1 TRANS-PENNINE HIGH SPEED RAIL THE ONLY WAY IS WOODHEAD Colin - - PowerPoint PPT Presentation

1 trans pennine high speed rail
SMART_READER_LITE
LIVE PREVIEW

1 TRANS-PENNINE HIGH SPEED RAIL THE ONLY WAY IS WOODHEAD Colin - - PowerPoint PPT Presentation

1 TRANS-PENNINE HIGH SPEED RAIL THE ONLY WAY IS WOODHEAD Colin Elliff BSc CEng MICE Civil Engineering Principal High Speed UK 2 Woodhead - the missing link SKIPTON AIREDALE SHIPLE SKIPTON- COLNE ROUTE LEEDS BRADFORD BLACKBURN


slide-1
SLIDE 1

1

slide-2
SLIDE 2

2

TRANS-PENNINE HIGH SPEED RAIL

THE ONLY WAY IS WOODHEAD

Colin Elliff BSc CEng MICE Civil Engineering Principal High Speed UK

slide-3
SLIDE 3

DEWSBURY BARNSLEY

SHEFFIELD

HUDDERSFIELD WAKEFIELD

LEEDS

BRADFORD HALIFAX

SHIPLE PENISTONE

ROTHERHAM BURNLEY BLACKBURN BOLTON ROCHDALE STOCKPORT

SKIPTON BUXTON

MARPLE PONTEFRACT CASTLE- FORD ACCRINGTON

AIREDALE

LONGDENDALE HYDE

GLOSSOP

ALTRINCHAM

CALDER VALLEY ROUTE DIGGLE ROUTE WOODHEAD ROUTE HOPE VALLEY ROUTE SKIPTON- COLNE ROUTE

PEAK DISTRICT NATIONAL PARK

SPEN VALLEY

VICTORIA FREIGHT ROUTE FROM WATH YARD

BURY OLDHAM

Woodhead - the missing link

3 MANCHESTER

slide-4
SLIDE 4

4

The Woodhead Line : decline and fall

  • 1970 – closed to

passengers

  • 1981 – closed to freight
  • Woodhead Tunnel

R.I.P.??

slide-5
SLIDE 5

5

The Woodhead Line : reawakenings??

Infrastructure intact:

  • Country trail?
slide-6
SLIDE 6

6

The Woodhead Line : reawakenings??

Infrastructure intact:

  • Country trail?
  • Reopening ambitions?

Central Railway Translink lorry shuttle

slide-7
SLIDE 7

7

  • Reqd for short-haul

Manchester-Sheffield

  • TranslinkUK scheme?
  • Concerns re viability
  • Loading gauge issues!

Lorry Shuttles via Woodhead

MA

MAN

SH LS

WOODHEAD TUNNEL

SK

LI

TranslinkUK

L

M60 M1 M62 M62

A616 M67

NATIONAL GRID CABLES

slide-8
SLIDE 8

8

The Woodhead Tunnel

  • Not a railway tunnel –

but a potential cable conduit!!

  • National Grid

controversy!!

slide-9
SLIDE 9

9

The Woodhead Tunnel

  • January 2008
  • ‘Save The Woodhead

Tunnel’ campaign

  • Questions asked in

Parliament

slide-10
SLIDE 10

High Speed North •Single east-sided

spine

  • Trans-Pennine spur

to Manchester & Liverpool

  • All primary centres

directly interlinked

  • Direct link to LHR

10

slide-11
SLIDE 11

HS2

No trans- Pennine link!!

11

slide-12
SLIDE 12

Trans-Pennine Communities

12

1.3M 2.2M 2.5M

DEWSBURY BARNSLEY

SHEFFIELD

HUDDERSFIELD WAKEFIELD

LEEDS

BRADFORD HALIFAX ROTHERHAM BURNLEY BLACKBURN BOLTON ROCHDALE OLDHAM ALTRINCHAM STOCKPORT HYDE ACCRINGTON BURY CASTLEFORD

MANCHESTER

MARPLE AIREDALE SPEN VALLEY LONGDENDALE PONTE- FRACT

PEAK DISTRICT NATIONAL PARK

slide-13
SLIDE 13

Trans-Pennine Beneficiaries

13

  • West Yorkshire

2.2M

  • South Yorkshire

1.3M

  • Greater Manchester

2.5M

  • Merseyside

1.4M

  • Hull/York

0.5M

  • Teesside

0.5M

  • Tyneside/Wearside

1.1M

  • Nottingham/Derby

1.5M 10.8M

slide-14
SLIDE 14

March 2010

HS2 ‘Y’

14

slide-15
SLIDE 15

June 2014

HS3!!

15

slide-16
SLIDE 16

Trans-Pennine rail links c.1963

16

DEWSBURY BARNSLEY

SHEFFIELD

HUDDERSFIELD WAKEFIELD

LEEDS

BRADFORD HALIFAX

SHIPLE PENISTONE

ROTHERHAM BURNLEY BLACKBURN BOLTON ROCHDALE STOCKPORT

SKIPTON BUXTON

MARPLE PONTEFRACT CASTLE- FORD ACCRINGTON

AIREDALE

LONGDENDALE HYDE

GLOSSOP

ALTRINCHAM

CALDER VALLEY ROUTE DIGGLE ROUTE WOODHEAD ROUTE HOPE VALLEY ROUTE SKIPTON- COLNE ROUTE

PEAK DISTRICT NATIONAL PARK

SPEN VALLEY

VICTORIA FREIGHT ROUTE FROM WATH YARD

BURY OLDHAM

MANCHESTER

slide-17
SLIDE 17

DEWSBURY BARNSLEY

SHEFFIELD

HUDDERSFIELD WAKEFIELD

LEEDS

BRADFORD HALIFAX

SHIPLE PENISTONE

ROTHERHAM BURNLEY BLACKBURN BOLTON ROCHDALE STOCKPORT

SKIPTON BUXTON

MARPLE PONTEFRACT CASTLE- FORD ACCRINGTON

AIREDALE

LONGDENDALE HYDE

GLOSSOP

ALTRINCHAM

CALDER VALLEY ROUTE DIGGLE ROUTE HOPE VALLEY ROUTE

PEAK DISTRICT NATIONAL PARK

BURY OLDHAM SPEN VALLEY

Trans-Pennine rail links - today

17 MANCHESTER

slide-18
SLIDE 18

Trans-Pennine Rail Issues

18

  • Journey times
  • Capacity
  • Passenger overcrowding
  • Restrictive gauge for freight
  • Resilience
  • Accessibility
  • Inclusivity
slide-19
SLIDE 19

DEWSBURY BARNSLEY

SHEFFIELD

HUDDERSFIELD WAKEFIELD

LEEDS

BRADFORD HALIFAX

SHIPLE PENISTONE

ROTHERHAM BURNLEY BLACKBURN BOLTON ROCHDALE OLDHAM STOCKPORT

SKIPTON BUXTON

MARPLE PONTEFRACT CASTLE- FORD ACCRINGTON

AIREDALE

LONGDENDALE HYDE

GLOSSOP

ALTRINCHAM

CALDER VALLEY ROUTE DIGGLE ROUTE HOPE VALLEY ROUTE

PEAK DISTRICT NATIONAL PARK

SPEN VALLEY

HS3??

BURY

HS3 initiative - 2014

19 MANCHESTER

slide-20
SLIDE 20

DEWSBURY BARNSLEY

SHEFFIELD

HUDDERSFIELD WAKEFIELD

LEEDS

BRADFORD HALIFAX

SHIPLE PENISTONE

ROTHERHAM BURNLEY BLACKBURN BOLTON ROCHDALE OLDHAM STOCKPORT

SKIPTON BUXTON

MARPLE PONTEFRACT CASTLE- FORD ACCRINGTON

AIREDALE

LONGDENDALE HYDE

GLOSSOP

ALTRINCHAM

CALDER VALLEY ROUTE DIGGLE ROUTE HOPE VALLEY ROUTE

PEAK DISTRICT NATIONAL PARK

SPEN VALLEY

HS3??

BURY

HS2 HS2

HS3 initiative – plus HS2

20 MANCHESTER

slide-21
SLIDE 21

DEWSBURY BARNSLEY

SHEFFIELD

HUDDERSFIELD WAKEFIELD

LEEDS

BRADFORD HALIFAX

SHIPLE PENISTONE

ROTHERHAM BURNLEY BLACKBURN BOLTON ROCHDALE OLDHAM STOCKPORT

SKIPTON BUXTON

MARPLE PONTEFRACT CASTLE- FORD ACCRINGTON

AIREDALE

LONGDENDALE HYDE

GLOSSOP

ALTRINCHAM

CALDER VALLEY ROUTE DIGGLE ROUTE HOPE VALLEY ROUTE

PEAK DISTRICT NATIONAL PARK

SPEN VALLEY

HS3??

BURY

HS2 HS2

Northern Powerhouse 2015

21 MANCHESTER

slide-22
SLIDE 22

DEWSBURY BARNSLEY

SHEFFIELD

HUDDERSFIELD WAKEFIELD

LEEDS

BRADFORD HALIFAX

SHIPLE PENISTONE

ROTHERHAM BURNLEY BLACKBURN BOLTON ROCHDALE OLDHAM STOCKPORT

SKIPTON BUXTON

MARPLE PONTEFRACT CASTLE- FORD ACCRINGTON

AIREDALE

LONGDENDALE HYDE

GLOSSOP

ALTRINCHAM

CALDER VALLEY ROUTE DIGGLE ROUTE HOPE VALLEY ROUTE

PEAK DISTRICT NATIONAL PARK

BURY SPEN VALLEY

The ‘One North’ View??

22 MANCHESTER

slide-23
SLIDE 23

DEWSBURY BARNSLEY

SHEFFIELD

HUDDERSFIELD WAKEFIELD

LEEDS

BRADFORD HALIFAX

SHIPLE PENISTONE

ROTHERHAM BURNLEY BLACKBURN BOLTON ROCHDALE OLDHAM STOCKPORT

SKIPTON BUXTON

MARPLE PONTEFRACT CASTLE- FORD ACCRINGTON

AIREDALE

LONGDENDALE HYDE

GLOSSOP

ALTRINCHAM

CALDER VALLEY ROUTE DIGGLE ROUTE HOPE VALLEY ROUTE

PEAK DISTRICT NATIONAL PARK

BURY SPEN VALLEY

‘One North’ Airport Link

23 MANCHESTER

slide-24
SLIDE 24

The ‘One North’ View??

24

slide-25
SLIDE 25

Journey Time Specification (1)

25

One North

slide-26
SLIDE 26

Journey Time Specification (2)

26

Northern Powerhouse

slide-27
SLIDE 27

MA

MAN

SH LS

WOODHEAD TUNNEL

LI

P C V L

SK

The High Speed UK Solution

27

High Speed UK

slide-28
SLIDE 28

MA

MAN

SH LS

WOODHEAD TUNNEL

LI

P C V L

SK

HSUK Journey Times

28

High Speed UK

HSUK

One North

MA-LS 25 30 MA-SH 20 30 MA-LI 19 20 SH-LS 17 30 LS- 36 30 + 10 SH- 29 30 LI- 25 30

slide-29
SLIDE 29

DEWSBURY BARNSLEY

SHEFFIELD

HUDDERSFIELD WAKEFIELD

LEEDS

BRADFORD HALIFAX ROTHERHAM BURNLEY BLACKBURN BOLTON ROCHDALE OLDHAM ALTRINCHAM STOCKPORT HYDE ACCRINGTON BURY CASTLEFORD M62 M18 M65 M66 M61 M56 A56T M62 A628T

MANCHESTER

MARPLE AIREDALE M60 M60 M67 SPEN VALLEY M62 M1 M1 LONGDENDALE

Trans-Pennine Road Connectivity

29

slide-30
SLIDE 30

DEWSBURY BARNSLEY

SHEFFIELD

HUDDERSFIELD WAKEFIELD

LEEDS

BRADFORD HALIFAX ROTHERHAM BURNLEY BLACKBURN BOLTON ROCHDALE OLDHAM ALTRINCHAM STOCKPORT HYDE ACCRINGTON BURY CASTLEFORD M62 M18 M65 M66 M61 M56 A56T M62 A628T

MANCHESTER

MARPLE AIREDALE M60 M60 M67 SPEN VALLEY M62 M1 M1 LONGDENDALE

Peak District Issues

30

PEAK DISTRICT NATIONAL PARK

slide-31
SLIDE 31

DEWSBURY BARNSLEY

SHEFFIELD

HUDDERSFIELD WAKEFIELD

LEEDS

BRADFORD HALIFAX ROTHERHAM BURNLEY BLACKBURN BOLTON ROCHDALE OLDHAM ALTRINCHAM STOCKPORT HYDE ACCRINGTON BURY CASTLEFORD M62 M18 M65 M66 M61 M56 A56T M62 A628T A57 A635 A623T

MANCHESTER

MARPLE AIREDALE M60 M60 M67 SPEN VALLEY M62 M1 M1 LONGDENDALE

Trans-Peak Roads

31

slide-32
SLIDE 32

32

Congestion on Woodhead Road

  • The problem:

> 15000 vehicles per day > 5M vehicles per year ~ 1.4M HGVs per year

  • HGVs 26% total

by number

  • HGVs 58% total

by length

slide-33
SLIDE 33

33

Mottram – Tintwistle Bypass

  • The road solution?? > £300M

Peak District National Park Swallows Wood Tunnel under Mottram Ridge

slide-34
SLIDE 34

34

Mottram – Tintwistle Bypass

  • Where next?? Trans-Peak Motorway??

Swallows Wood Tunnel under Mottram Ridge M6 in Lune Gorge M67 projections from ‘Pathetic Motorways’ website

slide-35
SLIDE 35

DEWSBURY BARNSLEY

SHEFFIELD

HUDDERSFIELD WAKEFIELD

LEEDS

BRADFORD HALIFAX ROTHERHAM BURNLEY BLACKBURN BOLTON ROCHDALE OLDHAM ALTRINCHAM STOCKPORT HYDE ACCRINGTON BURY PONTEFRACT CASTLEFORD M62 M18 M65 M66 M61 M56 A56T M62

MANCHESTER

MARPLE AIREDALE M60 M60 M67 SPEN VALLEY M62 M1 M1 LONGDENDALE

Trans-Peak Motorway??

35

M67 ??

slide-36
SLIDE 36

36

Mottram – Tintwistle Bypass

  • The railway alternative??

Peak District National Park Swallows Wood Tunnel under Mottram Ridge

Abandoned Woodhead Line

slide-37
SLIDE 37

DEWSBURY BARNSLEY HUDDERSFIELD WAKEFIELD

LEEDS

BRADFORD HALIFAX ROTHERHAM BURNLEY BLACKBURN BOLTON ROCHDALE OLDHAM ALTRINCHAM STOCKPORT HYDE ACCRINGTON BURY CASTLEFORD M62 M18 M65 M66 M61 M56 A56T M62 A628T A57 A635 A623T

MANCHESTER

MARPLE AIREDALE M60 M60 M67 SPEN VALLEY M62 M1 M1

HGV Bans & Lorry Shuttles

37

LONGDENDALE

SHEFFIELD

slide-38
SLIDE 38

38

Woodhead Reopening

Traffic type??

  • Lorry shuttles
  • Local passengers
  • Freight
  • High speed rail
slide-39
SLIDE 39

MA

MAN

SH LS

WOODHEAD TUNNEL

SK

LI

P C V L

M60 M1 M62 M62

Woodhead Lorry Shuttles

39

slide-40
SLIDE 40

MA

MAN

SH LS

WOODHEAD TUNNEL

LI

P

BY

C V

SK

L

GL

40

Woodhead Local Services

slide-41
SLIDE 41

MA

MAN

SH LS

WOODHEAD TUNNEL

SK

LI

P C V L

Trans-Pennine Railfreight

41

slide-42
SLIDE 42

High Speed UK

42

MA

MAN

SH LS

WOODHEAD TUNNEL

LI

P C V L

SK

slide-43
SLIDE 43

43

Woodhead Reopening

Traffic type??

  • Lorry shuttles
  • Local passengers
  • Freight
  • High speed rail

Infrastructure issues??

  • Tunnel
  • Abandoned approaches
  • Existing railway –
  • perational interface
slide-44
SLIDE 44

44

  • Speed: 125kph max in 1954 tunnel
  • Space: passing clearance for 2

wide-bodied double deck trains

  • Safety: evacuation requirements

for ‘new railway’!!

  • New / rebored tunnels essential

High Speed in Woodhead Tunnel??

slide-45
SLIDE 45

45

HSUK in Longdendale

Swallows Wood Tunnel under Mottram Ridge WCML in Lune Gorge HSUK route based on 1:25,000 mapping of HSUK network

  • Existing line also restored
  • Lorry ban on A628T
  • Cables buried
slide-46
SLIDE 46

46

Woodhead : Total Transport Solution

TRAIN PATHING ON WESTERN APPROACHES TO WOODHEAD

slide-47
SLIDE 47

47

Woodhead Reopening

Traffic type??

  • Lorry shuttles
  • Local passengers
  • Freight
  • High speed rail

Infrastructure issues??

  • Tunnel
  • Abandoned approaches
  • Existing railway –
  • perational interface

Local issues??

  • NP access
  • Cycle track on
  • ld railway
  • New railway

construction

slide-48
SLIDE 48

48

Woodhead Reopening

Traffic type??

  • Lorry shuttles
  • Local passengers
  • Freight
  • High speed rail

Infrastructure issues??

  • Tunnel
  • Abandoned approaches
  • Existing railway –
  • perational interface

Local issues??

  • NP access
  • Cycle track on
  • ld railway
  • New railway

construction National issues??

  • Fully connected rail network
  • Minimise cost, maximise benefit
  • Regional development
  • CO2 reductions as per 2008 CCA
  • Preservation of landscapes
slide-49
SLIDE 49 COLNE HEBDEN BRIDGE VICTORIA

BOLTON BLACKBURN BURNLEY OLDHAM ROCHDALE HYDE MARPLE ACCRINGTON

SALFORD TODMORDEN

BURY BRADFORD

SHIPLEY SKIPTON BUXTON

SHEFFIELD

AIREDALE ROTHERHAM HUDDERSFIELD

LEEDS

CASTLE- FORD LONGDENDALE WAKEFIELD

GLOSSOP

SPEN VALLEY

BRIGHOUSE SHIPLEY PENISTONE CLITHEROE SKIPTON STALYBRIDGE

BARNSLEY ALTRINCHAM

KIRKLEES INTERCHANGE PICCADILLY

PONTEFRACT DEWSBURY

GUIDE BRIDGE

STOCKPORT HALIFAX

HSUK network in Pennines

49

slide-50
SLIDE 50

HS2+3 HSUK

50

Network?

  • r HS line?
slide-51
SLIDE 51

51

Woodhead : Total Transport Solution

Lorry Shuttles

  • Essential for reduced road

traffic & alternative to M-T

  • Wider benefits across Peak

District with HGV ban strategy

  • Won’t fit tunnels
  • New alignment required

alongside existing railway

  • Major costs

Container / Railfreight

  • Essential to meet wider

transport/environment aims

  • No major infrastructure

requirements

High Speed Rail

  • Woodhead key to cost-

effective national network

  • Environmental gains optimised
  • Won’t fit tunnels
  • New alignment required

alongside existing railway

  • New construction in National

Park

Local Passenger Services

  • Essential for local support
  • No major infrastructure

requirements but…

  • Safety case concerns in 1954

tunnel

slide-52
SLIDE 52

52

Woodhead : Total Transport Solution

Lorry Shuttles

  • Essential for reduced road

traffic & alternative to M-T

  • Wider benefits across Peak

District with HGV ban strategy

  • Won’t fit tunnels
  • New alignment required

alongside existing railway

  • Major costs

Container / Railfreight

  • Essential to meet wider

transport/environment aims

  • No major infrastructure

requirements

High Speed Rail

  • Woodhead key to cost-

effective national network

  • Environmental gains optimised
  • Won’t fit tunnels
  • New alignment required

alongside existing railway

  • New construction in National

Park

Local Passenger Services

  • Essential for local support
  • No major infrastructure

requirements but…

  • Safety case concerns in 1954

tunnel

WOODHEAD

INTEGRATED TRANSPORT DEVELOPMENT

NET ENVIRONMENTAL IMPROVEMENT

NEW NETWORK CAPACITY

LOWER CO2

slide-53
SLIDE 53

53

House of Lords Report 25/3/15

slide-54
SLIDE 54

Key Question for Government:

54

House of Lords Report 25/3/15

National Transport Plan

In the absence of a co-ordinated transport plan, how can the Government be sure that HS2 is the best way to achieve the project’s objectives?

slide-55
SLIDE 55

NTP Key Principles for HS National Network:

  • All primary cities fully interlinked
  • Services at hourly or better frequencies
  • All second tier cities included in network
  • Full interchange with local networks
  • Direct services from primary cities to

national hub airport

  • Direct services also to regional airports
  • Direct connection to Europe via HS1

55

House of Lords Report 25/3/15

slide-56
SLIDE 56

NTP Key Principles for HS National Network:

  • All primary cities fully interlinked
  • Services at hourly or better frequencies
  • All second tier cities included in network
  • Full interchange with local networks
  • Direct services from primary cities to

national hub airport

  • Direct services also to regional airports
  • Direct connection to Europe via HS1

56

House of Lords Report 25/3/15

slide-57
SLIDE 57

NTP Key Principles for HS National Network:

  • All primary cities fully interlinked
  • Services at hourly or better frequencies
  • All second tier cities included in network
  • Full interchange with local networks
  • Direct services from primary cities to

national hub airport

  • Direct services also to regional airports
  • Direct connection to Europe via HS1

57

House of Lords Report 25/3/15

slide-58
SLIDE 58

NTP Key Principles for HS National Network:

  • All primary cities fully interlinked
  • Services at hourly or better frequencies
  • All second tier cities included in network
  • Full interchange with local networks
  • Direct services from primary cities to

national hub airport

  • Direct services also to regional airports
  • Direct connection to Europe via HS1

58

House of Lords Report 25/3/15

slide-59
SLIDE 59

NTP Key Principles for HS National Network:

  • All primary cities fully interlinked
  • Services at hourly or better frequencies
  • All second tier cities included in network
  • Full interchange with local networks
  • Direct services from primary cities to

national hub airport

  • Direct services also to regional airports
  • Direct connection to Europe via HS1

59

House of Lords Report 25/3/15

slide-60
SLIDE 60

NTP Key Principles for HS National Network:

  • All primary cities fully interlinked
  • Services at hourly or better frequencies
  • All second tier cities included in network
  • Full interchange with local networks
  • Direct services from primary cities to

national hub airport

  • Direct services also to regional airports
  • Direct connection to Europe via HS1

60

House of Lords Report 25/3/15

slide-61
SLIDE 61

NTP Key Principles for HS National Network:

  • All primary cities fully interlinked
  • Services at hourly or better frequencies
  • All second tier cities included in network
  • Full interchange with local networks
  • Direct services from primary cities to

national hub airport

  • Direct services also to regional airports
  • Direct connection to Europe via HS1

61

The New Exam Questions!!

slide-62
SLIDE 62

HS2+3 HSUK

62

PASS FAIL The New Exam Questions

slide-63
SLIDE 63

NTP Public Policy Issues:

  • Inclusivity
  • Value for money
  • Promote integrated transport
  • Prioritise town centres (TCPA)
  • Promote regional development
  • Protect rural communities/landscapes
  • Reduce transport CO2 in line with 2008

Climate Change Act

More Exam Questions!!

slide-64
SLIDE 64

64

Roadmap to 2050??

x-factor

BEHAVIOURAL SHIFT Cars 52.5% LGVs 15.2% HGVs 19.8% 140

MT

??

MT

??

MT

TECHNO SHIFT

y-factor z-factor

MODAL SHIFT Cars LGVs HGVs 28

MT

Rail Bus Rail 1.7% Air 1.5%

Domestic aviation virtually eliminated

Bus

5.0-reduction factor x y z * *

slide-65
SLIDE 65

65

Fourfold Increase in Rail Traffic??

33%

MODAL SHIFT FROM ROAD TO RAIL??

FOURFOLD

RAIL TRAFFIC INCREASE

DOMESTIC AVIATION VIRTUALLY ELIMINATED, TRANSFER TO RAIL

Cars 46% LGVs 13% HGVs 17%

28

MT Rail 12% Bus

FURTHER MODAL SHIFT FROM ROAD TO BUS (OR TRAM/ LIGHT RAIL)??

52.5% 15.2% 19.8%

140

MT

1.5% AIR 1.7% RAIL 3.7%

FURTHER MODAL SHIFT FROM ROAD TO CYCLING & WALKING?? CONJECTURAL

2050

EMISSIONS SPLIT @ 20% OF CURRENT EMISSIONS CURRENT

2011

EMISSIONS SPLIT BROWN ARROWS ILLUSTRATE TARGET EMISSIONS

slide-66
SLIDE 66

66

Solution: 2 new tracks parallel to all main lines?

Distance

(km)

Freight @ 125 kph Stopping regional service @ 160 kph,

  • ccasional

20 40 60 100

Express passenger @ 200 kph

Time

(min)

15 potential express paths per hour

8

trains per hour Practicable capacity on 2-track mixed traffic railway EXISTING 2-TRACK MIXED TRAFFIC RAILWAY

slide-67
SLIDE 67

67

Solution: 2 new tracks parallel to all main lines?

HIGH SPEED LINE BUILT PARALLEL TO EXISTING RAILWAY

Time

(min)

15 potential high speed paths per hour

20 40 60

Distance

(km)

100

High speed passenger train @ 300 kph 15 potential freight paths per hour

Distance

(km)

Freight @ 125 kph Stopping regional service @ 160 kph

20 40 60 100

Time

(min)

15

trains per hour Practicable capacity on 2-track high speed line

11

trains per hour Practicable regional/freight capacity on classic line

slide-68
SLIDE 68

HS2+3 HSUK

68

PASS FAIL More Exam Questions

slide-69
SLIDE 69

69

.

And finally… Dateline 20??...

slide-70
SLIDE 70

70

.

And finally… The Payback??...

And can I please have my fiver for every ton of CO2 I save??