ahu 01 configuration 60 fd
play

AHU-01 Configuration - 60% FD CLASHES WITH UPDATED MONORAIL BEAM - PowerPoint PPT Presentation

CURRENT CONFIGURATION AHU-01 Configuration - 60% FD CLASHES WITH UPDATED MONORAIL BEAM MONORAIL BEAM (8m) TITLE: AHU CONFIGURATION OPTIONS DATE: 12/12/18 DRAWN BY: DC OPTION NOT PREFERRED FROM AHU-01 Configuration - Rotate 90 deg


  1. CURRENT CONFIGURATION AHU-01 Configuration - 60% FD CLASHES WITH UPDATED MONORAIL BEAM MONORAIL BEAM (8m) TITLE: AHU CONFIGURATION OPTIONS DATE: 12/12/18 DRAWN BY: DC

  2. OPTION NOT PREFERRED FROM AHU-01 Configuration - Rotate 90 deg EXCAVATION PERSPECTIVE MONORAIL BEAM (8m)

  3. AHU-01 Configuration - Split Unit MONORAIL BEAM (8m) OPTION NOT PREFERRED DUE TO SUPPLY DUCTS EXISTING ON BOTH SIDES OF MONORAIL CHALLENGE FOR FUTURE DUCT CONNECTION CROSSING MONORAIL BEAM

  4. AHU-01 Configuration - Floor Level Horizontal MONORAIL BEAM (8m) BSI PREFERRED OPTION AHU IS ACCESSED FROM LOW LEVEL AND SUPPLY DUCT IS ON NORTH SIDE OF CAVERN (FOR FUTURE CONNECTION) OPTION UNDER REVIEW FROM GEOTECH

  5. AHU-01 Configuration - Floor Level Vertical MONORAIL BEAM (8m) BSI PREFERRED OPTION AHU IS ACCESSED FROM LOW LEVEL AND SUPPLY DUCT IS ON NORTH SIDE OF CAVERN (FOR FUTURE CONNECTION) OPTION UNDER REVIEW FROM GEOTECH

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend