BGE Frankford Avenue Walking Path

Frankford Avenue Community Information Update

Tuesday, September 1, 2020

1

slide-2
SLIDE 2

BGE Frankford Avenue Walking Path Project Background

  • Walking path begins at Frankford Avenue and Force Road and connects at Sinclair Lane.
  • Walking path has been in BGE plans for 15+ years and is located within BGE Right-of-Way (ROW).
  • BGE has met with the community and community leadership over the past several years about the

walking path.

  • In early May 2020, letters were mailed out to the community to inform them that the installation of the

walking path would begin in mid-May. The walking path installation was completed in mid-June.

  • Updated project signs have been installed along the ROW with project contact information.
  • As of today, wildflower planting beds are scheduled to be installed along the ROW in late

September/early October 2020.

  • Working with Baltimore City, the options for the path restricted the use of impervious surface. In

addition, a paved or concrete surface would not allow BGE to maintain its underground equipment in this area.

2

slide-3
SLIDE 3

BGE Frankford Avenue Walking Path Overhead Rendering

  • f Fall 2020 Plantings

3

slide-4
SLIDE 4

BGE Frankford Avenue Walking Path Project Phase I: Install Gravel Walking Path

4

slide-5
SLIDE 5

BGE Frankford Avenue Walking Path Project Phase I: Install Gravel Walking Path

5

slide-6
SLIDE 6

BGE Frankford Avenue Walking Path Project Phase I: Install Gravel Walking Path

6

slide-7
SLIDE 7

BGE Frankford Avenue Walking Path Wildflower Plantings

  • BGE is listening to the community and being responsive to concerns.
  • Instead of planting flowers along the entire length of the walking path, we

have now separated the plantings into individual planting beds.

  • In response to safety concerns, we have changed the flower bed mix so that

most plantings won’t be above three feet in height.

  • We will use a seed drill or similar ‘no-till’ method to plant wildflower mix.
  • Community should expect wildflower maturity in three to five years.

7

slide-8
SLIDE 8

BGE Frankford Avenue Walking Path Wildflower Seed Mix Proposed Wildflower Seed Mix

AS OF 06.24.2020

Lanceleaf Coreopsis - 1-2 ½ft Blackeyed Susan - 1-2ft Partridge Pea, PA Ecotype - Up to 2.9ft Common Yarrow - up to 3ft

8

slide-9
SLIDE 9

BGE Frankford Avenue Walking Path Proposed Wildflower Seed Mix

AS OF 06.24.2020

Showy Milkweed - up to 3.3ft Butterfly Milkweed - 1- 2 ½ft Aromatic Aster, PA Ecotype - Up to 3.3ft

Wildflower Seed Mix

9

slide-10
SLIDE 10

BGE Frankford Avenue Walking Path Proposed Wildflower Seed Mix

AS OF 06.24.2020

Yellow False Indigo - up to 3.3ft Nodding Bur Marigold, PA Ecotype Up to 3.3ft Cornflower (Bachelors Button) - 3.9ft Purple Prairie Clover - Up to 3.9ft

Wildflower Seed Mix

10

slide-11
SLIDE 11

BGE Frankford Avenue Walking Path Proposed Wildflower Seed Mix

AS OF 06.24.2020

Annual Gaillardia (Indian Blanket) - 2ft Perennial Gaillardia (Blanket flower) - 2-3ft Scaly Blazing Star, VA Ecotype -Up to 3.3ft Hairy Beardtongue - Up to 2.9ft

Wildflower Seed Mix

11

slide-12
SLIDE 12

BGE Frankford Avenue Walking Path BGE Right-of-Way Maintenance

  • BGE will be solely responsible for maintenance.
  • Maintenance will include mowing around the perimeter of the wildflower planting beds

and around tower structures.

12

slide-13
SLIDE 13

BGE Frankford Avenue Walking Path

Q & A Discussion