CPAC Meeting at Bay View WWTP January 26, 2015 A TWI Background & Summary of TWI Construction Status Thru December 31, 2014 Page - 1 4/25/14 Toledo Waterways Initiative TWIToledos Wet Weather Program Federal consent decree


slide-1
SLIDE 1

4/25/14 Page - 1

A TWI Background & Summary of TWI Construction Status Thru December 31, 2014

CPAC Meeting at Bay View WWTP January 26, 2015

slide-2
SLIDE 2

4/25/14 B&V - 2

Toledo Waterways Initiative

 TWI…Toledo’s Wet Weather Program  Federal consent decree to reduce pollution impacts

  • n area waterways from City WWTP and sewers

due to heavy rains

 Three action components to TWI

 Eliminate WWTP Bypasses  Eliminate Known Sanitary Sewer Overflows  Reduce and Control Combined Sewer Overflows

slide-3
SLIDE 3

4/25/14 B&V - 3

Toledo Waterways Initiative - Dec 2014

Projected total program cost - $521 M

We are ~66% complete. On track $ and schedule

  • 1. Eliminate WWTP Bypasses - $135 M

Done! Zero bypasses since 2005

  • 2. Eliminate Known Sanitary Sewer Overflows - $71 M

Done 2014! – Two addt’l, Heatherdowns & Arlington under design

  • 3. Control Combined Sewer Overflows - $315 M

25 Projects, Design ~ 76% complete, Construction ~34%

slide-4
SLIDE 4

10/20/14 Page - 4

LTCP Progress Status Summary – Jan 2015

slide-5
SLIDE 5

10/20/14 Page - 5

Map of TWI Projects Currently Under Construction

Ottawa River Storage Facility Dearborn Storage Pipeline

slide-6
SLIDE 6

10/20/14 Page - 6

CSO LTCP Construction Schedule & Cost Curve – Dec 2014

slide-7
SLIDE 7

10/20/14 Page - 7

LTCP Construction Safety– Dec 2014 Program to Date Summary

  • 412,660 hours total
  • 5 recordable injuries. 2.4 IIR. Nat. ave. is 3.5
  • 2 lost workday injuries. 1.0 LWDI. Nat. ave. is 1.1
slide-8
SLIDE 8

10/20/14 Page - 8

Bayview Grit Facility – Thru DEC 2014

slide-9
SLIDE 9

10/20/14 Page - 9

Bay View Grit Facility – OCT 2014 Grit Building & West Aerated Grit Tanks

slide-10
SLIDE 10

10/20/14 Page - 10

Oakdale Storage Basin –Thru DEC 2014

slide-11
SLIDE 11

10/20/14 Page - 11

Oakdale Storage Basin – DEC 2014 Utility Building Interior & Water Supply Piping

slide-12
SLIDE 12

10/20/14 Page - 12

Oakdale Storage Basin – DEC 2014 Valve Vault Piping

slide-13
SLIDE 13

10/20/14 Page - 13

Oakdale Storage Basin – SEP 2014 Valve Vault – Pump Discharge Piping and Valves

slide-14
SLIDE 14

10/20/14 Page - 14

Oakdale Storage Basin – DEC 2014 SE Corner Pond 5D & Utility Building

slide-15
SLIDE 15

10/20/14 Page - 15

Oakdale Storage Basin – DEC 2014 Seed & Mulch on North Side of Pond 5D

slide-16
SLIDE 16

10/20/14 Page - 16

Oakdale Storage Basin – DEC 2014 Panoramic View of Site Before Seed & Mulch

slide-17
SLIDE 17

10/20/14 Page - 17

Dearborn Storage Pipeline – Thru DEC 2014

slide-18
SLIDE 18

10/20/14 Page - 18

Dearborn Storage Pipeline – SEP 2014 Excavation for Dewatering Structure

slide-19
SLIDE 19

10/20/14 Page - 19

Dearborn Storage Pipeline – DEC 2014 Dewatering Structure – Stone Grading for Bottom Slab

slide-20
SLIDE 20

10/20/14 Page - 20

Dearborn Storage Pipeline – DEC 2014 Dewatering Structure Interior Formwork

slide-21
SLIDE 21

10/20/14 Page - 21

Dearborn Storage Pipeline – DEC 2014 Dewatering Structure – Setting First 132-inch Wall Pipe

slide-22
SLIDE 22

10/20/14 Page - 22

Dearborn Storage Pipeline – DEC 2014 Dewatering Structure – All Three 132-inch Wall Pipes

slide-23
SLIDE 23

10/20/14 Page - 23

Dearborn Storage Pipeline – DEC 2014 Shaft in Front Street – ES Interceptor Structure

slide-24
SLIDE 24

10/20/14 Page - 24

Dearborn Storage Pipeline – DEC 2014 ES Interceptor Structure Shaft – Finishing Bottom of Shaft

slide-25
SLIDE 25

10/20/14 Page - 25

Dearborn Storage Pipeline – DEC 2014 ES Interceptor Structure Shaft – Grouting Operation

slide-26
SLIDE 26

10/20/14 Page - 26

Dearborn Storage Pipeline – DEC 2014 ES Interceptor Structure Shaft & Safety Netting

slide-27
SLIDE 27

10/20/14 Page - 27

Ottawa River South Storage Facility–Thru DEC 2014

slide-28
SLIDE 28

10/20/14 Page - 28

Ottawa River South Storage Facility– DEC 2014 Mobilizing Equipment – Crane Erection

slide-29
SLIDE 29

10/20/14 Page - 29

Ottawa River South Storage Facility– DEC 2014 Construction of Laydown Area on East Side

slide-30
SLIDE 30

10/20/14 Page - 30

Ottawa River South Storage Facility– DEC 2014 Installation of Silt Fence on North Side

slide-31
SLIDE 31

10/20/14 Page - 31

Ottawa River South Storage Facility– DEC 2014 Demolition of the Ball Field Backstop

slide-32
SLIDE 32

10/20/14 Page - 32

Ottawa River South Storage Facility– DEC 2014 Clearing of Wooded/Brush Area on N. Side of Manhattan

slide-33
SLIDE 33

10/20/14 Page - 33

Ottawa River South Storage Facility– DEC 2014 Installation of Construction Fence Along the East Side

slide-34
SLIDE 34

10/20/14 Page - 34

Ottawa River South Storage Facility– DEC 2014 Trench Excavation for Water Main – Blanchard & Manhattan

slide-35
SLIDE 35

10/20/14 Page - 35

Questions??