SLIDE 1
2012 Ford Ave. Bridge on I-95 $ 5.8 million* 2012 S2 (Richlieu - - PowerPoint PPT Presentation
2012 Ford Ave. Bridge on I-95 $ 5.8 million* 2012 S2 (Richlieu - - PowerPoint PPT Presentation
Start Year Construction Section Actual*/Estimated Cost 2010 S1 (Galloway & BOV Bridges) $ 9.8 million* 2012 Advanced ITS $ 3.4 million* 2012 Ford Ave. Bridge on I-95 $ 5.8 million* 2012 S2 (Richlieu Road Bridge) $ 7.9
SLIDE 2
SLIDE 3
SLIDE 4
Go Goal: al: To To in incr crease ease the % o % of lane ne mil iles es to
- a min
inim imum um LOS ‘D’ in urban areas
SLIDE 5
- Ov
Overhead rhead Br Brid idges ges ne need d Repl placed aced Fir irst st
SLIDE 6
SLIDE 7
SLIDE 8
- 70 mph
ph Bl Blue ue Mou
- untain
ntain Tu Tunn nnel el to
- Mor
- rgantown
gantown In Int.
- 70 mph
ph systemwide emwide Spr prin ing g 2015
SLIDE 9
SLIDE 10
SLIDE 11
SLIDE 12
SLIDE 13
SLIDE 14
SLIDE 15
SLIDE 16
SLIDE 17
SLIDE 18
SLIDE 19
CM/C /CI I Tu Tuscarora arora Tu Tunn nnel el Rehab hab
Fee: $ 6,500, 00,000 000
CI I Service vices s MP.
- P. 319-326
326 To Total al Recon. n.
Fee: : $ 20,000 000,00 ,000
CI I Service vices s MP.
- P. A3
A31-A44 44 TR TR (2 (2 cont ntr.) r.)
Fee: $10,000 ,000,000 ,000 each
CM MP.
- P. 149-155
155 To Total al Recon
- n.
Fee: $8,000, 000,000 000
SLIDE 20
Op Open-End End Design sign (2 (2 cont ntra racts) cts)
Fee: $ 950,00 ,000 0 each each
Op Open-End End QA Ins nspe pection ction & & Te Testin ing
Fee: $ 1,500, 00,000 000
Op Open-End End CI I – West st (2 (2 con
- ntracts)
tracts)
Fee: $1,500, 500,000 000 each
Op Open-End End Coat ating ing Cons nsult ultant ant
Fee: $1,500, 500,000 000
SLIDE 21
SLIDE 22
Gary L. Graham, am, P.E.
Assistant t Chief f Enginee eer – Design gn PA Turnpike ke Commiss ssion