APPENDIX G: Meeting Materials Presentation Boards November 16, - - PDF document

appendix g meeting materials presentation boards
SMART_READER_LITE
LIVE PREVIEW

APPENDIX G: Meeting Materials Presentation Boards November 16, - - PDF document

APPENDIX G: Meeting Materials Presentation Boards November 16, 2016 45 Welcome! PURPOSE OF TODAYS MEETING To obtain public input


slide-1
SLIDE 1

November 16, 2016 45

APPENDIX G: Meeting Materials Presentation Boards

slide-2
SLIDE 2

November 16, 2016 46

Welcome!

AGENDA

6 - 6:30 p.m. Visit information stations and speak one-on-one with project representatives 6:30 - 7:30 p.m. Formal presentation followed by brief Q&A 7:30 - 8 p.m. Visit information stations and speak one-on-one with project representatives

PURPOSE OF TODAY฀S MEETING

To obtain public input on preliminary design plans for the Loop 202 (South Mountain Freeway) Project Not to debate project alignment and “build or no build” options

  • YOUR INPUT IS IMPORTANT TO US!

Submit your comments at today’s meeting Speak to project representatives in person Write your comments on the forms provided and hand them to a project team member Send us your comments Email: southmountainfreewayinfo@c202p.com Project website: southmountainfreeway.com Mail your comments to us at the following address South Mountain Freeway Project Team; 411 N. Roosevelt Ave. Chandler, AZ 85226 Call us at the project hotline: 1.855.SMF.L202 (1.855.SMF.L202) / Para español: 623.239.4558

slide-3
SLIDE 3

November 16, 2016 47

2016 2017 2018 2019

WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL

Design Phase and Preconstruction Activities Utility Relocation Construction Phase* Public Meetings to Obtain Input

  • n Preliminary Design Plans

Public Meetings to Share Final Plans, Present Construction Information and Introduce Construction Managers

Construction Se gments and Schedule

Downtown Phoenix Gila River Indian Community

Phoenix

10 10 10 10 17 17 60 202

LOOP

51

SR

75th Ave. 59th Ave. 51st Ave. 43rd Ave. 67th Ave. Roosevelt Van Buren UPRR Buckeye Rd. Broadway Rd. Southern Ave. Baseline Rd. Dobbins Rd. Elliot Rd. Estrella Dr. LACC Lower Buckeye Rd. Elwood RID Canal 51st Ave. Ivanhoe St. 17th Ave. Desert Foothills Pkwy. 24th St. 32nd St. 40th St. S a l t R i v e r

I-10 Papago Segment Salt River Segment Center Segment Pecos Segment

South Mountain Park

SR 202L Alignment South Mountain Freeway Interchange Locations Gila River Indian Community

LEGEND *Notes:

  • 1. Preliminary Schedule ฀ Subject to Change.
  • 2. Due to the nature of the design-build project delivery method being used for the South Mountain Freeway Project and the fact that it is a 22-mile project, construction activities will occur in multiple locations

within each construction segment during the construction phase.

PUBLIC INVOLVEMENT OPPORTUNITIES* PROJECT SCHEDULE OVERVIEW

Pecos, Salt River and I-10 Segments Center Segment Center Segment Pecos, Salt River and I-10 Segments

slide-4
SLIDE 4

November 16, 2016 48

Five Different Character Areas for Landscape Architectural Design Five Unique Aesthetic Areas

Landscaping and Aesthetic Design Concepts

slide-5
SLIDE 5

November 16, 2016 49

Landscape and Aesthetics Noise Right-of-Way Diverging Diamond Interchange ADOT Title VI Notice

slide-6
SLIDE 6

November 16, 2016 50

APPENDIX H: Preliminary Design Public Input Meetings Presentation