Toledo Waterways Initiative
TWI…Toledo’s Wet Weather Program Federal consent decree to reduce pollution impacts
- n area waterways from City WWTP and sewers
due to heavy rains
Three action components to TWI
Eliminate WWTP Bypasses Eliminate Known Sanitary Sewer Overflows Reduce and Control Combined Sewer Overflows
4/25/14 B&V - 3
Toledo Waterways Initiative - Dec 2014
Projected total program cost - $521 M
We are ~66% complete. On track $ and schedule
- 1. Eliminate WWTP Bypasses - $135 M
Done! Zero bypasses since 2005
- 2. Eliminate Known Sanitary Sewer Overflows - $71 M
Done 2014! – Two addt’l, Heatherdowns & Arlington under design
- 3. Control Combined Sewer Overflows - $315 M
25 Projects, Design ~ 76% complete, Construction ~34%
10/20/14 Page - 4
LTCP Progress Status Summary – Jan 2015
10/20/14 Page - 5
Map of TWI Projects Currently Under Construction
Ottawa River Storage Facility Dearborn Storage Pipeline
10/20/14 Page - 6
CSO LTCP Construction Schedule & Cost Curve – Dec 2014
10/20/14 Page - 7
LTCP Construction Safety– Dec 2014 Program to Date Summary
- 412,660 hours total
- 5 recordable injuries. 2.4 IIR. Nat. ave. is 3.5
- 2 lost workday injuries. 1.0 LWDI. Nat. ave. is 1.1
10/20/14 Page - 8
Bayview Grit Facility – Thru DEC 2014
10/20/14 Page - 9
Bay View Grit Facility – OCT 2014 Grit Building & West Aerated Grit Tanks
10/20/14 Page - 10
Oakdale Storage Basin –Thru DEC 2014
10/20/14 Page - 11
Oakdale Storage Basin – DEC 2014 Utility Building Interior & Water Supply Piping
10/20/14 Page - 12
Oakdale Storage Basin – DEC 2014 Valve Vault Piping
10/20/14 Page - 13
Oakdale Storage Basin – SEP 2014 Valve Vault – Pump Discharge Piping and Valves
10/20/14 Page - 14
Oakdale Storage Basin – DEC 2014 SE Corner Pond 5D & Utility Building
10/20/14 Page - 15
Oakdale Storage Basin – DEC 2014 Seed & Mulch on North Side of Pond 5D
10/20/14 Page - 16
Oakdale Storage Basin – DEC 2014 Panoramic View of Site Before Seed & Mulch
10/20/14 Page - 17
Dearborn Storage Pipeline – Thru DEC 2014
10/20/14 Page - 18
Dearborn Storage Pipeline – SEP 2014 Excavation for Dewatering Structure
10/20/14 Page - 19
Dearborn Storage Pipeline – DEC 2014 Dewatering Structure – Stone Grading for Bottom Slab
10/20/14 Page - 20
Dearborn Storage Pipeline – DEC 2014 Dewatering Structure Interior Formwork
10/20/14 Page - 21
Dearborn Storage Pipeline – DEC 2014 Dewatering Structure – Setting First 132-inch Wall Pipe
10/20/14 Page - 22
Dearborn Storage Pipeline – DEC 2014 Dewatering Structure – All Three 132-inch Wall Pipes
10/20/14 Page - 23
Dearborn Storage Pipeline – DEC 2014 Shaft in Front Street – ES Interceptor Structure
10/20/14 Page - 24
Dearborn Storage Pipeline – DEC 2014 ES Interceptor Structure Shaft – Finishing Bottom of Shaft
10/20/14 Page - 25
Dearborn Storage Pipeline – DEC 2014 ES Interceptor Structure Shaft – Grouting Operation
10/20/14 Page - 26
Dearborn Storage Pipeline – DEC 2014 ES Interceptor Structure Shaft & Safety Netting
10/20/14 Page - 27
Ottawa River South Storage Facility–Thru DEC 2014
10/20/14 Page - 28
Ottawa River South Storage Facility– DEC 2014 Mobilizing Equipment – Crane Erection
10/20/14 Page - 29
Ottawa River South Storage Facility– DEC 2014 Construction of Laydown Area on East Side
10/20/14 Page - 30
Ottawa River South Storage Facility– DEC 2014 Installation of Silt Fence on North Side
10/20/14 Page - 31
Ottawa River South Storage Facility– DEC 2014 Demolition of the Ball Field Backstop
10/20/14 Page - 32
Ottawa River South Storage Facility– DEC 2014 Clearing of Wooded/Brush Area on N. Side of Manhattan
10/20/14 Page - 33
Ottawa River South Storage Facility– DEC 2014 Installation of Construction Fence Along the East Side
10/20/14 Page - 34
Ottawa River South Storage Facility– DEC 2014 Trench Excavation for Water Main – Blanchard & Manhattan
10/20/14 Page - 35