agenda
play

AGENDA Old issues Recent usage Special setups OLD ISSUES - PowerPoint PPT Presentation

AGENDA Old issues Recent usage Special setups OLD ISSUES Efficiency improvements are needed Maintenance time is too large Need feedback on program balance. Rebalance from 40% Capability, 20% Quality, 10% Reproducibility,


  1. AGENDA • Old issues • Recent usage • Special setups

  2. OLD ISSUES • Efficiency improvements are needed • Maintenance time is too large • Need feedback on program balance. Rebalance from 40% Capability, 20% Quality, 10% Reproducibility, 10% Stability, 20% Photon? • Program goals are out of date • TTO • Special setups • LCLS2 studies

  3. Update on Time Usage Run 12 AS OF 2/8/16 Run 12 AS OF 1/5/16

  4. RECENT SPECIAL SETUPS Start Setup Experiment Hours HXRSS config setup for 5.5 7keV, edge 12/1/15 7 measurements for MEC -15 deg L3 Soft X-ray config setup for LK30- 1/10 LK30 23 Stohr 2-color, 2-pulse for LK20 8929eV and 1/19 LK20 23 9029eV, Marinelli 2-color, Delta, 700 eV, Lutman, Nuhn 1/26 IH-Sci Moeller 15 et al. beam to SXR 2/9 LI15 8 2 pulse, high pulse energy config SXRSS config setup for LK48, Bohler, 2/10 LK48 9 Ops setup 640 eV, narrow band low jitter

  5. From expt. logs: Jan 15 LK30 Stohr, Seeded and Delta 710 eV Jan 21 LK20 Seidler, 9 keV, 2 color (twin bunch) Jan 28 IH Sci. Moeller, 2 color Delta 700 eV Feb 11 LK48 Yano, Soft seeding 640 eV Feb 19 LJ15 Berrah, Low energy 300 eV, and maybe 2-color at 480 eV From run 12 parameters spreadsheet: Feb 28 LJ69 Kirian, 6-11 keV, 2-color (assuming twin bunch?) From run 13 scheduling notes spreadsheet: Apr 15 LL32 Monaco, seeded 7.9 keV Apr 21 LL84 Nass, 7.7 keV 2-color (assuming twin bunch?) May 05 LL20 Fletcher, 9-12.82 keV SASE and Seeded May 13 LM23 Seaberg, 2-bunch (25 nS separation) Jun 18 LM20 Schreck, 2-pulse, 2-color, Oxygen edge, (twin bunch with soft chicane delay and tricks) 900 fs separation! Jun 30 LL25 Fuoss, 8-9 keV, 2-bunch (25+ nS separation) Jul 07 LL13 Dean, 11.2 keV seeded Jul 29 LM18 Schlichting, 2-bunch 2-color (30 nS separation)

  6. From Run 12 Call for proposals: LCLS is currently developing “two color” opera?ng modes, where pairs of FEL pulses are produced with about 1% photon energy separa?on, in both the hard and soE X-ray regimes. We will accept proposals u/lizing two color opera/on. A polariza?on control undulator is planned to be installed in the LCLS this fall and will provide arbitrarily polarized radia?on with limited intensity in the soE x-ray regime. Please contact the respec?ve instrument e- mail address listed above for updated performance parameters as you prepare your proposal.

  7. • To some extent SS benefit both the particular user and aid the development of a new capability • What are the options? 1. provide as needed out of MD time 2. use users time 3. something in between 4. don’t provide or provide fewer

  8. TTO PROJECT STATUS 8 hr MD shifts Ongoing projects Estimated completion remaining Dechirper 1 April 2016 SXRSS 2 August 2016 DELTA 1 Mid April 2016 TWIN Bunch 12 December 2016 Total 20 • At ~1 shift/week, we reach 20 shifts by about August 1, 2016 • Shutdown 5/17- 6/1 • Run 13: March 24 - August 9. • Run 14: August 10 - Mid December is followed by a six month shutdown

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend