UWCHLAN HILLS ELEMENTARY SCHOOL APRIL BOARD MEETING APRIL 4, 2018 BOARD SCHEDULE TONIGHT: Review of Building Program / Construction Options April 11: Board Action on Building Program / Construction Options presented ORIGINAL PROGRAM FIRST


slide-1
SLIDE 1

UWCHLAN HILLS ELEMENTARY SCHOOL

APRIL BOARD MEETING

APRIL 4, 2018

slide-2
SLIDE 2

BOARD SCHEDULE

TONIGHT: Review of Building Program / Construction Options April 11: Board Action on Building Program / Construction Options presented

slide-3
SLIDE 3

FIRST FLOOR

ORIGINAL PROGRAM

slide-4
SLIDE 4

ORIGINAL PROGRAM

SECOND FLOOR

slide-5
SLIDE 5

FIRST FLOOR

21ST CENTURY SCHOOL DESIGN

slide-6
SLIDE 6

SECOND FLOOR

21ST CENTURY SCHOOL DESIGN

slide-7
SLIDE 7

ORIGINAL FOOTPRINT VS. NEW FOOTPRINT

21ST CENTURY SCHOOL DESIGN

slide-8
SLIDE 8

SITE PLAN

21ST CENTURY SCHOOL DESIGN

slide-9
SLIDE 9

BUS LOOP AS PLAY

21ST CENTURY SCHOOL DESIGN

slide-10
SLIDE 10

BUS LOOP AS PARKING

21ST CENTURY SCHOOL DESIGN

  • Triple use of bus

loop

  • Hardscape play

area

  • Safe and separate

bus loop

  • Additional parking

for after school activities

slide-11
SLIDE 11

FIRST FLOOR - COMMUNITY

21ST CENTURY SCHOOL DESIGN

slide-12
SLIDE 12

FIRST FLOOR - EDUCATIONAL

21ST CENTURY SCHOOL DESIGN

slide-13
SLIDE 13

FIRST FLOOR - STEM

21ST CENTURY SCHOOL DESIGN

slide-14
SLIDE 14

FIRST FLOOR - EDUCATIONAL

21ST CENTURY SCHOOL DESIGN

slide-15
SLIDE 15

SECOND FLOOR - EDUCATIONAL

21ST CENTURY SCHOOL DESIGN

slide-16
SLIDE 16

SECOND FLOOR - EDUCATIONAL

21ST CENTURY SCHOOL DESIGN

slide-17
SLIDE 17

SECOND FLOOR - EDUCATIONAL

21ST CENTURY SCHOOL DESIGN

slide-18
SLIDE 18
  • Room size decrease 850 SF to

825 SF

  • Net decrease of 575 SF

(23 classrooms)

  • Program reduced by 1 Full-day

Kindergarten Classroom

  • Net decrease of 825 SF

(22 classrooms)

  • Total Net decrease of 1,400 SF

PROGRAM ADDED VALUE – CLASSROOM

REFERENCE – Pickering Valley Classrooms – 900 SF

slide-19
SLIDE 19

PROGRAM ADDED VALUE – SGI

  • Room size increase 424 SF to 550 SF
  • Net increase of 882 SF (7 SGIs )
  • Program reduced by 1 SGI
  • Net decrease of 550 SF (6 SGIs)
  • Total net increase of 332 SF
  • Size increase of SGI spaces counts

towards reimbursement for PlanCon

  • SGI’s need to be 550 SF or larger to

count for capacity

slide-20
SLIDE 20

PROGRAM ADDED VALUE - MUSIC

  • Room size increase from

880 SF to 1,100 SF

  • Addition of Instrumental

Practice Room

  • Addition of Music Storage

Room

  • Net increase of 510 SF
slide-21
SLIDE 21

PROGRAM ADDED VALUE - ART

  • Room size decrease from

1,400 SF to 1,100 SF – same size as Music Room

  • Provide large Storage Room

and separate Kiln Room

  • Stacked on Music for

building effeciency

  • Net reduction of 360 SF
slide-22
SLIDE 22

PROGRAM ADDED VALUE – STEM PROGRAM

  • 1,795 SF to hold all Media

Center Program / STEM Program

  • Many stacks = less flexible space

for STEM activities

  • Original Program is missing

Innovation Lab, current school has Innovation Lab ORIGINAL LEARNING COMMONS (MEDIA CENTER) if we split up the space….

slide-23
SLIDE 23

PROGRAM ADDED VALUE – STEM PROGRAM

PROPOSED LEARNING COMMONS (MEDIA CENTER) / STEM PROGRAM STEM COMMONS FIRST FLOOR 1,420 SF INOVATION LAB SECOND FLOOR 825 SF LEARNING COMMONS SECOND FLOOR 1,340 SF TOTAL NET INCREASE – 1,790 SF

slide-24
SLIDE 24

FRONT DOOR

slide-25
SLIDE 25

STEM / INNOVATION LAB

slide-26
SLIDE 26

INNOVATION LAB / SECOND FLOOR CORRIDOR

slide-27
SLIDE 27

INNOVATION LAB

slide-28
SLIDE 28

LEARNING COMMONS

slide-29
SLIDE 29
  • Original Program – 2 Learning

Support Rooms at 850 SF

  • Additional Learning Support

Room needed to fulfill educational program – 3 Rooms at 825 SF

  • Net increase of 775 SF

PROGRAM ADDED VALUE – LEARNING SUPPORT

slide-30
SLIDE 30

PROGRAM ADDED VALUE - ACP

  • A Child’s Place classroom –

net increase of 825 SF

  • Access to individual toilet

room from classroom

  • Access to stair tower for

secure entry without entering the building

slide-31
SLIDE 31
  • Addition of 670 SF on

each floor – net increase

  • f 1,340 SF
  • Classroom Breakout

Space located within classroom clusters for easy access

PROGRAM ADDED VALUE – BREAKOUT SPACE

8 feet clear

slide-32
SLIDE 32

BUILDING ADDED VALUE – ADMINISTRATION

  • Addition of 315 SF to

Administration Area (includes Nurse Suite)

  • Provides necessary space

for Reception, Workroom, Conference, Principal, Guidance, Psychologist, and Storage

slide-33
SLIDE 33
  • Room increase from 490

SF to 680 SF – net increase of 190 SF

  • Larger room provides

additional meeting space

  • Access to Faculty Toilet

Room PROGRAM ADDED VALUE – INSTRUCTIONAL PLANNING CENTER

slide-34
SLIDE 34
  • Cafeteria, Stage,

Kitchen, and Faculty Dining net increase of 190 SF

  • Cafeteria to seat 200

students BUILDING ADDED VALUE – STAGE / CAFETERIA / KITCHEN

slide-35
SLIDE 35
  • Stage to face Cafeteria
  • 338 occupant assembly

space for after school activities

  • Stage has direct access
  • ff corridor

BUILDING ADDED VALUE – STAGE / CAFETERIA / KITCHEN

slide-36
SLIDE 36

BUILDING PROGRAM SF INCREASE

PROGRAM ADDED VALUE

Program SF Increase/Decrease

Classroom

  • 1,400

SGI 332 Music 510 Art

  • 360

STEM 1,790 Learning Support 775 A Child's Place 825 Breakout Space 1,340 Admin. 345 Stage / Cafeteria / Kitchen / Faculty Dining 190 IPC 190 TOTAL PROGRAM INCREASE 4,537

slide-37
SLIDE 37

BUILDING ADDED VALUE – CODE STUDY

ADDED STAIR TOWER – ADDITIONAL EXIT TO BUSES ADDED GANG TOILETS ON FIRST FLOOR KEEPS KIDS IN THE CLASSROOM WING

slide-38
SLIDE 38
  • Addition of 2,380 SF
  • Site conditions allow

for maintenance access without entering the building

  • Keeps large main

mechanical room out

  • f educational area

BUILDING ADDED VALUE – BASEMENT

MECHANCIAL EQUIPMENT

slide-39
SLIDE 39

FUTURE EXPANSION

FIRST FLOOR – WITHOUT ADDITION

slide-40
SLIDE 40

FUTURE EXPANSION

FIRST FLOOR – WITH ADDITION

slide-41
SLIDE 41

FUTURE EXPANSION

SECOND FLOOR – WITHOUT ADDITION

slide-42
SLIDE 42

FUTURE EXPANSION

SECOND FLOOR – WITH ADDITION + FLEX CLASSROOM

slide-43
SLIDE 43

FUTURE EXPANSION

WITHOUT CLASSROOM - ROOF WITH FLEX CLASSROOM

  • To add the Flex

Classroom with a building addition would cost 2-3X more than if built with new school design

slide-44
SLIDE 44
slide-45
SLIDE 45

PROJECT COST

Proposed New Construction

  • sq. foot

$/sq. foot New School Building 72,660 $230 $16,711,800 Mechanical / Storage - Basement 2,710 $150 $406,500 Site Work (Allowance) $3,500,000 Sub Total $20,618,300 Design/Bidding Contingency - 5% $1,030,915 TOTAL CONSTRUCTION COST $21,649,215 Construction Contingency - 5% $1,082,461 Soft Costs - Allowance $3,170,409 TOTAL PROJECT COST $25,902,085 Current Total Project Cost 75,370 Gross Building SF $25,902,085 Previous Total Project Cost 70,032 Gross Building SF $24,859,682 Change in Project Cost $1,042,403

slide-46
SLIDE 46

PROJECT OPTIONS

New Total Project Cost 75,370 Gross Building SF $25,902,085 Option 1: Add for Flex Classroom 865 Added SF $198,950 Total Project Cost with Flex Classroom $26,101,035 Option 2: Increase Classrooms to 850 SF from 825 SF 725 Added SF $166,750 Total Project Cost with Flex Classroom / 850 SF Classrooms $26,267,785 Option 3: Future Expansion Built as part of this Project 4,290 Added SF $986,700 Total Project Cost with Future Expansion $27,254,485

slide-47
SLIDE 47

SCHEDULE

slide-48
SLIDE 48

DISCUSSION