Lafayette Avenue Bicycle Route and Traffic Calming

Fulton Street to Classon Avenue

Commissioner Janette Sadik-Khan New York City Department of Transportation Presented to Community Board 2 June 19, 2012

slide-2
SLIDE 2

− CB 2 requested a study of an extension of the existing Lafayette Ave bicycle lane from Fulton St to Carlton Ave − Important connections from Downtown Brooklyn to neighborhoods to the east − Heavy bus ridership: B38 is 23rd busiest line in city − New bus bulb @ S. Portland Ave prevents lane removal

Project Background

slide-3
SLIDE 3

Crash Data and Speeding Issues

Lafayette ette Aven enue ue Cr Crash ash History History

Fulton Street – Classon Avenue (2006-2010)

Type ype of f Inj njury ury Total tal Inj njuri uries es Aver erage age Inj njury/ ury/Year ear Aver erage I age Inj njury/ ury/ Mil Mile/ e/Year ear Se Serio rious us Inj njury/ ury/ Mil Mile/ e/Year ear Pede edestr strian an 22 22 4. 4.4 5. 5.1 0. 0.3 Bicy Bicycli clist st 14 14 2. 2.8 3. 3.2 0. 0.2 Moto Motor Veh ehicle cle Occupant Occupant 174 174 34 34.8 .8 40 40.4 .4 0. 0.9

Tot

  • tal

al Injurie Injuries 210 210 42 42 48.8 48.8 0.8 0.8

Source: NYS DMV, 2005-2010

− Over 1 in 3 vehicles exce ceed d 30 0 mph ph spe peed d limit it (2010)

− 39% of vehicles icles speed ed

− Major factor in pedestrian injuries is speeding

slide-4
SLIDE 4

Existing Conditions

− 769 vehicles per hour during peak; lane removal not an option − 489 cyclists per day on weekday; 769 per day on weekend with no bicycle facilities − Traffic signals timed to 25 mph

slide-5
SLIDE 5

Existing Conditions - Lafayette Ave

Facing acing west st btw btw. . Cu Cumberland mberland Ave. . and and Car Carlto lton n Ave. Facing acing west st btw btw. . Washingto ashington n Ave. . and S and St. . James James Pl. Pl.

slide-6
SLIDE 6

− Proposal reduces signal timing from 25mph to 20mph − Maintains existing vehicle throughput − More pedestrian friendly − Reduces speed differential between motor vehicles and cyclists in shared lane

Signal Retiming

slide-7
SLIDE 7

− Provides bicycle access and

  • rganizes traffic

− Installs shared lane − Re-times traffic signals to 20 mph − Calms vehicular traffic − Maintains vehicle mobility − Improves safety for all roadway users

Project Summary

slide-8
SLIDE 8

Enhanced Shared Lane Install Parking Lane Lines

Proposed Configuration – Fulton St to Classon Ave

Increased Safety by Organizing Street

slide-9
SLIDE 9

Proposed Configuration

Exampl ample e of Pr f Proposed posed Design esign 1st

st Avenue,

enue, Manhattan Manhattan

slide-10
SLIDE 10

Questions?

Thank You