2018 Capital Project Board of Education Meeting 0 5 . 0 7 . 2 0 1 9 - - PowerPoint PPT Presentation

2018 capital project
SMART_READER_LITE
LIVE PREVIEW

2018 Capital Project Board of Education Meeting 0 5 . 0 7 . 2 0 1 9 - - PowerPoint PPT Presentation

I C H A B O D C R A N E C E N T R A L S C H O O L D I S T R I C T 2018 Capital Project Board of Education Meeting 0 5 . 0 7 . 2 0 1 9 Agenda 1. Project Status Update 2. Preliminary Designs 3. Next Steps Project Status Update Overview of


slide-1
SLIDE 1

I C H A B O D C R A N E C E N T R A L S C H O O L D I S T R I C T

2018 Capital Project

Board of Education Meeting

0 5 . 0 7 . 2 0 1 9

slide-2
SLIDE 2

Agenda

  • 1. Project Status Update
  • 2. Preliminary Designs
  • 3. Next Steps
slide-3
SLIDE 3

Project Status Update

slide-4
SLIDE 4

3 Phases of a Project:

  • Schematic Design
  • Design Development
  • Construction Documents

Overview of Project Phases

slide-5
SLIDE 5

3 Phases of a Project:

  • Schematic Design
  • Perform field visits to existing buildings
  • Conduct investigative testing (asbestos, site survey, etc.)
  • Conduct programming meetings
  • Develop preliminary design concepts
  • Regular updates to Project Committee
  • Design Development
  • Construction Documents

Overview of Project Phases

slide-6
SLIDE 6

3 Phases of a Project:

  • Schematic Design
  • Design Development
  • Select materials and building components
  • Develop plans and specifications for all disciplines
  • Construction Documents
  • Further develop plans and specifications to create bid-ready documents
  • Submit to NYSED for review and approval

Overview of Project Phases

slide-7
SLIDE 7

Preliminary Designs

slide-8
SLIDE 8

High School- Areas of Work

Science Technology & Engineering (Includes Building Addition) Math Arts Guidance & Counseling Suite Security Improvements at Main Entry

slide-9
SLIDE 9

Science

Biology Biology Biology Physics Chemistry Chemistry Earth Science Earth Science Earth Science Renovation of these 2 rooms will be a Bid Alternate

slide-10
SLIDE 10

Science

slide-11
SLIDE 11

T echnology & Engineering

2,860 sq.ft. Building Addition

slide-12
SLIDE 12

T echnology & Engineering

Transportation & Materials Shop Wood Shop Innovation Lab #1 Innovation Lab #2 CNC Fabrication Math Classroom

Data Utility Kitchen Storage Custodial/ Elec Closet

slide-13
SLIDE 13

T echnology & Engineering

slide-14
SLIDE 14

T echnology & Engineering

slide-15
SLIDE 15

Arts

Art Classroom Art Classroom Art Classroom Kiln Room Dark Room Computer Lab Library

Distance Learning

slide-16
SLIDE 16

Arts

slide-17
SLIDE 17

Math

Transportation & Materials Shop Wood Shop Innovation Lab #1 Innovation Lab #2 CNC Fabrication Math Classroom Math Classroom Math Classroom Math Classroom Math Classroom Math Classroom Math Classroom CSE Break Rm

slide-18
SLIDE 18

Math

slide-19
SLIDE 19

Counseling Suite

Guidance Office Guidance Office Guidance Office Conference Rm/ Social Worker Office Psych Office

slide-20
SLIDE 20

Middle School- Areas of Work

Classroom Pods Music Security Improvements at Main Entry Gymnasium Cafeteria

slide-21
SLIDE 21

Classroom Pod 1

Existing Proposed

slide-22
SLIDE 22

Classroom Pod 2

Existing Proposed

slide-23
SLIDE 23

Gymnasium

Large Gymnasium Boys Locker Room Girls Locker Room Storage Storage Small Gymnasium

slide-24
SLIDE 24

Gymnasium

Large Gymnasium Boys Locker Room Girls Locker Room Storage Storage Small Gymnasium

slide-25
SLIDE 25

Gymnasium

Gymnasium Storage Storage Boys Locker Room Girls Locker Room Storage

slide-26
SLIDE 26

Gymnasium

Storage Storage Boys Locker Room Girls Locker Room Storage Shown: Main court use, Bleachers extended

slide-27
SLIDE 27

Gymnasium

Storage Storage Boys Locker Room Girls Locker Room Storage Shown: Side court use, Bleachers collapsed

slide-28
SLIDE 28

Gymnasium

slide-29
SLIDE 29

Sitework- Connection Road

Area shown has been submitted to NYSED, with roof replacement at HS

slide-30
SLIDE 30

Next Steps

slide-31
SLIDE 31
  • Schematic Design Phase
  • Submit SD Report

This week

  • District to review and approve SD report

Late May 2019

  • Turner to develop SD estimate

Early June 2019

  • Design Development Phase

May – August 2019

  • District to review and approve DD documents

September 2019

  • Turner to develop DD estimate

September 2019

  • Construction Documents Phase

August – December 2019

  • Submit to NYSED (Third Party Review)

December 2019

  • Turner to develop final estimate

January 2020

  • Anticipated NYSED approval

April 2020

Next Steps

slide-32
SLIDE 32