  1. 2018 Municipal Infrastructure Capital Project Highlights 1

  2. Road Projects ($6.1 MIL ) Reconstruction ($5.6 MIL)  St. Peter St. Reconstruction  (Chisholm St. - 11 th St) includes Storm & WM  West River St. Reconstruction  (Notre Dame to Optimist) includes Roundabout  Amy Croft – Road Improvements  (Manning to Commercial) includes Traffic Signals Resurfacing ($140 K)  Elmgrove Dr. – Surface Asphalt  Silver Creek Industrial Drive 2

  3. Surface Treatment Roads ($410 K ) Third Lift Applications  Lakeshore Rd. 308 (Kent Road 1 to Gracey)  Walls Road (Puce Road 1 to LR113)  Lakeshore Rd 310 (Gracey to Richardson)  Lakeshore Rd 101 3

  4. BRIDGE REHABILITATIONS ( $315 K )  5 Structures at various locations 4

  5. Watermain Construction/Replacement ($ 2.1 MIL )  St. Peter Street (Included with Road Construction)  Rourke Line ( CR22 to Caille Ave )  Gracey SdRd Crystal Beach to LR302)  Tecumseh Rd. ( Gracey to 700m West) 5

  6. Municipal Drain Projects ( $1.0 MIL)  Goatbee Municipal Drain  Hogan Municipal Drain  Third Line & Quennville Municipal Drain Wastewater Projects  Oakwood Trunk Sewer Extension - Puce River Crossing ( CR25 to West Puce Rd ) 6

  7. Sidewalk/Pathway Projects ($1.75MIL)  Sidewalk Lifecycle Replacements  Main St. (Hwy 77) Sidewalk ( Coincide - MTO Project )  CR22 Pathway (Puce to IC Roy) (Coincide - Essex Cnty Project)  ATC Asphalt Pathway (Renaud to Puce)  Millen Park Pathway  Old Tecumseh Rd Trail (CR22 to Wallace Line) (Coincide - Essex Cnty Project) 7

  8. Park & Facilities Projects  Comber Centre Roof Replacement  Pedestrian Bridge Deck Rehab  ATC Facility site enhancements  Park Playground Replacements  Deep Well Park Garbage Receptacles 8

  9. Questions? Thank you 9

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.