928 and 936 McMillan Avenue Stakeholder Meeting #2 November 22 nd , 2018 Overview Who are we? What would we like to do? Planning Context Planning Process What We Heard Preliminary Concepts Engagement Timeline Next


slide-1
SLIDE 1

928 and 936 McMillan Avenue

Stakeholder Meeting #2

November 22nd, 2018

slide-2
SLIDE 2

Overview

  • Who are we?
  • What would we like to do?
  • Planning Context
  • Planning Process
  • What We Heard
  • Preliminary Concepts
  • Engagement Timeline
  • Next Steps
  • Questions?
slide-3
SLIDE 3

Who are we? What would we like to do?

Progressive Real Estate, a local Winnipeg developer, is hoping to submit a rezoning application to eventually develop the parcel in question as a mixed-use development. Progressive recognizes that nearby residents are interested in the development of this parcel, particularly in terms of potential land uses and housing types. Landmark Planning & Design has been retained to lead this engagement process and planning process. We will introduce the planning process, timeline, and anticipated next steps. We would also like to receive your input, and address any concerns or questions you may have.

slide-4
SLIDE 4

Site Context

The 12,800 sq. ft. site is located at 928 and 936 McMillan Avenue (at Stafford).

  • Eastern boundary: Stafford Street
  • Southern boundary: Rear lane (Rexall

Parking Lot)

  • Western boundary: Existing homes on

McMillan Avenue)

  • Northern boundary: McMillan Avenue
slide-5
SLIDE 5

Our Winnipeg – Planning Context

OurWinnipeg is the overall development plan for Winnipeg. Every piece of land in the City is designated for some form of land use. OurWinnipeg designates this area of town as a “Mature Community”. The plan describes Mature Communities as:

  • Winnipeg’s early suburbs, mostly developed

before the 1950s. Key features are a grid road network with back lanes and sidewalks, low to moderate densities, and a fine grained mix of land uses along commercial

  • streets. Many of these communities have a

full range of municipal services.

  • These communities present some of the

best opportunities for infill development.

slide-6
SLIDE 6

Our Winnipeg – Policy Context

These are policies that support or promote a project like this one:

  • Provide a range of housing options to accommodate various incomes,

household types, abilities, and stages of life

  • Promote compact urban form and manage the extension of municipal

services for new growth

  • Enable the intensification of land-uses through the development application

process

  • Support new developments that are contiguous with existing developments to

minimize the spatial use of land and the extension of services

  • Accommodate intensification within existing communities in a sensitive

manner that recognizes the existing form and the character of its location

  • Support the creation of a range of sizes, forms and tenures of housing
  • Support contextually-sensitive infill development that builds complete and

inclusive communities

  • Encourage mixed use developments
slide-7
SLIDE 7

Multi-Family and Commercial Context

There are several multi-family and commercial buildings in the immediate area, as highlighted in red.

slide-8
SLIDE 8

Multi-Family and Commercial Zoning Context

In terms of zoning, the parcels in red are zoned for commercial, while the parcels in brown are zoned as multi- family residential.

slide-9
SLIDE 9

Multi-Family and Mixed-Use Context

These are images of multi-family and mixed-use developments in the neighbourhood:

slide-10
SLIDE 10

Transit Service

The site is serviced by Transit routes, with four routes within a two-minute walk of the site:

  • Route 18
  • Route 29
  • Route 68
  • Route 36
slide-11
SLIDE 11

Public Consultation and Stakeholder Engagement

First meetings with adjacent residents

  • September 6th
  • Introduce the planning process,

timeline, general project idea, and anticipated next steps

  • Receive input

Second meetings with adjacent residents

  • Today (November 22nd)
  • Introduce initial design concept
  • Address any concerns or

questions raised at first meeting

slide-12
SLIDE 12

Public Consultation and Stakeholder Engagement

Third meeting with adjacent residents and Public Open House for Crescentwood residents

  • December 19th
  • Introduce revised concept
  • Show how feedback was considered and

addressed

  • Receive further input
  • Outline approvals process
slide-13
SLIDE 13

What We Heard in September:

  • Parking needs to be considered
  • Try to preserve trees
  • Development should be pedestrian-friendly; maintain the street edge
  • Walkability in the neighbourhood is key
  • Additional traffic in the alley is a concern; can be hard to turn onto

Stafford

  • Building should be aesthetically pleasing; fit with existing context
  • Appropriate mixed-use would be acceptable (residential, office,

commercial)

  • Would like commercial frontage on Stafford
slide-14
SLIDE 14

Preliminary Design Concept

slide-15
SLIDE 15

Preliminary Design Concept

slide-16
SLIDE 16

Preliminary Design Concept

slide-17
SLIDE 17

Next Steps

The next steps in the planning process are likely to include:

  • Review comments and feedback
  • Continue to work with City Departments
  • Finalize design concept
  • Host follow-up meetings with adjacent residents (December 19th)
  • Host a community open house on December 19th (Corydon Community Centre)
  • Make an application to rezone the land (in 2019)

Thank you for attending today’s session. Your input is important to our planning process.

slide-18
SLIDE 18

Thank You! Questions?

If you have any further questions, please contact Brendan Salakoh at info@landmarkplanning.ca or 204-453-8008. Thank you!