19 th & 20 th Avenues Two-Way Conversion Two-way Street Conversions in the St. Lukes TIF Area Project Update 7-26-16 Project ct Ov Over ervie view Convert 19 th and 20 th Avenues between Broadway and Park Avenue West to two-way


  1. 19 th & 20 th Avenues Two-Way Conversion Two-way Street Conversions in the St. Luke’s TIF Area Project Update 7-26-16

  2. Project ct Ov Over ervie view • Convert 19 th and 20 th Avenues between Broadway and Park Avenue West to two-way vehicular operation. • Convert Grant and Logan Streets between 18 th and 20 th Avenues to two-way vehicular operation. • Integrate enhanced bicycle facilities for the 19 th and 20 th Avenue corridors. • Provide traffic calming in an increasingly residential area. • Protect parking options to the greatest extent possible while prioritizing connectivity.

  3. Base se El Elements ts • Two-way conversion: • 19 th , 20 th , Grant, and Logan • Add bike facilities • Reconstruct 4 signals 19 th Avenue • Convert 5 intersections from signalized to stop- controlled • Add intersection 20 th Avenue bulb-outs

  4. Proje oject G t Goa oals • Enhance neighborhood character with consistent street patterns • Improve connectivity by linking and easing access to existing routes • Increase safety with enhanced bicycle and pedestrian facilities

  5. Enha nhancin ncing N g Nei eighb ghborh rhood d Cha haract cter more consistent street patterns • Existing Two-Way to Remain • Current One-Way, but Proposed Two-Way • Existing One-Way

  6. Improving C Connec ectivity bicycle network Connections with Project

  7. Incr creasin ing Sa Safety enhanced bike and pedestrian facilities

  8. Next S t Steps s - Des Design • 60% design to CCD for review • Ongoing coordination with planned development • Finalize proposed bus operations with RTD • Addition of metered/managed spaces in existing unmanaged blocks • Leverage other funding sources within the City to repave streets in conjunction with two-way conversion • Consider dropping posted speed limit in some or all of project area • Continue public outreach process

  9. Next S t Steps s - Constr truction

  10. Project ct C Conce ncept

  11. Project ct C Conce ncept

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.