SLIDE 10 2018 BRR Capital Projects
Buildings Issues
2018 2019 2020 2021 2022 2023 Grand Totals
903,421 $ 445,000 $ 235,000 $ 145,000 $ 95,000 $ 95,000 $
Recommended Accruals; Manufacture: Equip $190k; Roof $101k; Carpet $117k; Security $100k = $508k 508,000 $ 508,000 $ 508,000 $ 508,000 $ 508,000 $ 508,000 $ 347,000 $ 347,000 $ 347,000 $ 347,000 $ 347,000 $ 347,000 $
Primary Buildings
Unfunded Equipment Failures History of variouis component failures, taken from Facility Operations, inlcudes Aging Courthouse HVAC units that we anticipate failures 75,000 75,000 75,000 75,000 75,000 75,000 Givens Street Switch-Box Phase 2 of Givens electrical failure is to install required master switch-box 40,275 Jail-Campus fuel tank Underground fuel tank to be decommissioned, replaced with above-ground 38,146 County Boilers With the age of the existing units over the useful life. We need replacement 10,000 10,000 10,000 10,000 10,000 10,000 Campus HVAC Aging units in both old & new building will need major component replacement on-going, 24/7 operatoin requires some pro-active replacements 10,000 10,000 10,000 10,000 10,000 10,000 County Wide Door Control Electronic Door Control System (orig $200k estimate) 20,000 20,000 20,000 20,000 County Fire Panel Upgrades Existing wired fire panels are not being supported in future and vendors are going to wireless units. 15,000 15,000 15,000 Courthouse Designated Fire Compartments City of Port Orchard requirement, to be accomplished incrementally 30,000 30,000 30,000 30,000 Seeling of Brick and Cement Exterios 2018: Juvenile is oldest $50k: Jail phase-1 joint of old/new building $40k 2019: Jail exterior $100k; Admin Building $60k 90,000 160,000 Juvenile HVAC and Mother- Board HVAC is 16+ yrs old, Mother Board showing issues, replacement aligns with Campus systems, $50k completed 2017, phase-2 2018 $75k 75,000 Juvenile Door Control Original target 2015 $400k; $100k 2017 (Gen Fund); $300k 2018 300,000 Jail Elevators 1 very old, two newer, old unit "failing", one completed 2017 100,000 PSE LED PSE has available grant monies up to 45% of materials, labor and installation, buget is net expense 25,000 25,000 25,000 Administration 2018 Roof Garden improvement-repairs,WSU to assess and Roof Repair 2020 anticipate major HVAC component replacement 50,000 50,000 Campus Elevators Courthouse, 1st to 2nd floor only, ancient (no parts available) 100,000 Primary Building Category Totals 878,421 $ 445,000 $ 235,000 $ 145,000 $ 95,000 $ 95,000 $
Secondary Buildings
Log Church Demolish existing structure. Install 7-8 parking spaces. Safety issues, parking for SAU Employees 25,000 Secondary Building Category Totals 25,000 $
One-Time Concerns
Courthouse Fire Dept. officials have notified us that any future expansions or changes to the Courthouse will require the building be sprinkled. 500,000 Consolidated old panel in Jury Holding into the new elevator panel. Entire system would need to be upgraded when/if the building is sprinkled. Fire panel only modified/upgraded 2014 $6k (not the complete system). 100,000 Recommended Accruals; Kitsap: Equip $127k; Roof $67k; Carpet $78k, Security $75k = $347k