SLIDE 7 11/7/2011 7
Adaptive Management Approach
An adaptive management approach should be adopted now, whereby the new defence structures are built with their foundations and layout designed to allow them to be raised in due course, if necessary. Ongoing monitoring and maintenance will deal with risks such as settlement of or damage to embankments The versatility to allow the defences to be raised in the future, for whatever reason, would ensure that the scheme will provide a 1 in 200 year standard for at least the next 50 years.
2007‐2009 Statutory Planning Process (submission of EIS to ABP and granting of planning permission) 2009‐2010 Funding Approval (WSIP 2001‐2012 and Cost benefit analysis for OPW) 2010‐2011 Tendering and Procurement of Contractor
2012‐2014 Construction And Protection of Business and Residents
Building Blocks of Clontarf Flood Defence 2002 Tidal Flooding event event 2003‐2005 Dublin Coastal Flood Protection Project (Outline Design) 2005‐2007 Detailed Design Process
g g p g p
Views when walking along roadway Uninterrupted view Obstructed view area subject to severe flooding post 2002 Partially interrupted view
100m 400m
West of Bath 1200m Baths to Vernon Av 700m East of Vernon Av 1100m Location May 2006 Height EIS Design 2007 Height Design Review 2011 Height Max Min Av Max Min Av Max Min Av W f B h 8 8 8 West of Baths (1200m) 1.44 0.3 1.03 2.58 0.85 1.75 1.59 0.45 1.18 Baths to Vernon Av (700m) 1.82 0.82 1.41 2.75 1.32 2.09 2.17 1.02 1.71 East of Vernon Av (1100m) 1.15 0.51 .76 1.8 1.01 1.44 1.5 0.71 1.11 Lower Level of mounds recommended in Design Review (November 2011) compared to An Bord Pleanala Approved Scheme
Next Steps