Cyfarthfa Retail Park North B&Q Introduction Name : David Humphrey Position : Design Manager Company : BAM Construction Client : Hammerson Tenant : B&Q Sustainability: Installation of a Transpired Solar Collector Design


slide-1
SLIDE 1

Cyfarthfa Retail Park North

B&Q

slide-2
SLIDE 2

Name: David Humphrey Position: Design Manager Company: BAM Construction Client: Hammerson Tenant: B&Q Sustainability: Installation of a Transpired Solar Collector

Introduction

slide-3
SLIDE 3

Issues:

  • 15% Roof light requirement
  • Confirmation of Smoke Vent size & Position
  • Full Sprinkler Installation
  • 2.5m3/m2.hr air tightness requirement
  • Blockwork to B&Q requirements

Design Coordination

slide-4
SLIDE 4

Issues:

  • Bottom 2.475m constructed of blockwork

Design Coordination

slide-5
SLIDE 5

Issues:

  • A completely new technology with no experience
  • We didn’t know the who, the how or the specific

requirements for the installation

  • Main problem was placing the subcontract order and

timing for the install

  • Tata Steel’s Terms and Conditions were ‘difficult’ for

BAM to agree.

  • Not just a product specified by an Architect/

Engineer for installation by a BAM Subcontractor

Design Coordination

slide-6
SLIDE 6

Design Changes: Headlines

  • Change of roof from Kalzip to Euroclad SF500
  • Green Roof required to outer slopes for planning
  • Roof light requirement of 15% compromised by Solar

Collector and other design requirements.

  • Mansafe requirement for ‘Fall Prevention’ to roof

rather than ‘Fall Arrest’, increased walkway/ latchway requirement.

Value Engineering

slide-7
SLIDE 7

Changing Location

slide-8
SLIDE 8

Changing Location

slide-9
SLIDE 9

Changing Location

slide-10
SLIDE 10

Commercial Reality

■ Tata asked to provide a Performance Warranty ■ BAM had to take make some very difficult decisions regarding roofing products ■ Value Engineering assistance provided by Tata was supportive ■ Numerous hours spent by Tata and BAM discussing the

  • bjectives of the SBED programme

■ Understanding of the what was important of the install of what appeared to be ‘standard’ building components

slide-11
SLIDE 11

Build Reality

■ Standard recognisable building components ■ Understanding of bringing ‘stranger’ trades together ■ Length of panels were difficult to handle ■ Installed following completion of the main roof

slide-12
SLIDE 12

Installed TSC

slide-13
SLIDE 13

Internal Ductwork

slide-14
SLIDE 14

Holes through roof

slide-15
SLIDE 15

Control Panel

slide-16
SLIDE 16

Any Questions?