. • IDENTIFIED REDUCTIONS ACROSS THE BOARD. • “AT GRADE” DESIGN ON BUDGET.

  2. OBJECTIVES DESIGN TO ACHIEVE BUDGET • ESTABLISH $/SF TARGET FOR REDESIGN. • IDENTIFY EFFICIENCIES FOR EACH PROJECT COMPONENT. • SIMPLIFY SYSTEMS (STRUCTURE, MEP, LAB SUPPORT) RETAIN BOARD APPROVED DESIGN • MAINTAIN CURRENT LAB PROGRAM AND LAYOUT. • CURVED GEOMETRY DERIVED FROM FLOYD CURL DRIVE. • “GATEWAY” STATEMENT AT CAMPUS DRIVE ENTRY. MINIMIZE SCHEDULE IMPACT • SIMPLIFY BUILDING TO REDUCE RE-DESIGN TIME. • FACILITATE CONSTRUCTABILITY. • DOCUMENT DELIVERY TAILORED TO CONSTRUCTION SEQUENCE.

  3. “AT GRADE” DESIGN • MORE EFFICIENT LAB LAYOUTS--REDUCE MODULE BY 6”. • NUMBER OF P.I.’S REMAINS THE SAME (42). • “GENERIC” APPROACH TO LABS--MAXIMUM FLEXIBILITY. • DEVELOP FIT-OUT OF LAB SPACES FROM WEST END. • SIMPLIFIED STRUCTURE--NO CANTILEVERS. • REDUCE VIBRATION CRITERIA FROM 4,000 MIPS AT MODERATE DOWN TO SLOW PACE (TYPICAL FOR LAB SPACES). • MINIMIZE COST OF EXTERIOR ENVELOPE. • LESS GLASS AREA, DECREASES ENERGY LOAD. • REDUCTION IN MECHANICAL SYSTEMS. • FEWER ELEVATOR/STAIR CORES (LOWER BUILDING).

  4. ADDITIONAL SAVINGS • REDUCE CENTRAL PLANT SIZE BY 10-15%. • REDUCE CHILLER SIZES. • DOWNSIZE CHILLED WATER LINES. • ALTERNATE PRICING FOR COOLING TOWER, PUMP & CHILLER. • REVIEW BACK FEED OF ELECTRICAL SERVICE. • RELOCATE VIVARIUM MECHANICAL UNITS TO MAIN BUILDING.

  5. “AT GRADE” DESIGN IMAGES

  6. “AT GRADE” DESIGN--AERIAL VIEW

  7. VIEW TOWARDS CAMPUS DRIVE

  8. VIEW TOWARDS ENTRY

  9. VIEW FROM FLOYD CURL DRIVE

  10. LOADING MECHANICAL LOBBY GROUND FLOOR LABORATORIES SECOND FLOOR OFFICES MECHANICAL THIRD FLOOR

  11. TYPICAL LAB BAY

  12. CROSS SECTION

  13. RECENT LABORATORY EXPERIENCE

  14. Howard Hughes Medical Institute Bard College, Center for Science & Computation Van Andel Institute UCSF Helen Diller Family Cancer Research Building Princeton University, Carl Icahn Lab UCLA California NanoSystems Institute

  15. BARD COLLEGE

  16. BARD COLLEGE

  17. PENN STATE

  18. UCLA NANOSYSTEMS

  19. UCLA NANOSYSTEMS

  20. UCSF DILLER CANCER CENTER

  21. HOWARD HUGHES MEDICAL INSTITUTE JANELIA FARMS

  22. HOWARD HUGHES MEDICAL INSTITUTE JANELIA FARMS

  23. RAFAEL VIÑOLY ARCHITECTS / KIRKSEY

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.