play

A PRESENTATION OF BAMENDA III BEST PRACTICE Theme WA WATER TER - PowerPoint PPT Presentation

A PRESENTATION OF BAMENDA III BEST PRACTICE Theme WA WATER TER MA MANAGEMENT GEMENT IN B IN BAMEND AMENDA III A III CITY ITY PRESENTED BY Fongu cletus Tanwe(Mayor) and Atanga Marina Mangwi(Public Relations Officer)


  1. A PRESENTATION OF BAMENDA III BEST PRACTICE Theme WA WATER TER MA MANAGEMENT GEMENT IN B IN BAMEND AMENDA III A III CITY ITY PRESENTED BY Fongu cletus Tanwe(Mayor) and Atanga Marina Mangwi(Public Relations Officer) www.bamenda3council.org

  2. TOPIC A Presentation of the Bamenda III Purified Water Scheme Sponsored by Bamenda III Council and Trinkwasser Fur kamerun\Trier City, Germany www.bamenda3council.org

  3. PROBLEM STATEMENT The previous state of water supply in Bamenda III was characterized by inadequate capacities of water supply, incoherent water supply networks, unprotected water catchments, poorly maintained water supply network and infrastructure and doubtful quality of water supply with less than 20% of the population accessing safe water (Bamenda III Land Use Plan 2012) www.bamenda3council.org

  4. The hunt for water www.bamenda3council.org

  5. Situation Analysis of water Crisis www.bamenda3council.org

  6. Introduction of the project Bamenda III Council in Partnership with Trinkwasser für Kamerun (Association for the promotion of Drinking Water supply in Cameroon) had as priority to develop a purified water scheme that shall collect, treat and supply clean portable water within the Sub Division of Bamenda III Municipality . www.bamenda3council.org

  7. OUR BEST PRACTICE INNITIATIVE • The practice involves partnering with an external partner, collaborating with local institutions and mobilizing local communities in the development of a water supply scheme for Bamenda III Council area. • The concrete activities include the development and protection of the water supply catchment; the installation of water purification and storage facilities and the distribution of water and the proper management and maintenance of water supply. www.bamenda3council.org

  8. Different phases of Realisation Feasibililty Studies and Data collection in 2012 1. 2. Shipping of the Raw materials(pipes, filters valves, Sulphate ,chlorine etc) 3. The realisation phase; that is • -laying of the raw water pipeline • -The Installation of the filters by the German Engineers accompanied by Bamenda III Council technician • -Construction of stand taps in the community The - Optimization of the water Scheme - Regular Visit from the German Engineers - Construction of the 200,000litres Tank - Installation and Maintenance of the Generator for clean water Flushing and Air flushing www.bamenda3council.org

  9. Bamenda III water scheme • As concerns the water distribution points within the Municipality there exist 7 standby taps in six quarters. • From January 2019 to 0ctober, the total consumption is evaluated to an amount of 105,000 users (Estimated population 200,000 people)in both the public and private distributions. The water supply projects generates an annual contribution of about 50,000000Frs , (84 679USD) to council revenue which is ploughed back to financing the management of the scheme .The above statistics is mindful of the fact that school children and some vulnerable persons are not charged at the public distribution point www.bamenda3council.org

  10. THE WATER SCHEME • The volume of the water reservoir at the moment is 280 000 litres which can supply 40 000 liters of water per hour. This can serve about 38000 people per day at minimum UN water supply standard of 7.5l/person/day. The quality of water after treatment has 0.0 impurity which compares with universal standards. www.bamenda3council.org

  11. The Bame he Bamenda nda III Council III Council Water ter Sc Scheme in heme in Pictur Pictures es www.bamenda3council.org

  12. One of the sensitization Meeting prior to the upcoming water project(Menteh ,Source of the water 2013 ) www.bamenda3council.org

  13. The Source of the Bamenda III water (Menteh) and the progressive construction of the damn www.bamenda3council.org

  14. Construction of the Pipeline for extraction of Raw water from the Damn to the treatment Center www.bamenda3council.org

  15. The Arrival and Installation of the purification plant from Germany www.bamenda3council.org

  16. The team behind the first flow and the overall project Realization www.bamenda3council.org

  17. The advancement of the construction of the 80,000littres Tank in 2015 www.bamenda3council.org

  18. The he Ina Inaug ugur uration tion ce cerem emon ony y of of the the gian giant w t water ter pr projec oject spon t sponsor sored ed by by Trinkw rinkwass asser er an and d Bamen Bamenda da III III Coun Council cil 20 2016 16 www.bamenda3council.org

  19. The tr tradition itional a l auth thorities rities an and th the Cha Chair irma man of of th the Social Social Demo Democr cratic tic Fron ont t emp empower ering an ing and d Blessing Blessing th the e Son of Son of th the Soil e Soil La Lambe mbert t AK AKONGHA ONGHA for or Initi Initiating ting th the e Project oject www.bamenda3council.org

  20. Se Sens nsiti itiza zation tion an and d Ina Inaug ugur uration tion of of the the pu public blic ta taps in ps in Nt Ntagh ghem em II II(07 (07 other P other Public ublic ta tabs ar bs are e fun function ctioning ing und under er the the sc sche heme of me of the pr the projec oject www.bamenda3council.org

  21. Presentation and usage of testing equipment and report booklets presented by the German team www.bamenda3council.org

  22. Public clamor for Bamenda III water www.bamenda3council.org

  23. The constr he construction of uction of the the Second R Second Reser eservoir oir • After several testing of the water turbidity, temperature and the chlorine was recorded and reported to our team of experts in Germany, it was realized later in 2016 that the water supply was insufficient to meet the needs of the inhabitants of the Municipality. Hence, the second Giant Tank of a capacity of two hundred thousand Litres (200,000L) was constructed and which led to the increase in production capacity of about 40,000litres per hour www.bamenda3council.org

  24. The Constr he Construction of uction of the the Second R Second Reser eservoir oir Constructed by Forban and Son www.bamenda3council.org

  25. A Front view of the project site www.bamenda3council.org

  26. Overview of the Spare part store, Office and Generator www.bamenda3council.org

  27. Plan of water supply Network www.bamenda3council.org

  28. Overview of project Sight www.bamenda3council.org

  29. www.bamenda3council.org

  30. In Appreciation of our best practice, Bamenda III City won a National Award for implementing the most accomplishing best practice in the North West Region www.bamenda3council.org

  31. Some of the problems encountered in our city • In spite of the positive results obtained this far, the Bamenda III Council Water Scheme encounters a number of problems .The funds available to the Council to meet present and future demands and needs of water for the entire population are grossly inadequate. • The problem of garbage collection stands as one of the major challenges in our city. Others include ;Poor road infrastructure, Energy shortage, • Lack of Educational infrastructure especially at the higher level. www.bamenda3council.org

  32. THANK YOU FOR YOUR KIND ATTENTION www.bamenda3council.org

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.