Duvauchelle Wastewater Project Overview of Scheme Options
Presentation to the Ngāi T ahu Parties Thursday 20th S eptember 2018
Duvauchelle Wastewater Project Overview of Scheme Options - - PowerPoint PPT Presentation
Duvauchelle Wastewater Project Overview of Scheme Options Presentation to the Ng i T ahu Parties Thursday 20 th S eptember 2018 Consent History Plant commissioned in 1985 Current short term consent granted 31 J anuary 2011
Presentation to the Ngāi T ahu Parties Thursday 20th S eptember 2018
anuary 2023
therefore harbour discharge will be very difficult to consent
13/ 12/ 2016 2
13/ 12/ 2016 4
Control (no irrigation)
440 mm/yr 825 mm/yr 1650 mm/yr
2 4 6 8 10 12 14 D control D 440 D 825 D 1650 A control A 825 Dry matter production (t/ ha/ yr equiv.)
Wastewater accelerates pasture growth
Native Tree Growth Trial using Duvauchelle Treated Wastewater Lincoln University October 2014 T
Drainage Class Operating Regime Drainage Area (ha)
Good All year Good 5.0 Moderate S ummer + shoulder only Moderate 2.5 Poor S ummer only Poor 3.4 T
10.9
Option Rough Order Capital Cost
Options 1 - 3 $4.0M - $5.0M Option 4 $3.3 - $4.2M