OLD ISSUES

  • Efficiency improvements are needed
  • Maintenance time is too large
  • Need feedback on program balance.

Rebalance from 40% Capability, 20% Quality, 10% Reproducibility, 10% Stability, 20% Photon?

  • Program goals are out of date
  • TTO
  • Special setups
  • LCLS2 studies
slide-3
SLIDE 3

Run 12

AS OF 1/5/16

Run 12

AS OF 2/8/16

Update on Time Usage

slide-4
SLIDE 4

RECENT SPECIAL SETUPS

Start Setup Experiment Hours 12/1/15

HXRSS config setup for 5.5 7keV, edge measurements for MEC -15 deg L3

7 1/10

Soft X-ray config setup for LK30- Stohr

LK30 23 1/19

2-color, 2-pulse for LK20 8929eV and 9029eV, Marinelli

LK20 23 1/26

2-color, Delta, 700 eV, Lutman, Nuhn et al. beam to SXR

IH-Sci Moeller 15 2/9

2 pulse, high pulse energy config

LI15 8 2/10

SXRSS config setup for LK48, Bohler, Ops setup 640 eV, narrow band low jitter

LK48 9

slide-5
SLIDE 5

From expt. logs: Jan 15 LK30 Stohr, Seeded and Delta 710 eV Jan 21 LK20 Seidler, 9 keV, 2 color (twin bunch) Jan 28 IH Sci. Moeller, 2 color Delta 700 eV Feb 11 LK48 Yano, Soft seeding 640 eV Feb 19 LJ15 Berrah, Low energy 300 eV, and maybe 2-color at 480 eV From run 12 parameters spreadsheet: Feb 28 LJ69 Kirian, 6-11 keV, 2-color (assuming twin bunch?) From run 13 scheduling notes spreadsheet: Apr 15 LL32 Monaco, seeded 7.9 keV Apr 21 LL84 Nass, 7.7 keV 2-color (assuming twin bunch?) May 05 LL20 Fletcher, 9-12.82 keV SASE and Seeded May 13 LM23 Seaberg, 2-bunch (25 nS separation) Jun 18 LM20 Schreck, 2-pulse, 2-color, Oxygen edge, (twin bunch with soft chicane delay and tricks) 900 fs separation! Jun 30 LL25 Fuoss, 8-9 keV, 2-bunch (25+ nS separation) Jul 07 LL13 Dean, 11.2 keV seeded Jul 29 LM18 Schlichting, 2-bunch 2-color (30 nS separation)

slide-6
SLIDE 6

From Run 12 Call for proposals: LCLS is currently developing “two color” opera?ng modes, where pairs of FEL pulses are produced with about 1% photon energy separa?on, in both the hard and soE X-ray regimes. We will accept proposals u/lizing two color opera/on. A polariza?on control undulator is planned to be installed in the LCLS this fall and will provide arbitrarily polarized radia?on with limited intensity in the soE x-ray regime. Please contact the respec?ve instrument e- mail address listed above for updated performance parameters as you prepare your proposal.

slide-7
SLIDE 7
  • To some extent SS benefit both the particular

user and aid the development of a new capability

  • What are the options?
  • 1. provide as needed out of MD time
  • 2. use users time
  • 3. something in between
  • 4. don’t provide or provide fewer
slide-8
SLIDE 8

TTO PROJECT STATUS

Ongoing projects 8 hr MD shifts remaining Estimated completion Dechirper 1 April 2016 SXRSS 2 August 2016 DELTA 1 Mid April 2016 TWIN Bunch 12 December 2016 Total 20

  • At ~1 shift/week, we reach 20 shifts by about August 1, 2016
  • Shutdown 5/17- 6/1
  • Run 13: March 24 - August 9.
  • Run 14: August 10 - Mid December is followed by a six month shutdown