US 281 AT BASSE ROAD AND JONES MALTSBERGER ROAD SAN ANTONIO Open - - PowerPoint PPT Presentation

us 281
SMART_READER_LITE
LIVE PREVIEW

US 281 AT BASSE ROAD AND JONES MALTSBERGER ROAD SAN ANTONIO Open - - PowerPoint PPT Presentation

US 281 AT BASSE ROAD AND JONES MALTSBERGER ROAD SAN ANTONIO Open House Alamo Heights United Methodist Church October 18, 2018 825 E Basse Road 5:00 p.m. 7:00 p.m. San Antonio, Texas 78209 October 18, 2018 US 281 at Basse Road and


slide-1
SLIDE 1

US 281 at Basse Road and Jones Maltsberger Road

US 281

AT BASSE ROAD AND JONES MALTSBERGER ROAD SAN ANTONIO

October 18, 2018 Open House October 18, 2018 5:00 p.m. – 7:00 p.m. Alamo Heights United Methodist Church 825 E Basse Road San Antonio, Texas 78209

slide-2
SLIDE 2

US 281 at Basse Road and Jones Maltsberger Road

Project Overview

  • Collaborative effort between TxDOT and

the City of San Antonio

  • Two interchange improvements
  • Provide full access to US 281 from Basse

Road by adding Northbound entrance ramp and Southbound exit ramp and partial Displaced Left Turn (DLT)

  • Reconstruct Jones Maltsberger Road

interchange to a Diverging Diamond Interchange (DDI)

  • All construction would occur within

existing State Right-of-Way

2

slide-3
SLIDE 3

US 281 at Basse Road and Jones Maltsberger Road

–Community Impacts –Historic Resources –Archeological Resources –Air Quality –Traffic Noise –Waters of the U.S./Wetlands –Floodplains –Threatened and Endangered Species –Hazardous Materials

3

Environmental Studies

slide-4
SLIDE 4

US 281 at Basse Road and Jones Maltsberger Road

Project Next Steps

Schematic Design and Preliminary Environmental Study Host Open House Consider Public Comments and Update Schematic Design Final Design & Environmental Clearance Construction

FALL 2017 TBD TBD FALL 2018 TODAY

4

slide-5
SLIDE 5

US 281 at Basse Road and Jones Maltsberger Road

Environmental Constraints

5

slide-6
SLIDE 6

US 281 at Basse Road and Jones Maltsberger Road

Traffic Improvements: US 281 at Basse Road

  • Adds access to and from Basse Road

to US 281

  • Provides protected movements from

exit ramps and at adjacent Jones Maltsberger Road intersection to improve safety

  • Consolidates existing northbound

exits and southbound entrance ramps to and from Basse Road to US 281

  • US 281 northbound exit to east

Basse Road improvement reduces expected wait time by over 3 minutes (Design Year 2042)

New Access with Removal of Cloverleaf Ramps

6

slide-7
SLIDE 7

US 281 at Basse Road and Jones Maltsberger Road

Traffic Improvements: US 281 at Jones Maltsberger Road

  • Wait times at Jones Maltsberger Road intersections are reduced by

60 seconds in the afternoon and Saturday peak periods with Diverging Diamond Interchange (DDI) compared to Conventional Improvements (Turn Bays, Capacity, Signal Timing)

Intersection Measure of Effectiveness Existing (2017) Conventional Improvements (2042) Diverging Diamond Interchange (2042) Afternoon Saturday Afternoon Saturday Afternoon Saturday

Jones Maltsberger Rd at US 281 NBFR Delay (s) 37.9 32.4 102 99 32 31 Jones Maltsberger Rd at US 281 SBFR Delay (s) 173.2 75.6 93 83 24 26

7

slide-8
SLIDE 8

US 281 at Basse Road and Jones Maltsberger Road

Project Funding

Funding for Project Construction is not currently identified Estimated Construction Cost:

  • Basse Road: $6.8 Million
  • Jones Maltsberger Road: $5.0 Million

8

slide-9
SLIDE 9

US 281 at Basse Road and Jones Maltsberger Road

Provide Your Comments

1. 1. Complete a wr written com comment ca card 2. 2. Email ail comments t to: US281_B _Basse sse_Jo Jone nesM sMaltsb tsberger@e @emailatg tg.com 3. 3. Provide verbal com comments on

  • nsite to
  • cou

court reporter 4. 4. Mai Mail comments t to: Opti tions s for Comment nting ng

ATG Allian ance T Tran ansportation G Group Attn: : Eric G Galindo, P , P.E. E. 11500 Me Metric B Blvd vd, Suite 1 150 Austi tin, n, T TX 78758

Deadl dline f for comme mments : : Novemb mber er 2, 2 2018

  • For more in

informat ation p pleas ase vis isit it www.txdot.gov and d use k e keywords “U “US S 281 B Basse e Road” d”

9

slide-10
SLIDE 10

US 281 at Basse Road and Jones Maltsberger Road

Closing Remarks

Thank Y You for Your Parti ticipati tion!

The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated December 16, 2014, and executed by FHWA and TxDOT 10