South Bethany Traffic Calming/Pedestrian Safety Study
Town of South Bethany Traffic Committee John Janowski Mike Trentadue Dave Wilson
South Bethany Traffic Calming/Pedestrian Safety Study Town of South - - PowerPoint PPT Presentation
South Bethany Traffic Calming/Pedestrian Safety Study Town of South Bethany Traffic Committee John Janowski Mike Trentadue Dave Wilson Study Route Analysis of implemented measures Speed by date 25 Radar signs Post radar sign installation
Town of South Bethany Traffic Committee John Janowski Mike Trentadue Dave Wilson
5 10 15 20 25
Speed by date
Black Gum SB Black Gum SB Tamarack NB Tamarack NB Evergreen WB Evergreen WB Speed Limit Speed Limit
Post radar sign installation speed avg below limit Signs inoperable for portion of data collection
Barricade removed
During barricade more volume WB than EB Post barricade traffic EB and WB equal Cut through traffic for beach uses ??? Drop in volume after Oct
5-Jul-16 Traffic Control Measure Cut Thru Volume Reduction Speed Reduction Pedestrian Safety Bike Safety Renters Town Residents Route Residents Contractors View Shed Parking Implementation time Cost 1 Sidewalks:
2 Unobstructed Road Shoulders 3 No Left Turn NB at Black Gum/Kent:
4 Closing Black Gum at Kent Ave. 5 Reduce Speed Limit 15 mph 6 Open Pine Street
7 Dedicated Right-turn Lane Evergreen/Route 1 8 Gated Community 9 Cat Hill De- Anexation 10 Comprehensive Transportation Study Impact On
Traffic Control Measure/Alternatives Through Volume Reduction Speed Reduction Pedestrian Safety Bike Safety Town Residents Corridor Residents Asthetic - View Shed Parking Implementation Time Cost Total Rank 1.Walkways
5 2 2
5
1 4 3 2 3 5
17 1 2.Unobstructed Road Shoulders
2
8 3.Closing Black Gum at Kent Ave.
5 1 4 4
3 1
13 3
5 1 4 4
3 1
14 2 4.One Way - Cat Hill Sec. w/out Pine Rd.w/sidewalk part of cartway 4 1 5 5
3 1
15 1 5.Pine Street (new road)
3
8
3 3 2
6
4 1 5 5 1 2
8 4 6.Dedicated Right-turn Lane Evergreen/Route 1
2
7 7.Gate Contolled Access
5 1 3 3
5
1
15 1
5 1 3 3
5
1
15 1
Traffic Control Measure/Alternatives Rank 1 Walkway:
1 7 Gate Contolled Access:
2
2 4 One Way - Cat Hill Sec. w/out Pine Rd.w/sidewalk part of cartway 2 3 Closing Black Gum at Kent Ave: Seasonally 3 Permanently 4 5 Pine Street (new road) One Way Pair with Cat Hill Corridor 5 Alternatives with negative scores: 1 Walkway:
6 5 Pine Street (new road) One-way 7 6 Dedicated Right-turn Lane Evergreen/Route 1 8 Pine Street (new road) Two-way 9 2 Unobstructed Road Shoulders 9
Map of Area South Bethany Begin here End Here
Remove line Current width 22ft Paint white line 18ft from opposite curb resulting in 4ft zone with 18 ft cartway equal to Canal Road Shoulders can be leveled or enhanced 6in per side if necessary
Black Gum Dr
Cattail Road
Replicate actions from Black Gum Cartway width 22ft
Tamarack Dr
Replicate actions from Black Gum Cartway width 22ft
Current cartway width 18ft ( no double line)
Canal Road
May have room to augment shoulders 2 ft on each side
Evergreen Road
26 ft
22 ft cartway no double lines Pedestrian walkway with physical separation
(open space on 1 side)