30 abby road
play

30 Abby Road Resource Consent Application Hearing Presentation of - PowerPoint PPT Presentation

30 Abby Road Resource Consent Application Hearing Presentation of Evidence related to Stormwater Dav David Arse Arseneau, P.Eng. Site conditions Site conditions Site conditions Existing overland flow path High point on 30 Abby Road overflow


  1. 30 Abby Road Resource Consent Application Hearing Presentation of Evidence related to Stormwater Dav David Arse Arseneau, P.Eng.

  2. Site conditions

  3. Site conditions

  4. Site conditions Existing overland flow path High point on 30 Abby Road overflow elevation ~93.33 m property ~ 93.52 m to 93.60 m (excluding existing overland flow path), yellow arrows indicate flow direction Low point on Abby Road Greyscale pixels indicate that creates flooding elevation (2018 PNCC DEM), lighter colour indicates higher elevation

  5. Site conditions Min. elevation of ground on 30 Abby Existing overland flow path Road property ~ 93.52 m to 93.60 m (excluding existing overland flow overflow elevation ~93.33 path) m Existing overland flow path to PNCC Reserve north of 30 Abby Road Existing low point at northern terminus of Abby Road (on 30 Abby Road property) ~92.97 m

  6. Site conditions Existing overland flow path overflow elevation ~93.33 m Existing overland flow path to PNCC Reserve north of 30 Abby Road Sump/drain, not clear if connected to PNCC reticulation Existing low point at northern terminus of Abby Road (on 30 Abby Road property) ~92.97 m

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend