Start Year Construction Section Actual*/Estimated Cost 2010 S1 (Galloway & BOV Bridges) $ 9.8 million* 2012 Advanced ITS $ 3.4 million* 2012 Ford Ave. Bridge on I-95 $ 5.8 million* 2012 S2 (Richlieu Road Bridge) $ 7.9


slide-1
SLIDE 1

Start Year Construction Section Actual*/Estimated Cost 2010 S1 (Galloway & BOV Bridges) $ 9.8 million* 2012 Advanced ITS $ 3.4 million* 2012 Ford Ave. Bridge on I-95 $ 5.8 million* 2012 S2 (Richlieu Road Bridge) $ 7.9 million* 2012 Wetland/Stream Mitigation $ 1.1 million* 2013 B (includes ORT @ DRB) $ 61.4 million* 2014 D10 (includes I-95-E) $149.2 million* 2015 Mainline ITS (Multiple) $ 12.0 million 2015 D20 (includes I-95-F) $120.0 million

slide-2
SLIDE 2
slide-3
SLIDE 3
slide-4
SLIDE 4

Go Goal: al: To To in incr crease ease the % o % of lane ne mil iles es to

  • a min

inim imum um LOS ‘D’ in urban areas

slide-5
SLIDE 5
  • Ov

Overhead rhead Br Brid idges ges ne need d Repl placed aced Fir irst st

slide-6
SLIDE 6
slide-7
SLIDE 7
slide-8
SLIDE 8
  • 70 mph

ph Bl Blue ue Mou

  • untain

ntain Tu Tunn nnel el to

  • Mor
  • rgantown

gantown In Int.

  • 70 mph

ph systemwide emwide Spr prin ing g 2015

slide-9
SLIDE 9
slide-10
SLIDE 10
slide-11
SLIDE 11
slide-12
SLIDE 12
slide-13
SLIDE 13
slide-14
SLIDE 14
slide-15
SLIDE 15
slide-16
SLIDE 16
slide-17
SLIDE 17
slide-18
SLIDE 18
slide-19
SLIDE 19

CM/C /CI I Tu Tuscarora arora Tu Tunn nnel el Rehab hab

Fee: $ 6,500, 00,000 000

CI I Service vices s MP.

  • P. 319-326

326 To Total al Recon. n.

Fee: : $ 20,000 000,00 ,000

CI I Service vices s MP.

  • P. A3

A31-A44 44 TR TR (2 (2 cont ntr.) r.)

Fee: $10,000 ,000,000 ,000 each

CM MP.

  • P. 149-155

155 To Total al Recon

  • n.

Fee: $8,000, 000,000 000

slide-20
SLIDE 20

Op Open-End End Design sign (2 (2 cont ntra racts) cts)

Fee: $ 950,00 ,000 0 each each

Op Open-End End QA Ins nspe pection ction & & Te Testin ing

Fee: $ 1,500, 00,000 000

Op Open-End End CI I – West st (2 (2 con

  • ntracts)

tracts)

Fee: $1,500, 500,000 000 each

Op Open-End End Coat ating ing Cons nsult ultant ant

Fee: $1,500, 500,000 000

slide-21
SLIDE 21
slide-22
SLIDE 22

Gary L. Graham, am, P.E.

Assistant t Chief f Enginee eer – Design gn PA Turnpike ke Commiss ssion