1 Our r goal is to get feedback on our current permitting process - - PowerPoint PPT Presentation

1
SMART_READER_LITE
LIVE PREVIEW

1 Our r goal is to get feedback on our current permitting process - - PowerPoint PPT Presentation

1 Our r goal is to get feedback on our current permitting process and requirements and understand what could or should be improved. 2 - Albert Einstein 3 Cur urrent Requi quirements Permitting requirements have been unchanged since


slide-1
SLIDE 1

1

slide-2
SLIDE 2

2

Our r goal is to get feedback on our current permitting process and requirements and understand what could or should be improved.

slide-3
SLIDE 3
  • Albert Einstein

3

slide-4
SLIDE 4

Cur urrent Requi quirements

Permitting requirements have been unchanged since incorporation.

slide-5
SLIDE 5
  • Johns Creek City Council

5

slide-6
SLIDE 6

Cur urrent Requi quirements

  • 1. Addition
  • 2. Administrative
  • 3. Deck
  • 4. Demolition
  • 5. Electrical
  • 6. Fence
  • 7. Interior Remodel
  • 8. Mechanical
  • 9. Meter Base
  • 10. New Commercial Bldg.
  • 11. Plumbing
  • 12. Pool
  • 13. Residing
  • 14. Retaining Wall
  • 15. Roof
  • 16. SF Attached (new home)
  • 17. SF Detached (new home)
  • 18. Sign – Banner
  • 19. Sign - Monument
  • 20. Sign - Wall
  • 21. Storage Shed
  • 22. Water Heater
slide-7
SLIDE 7

Addition, Administrative, Deck, Demolition, Electrical, Interior Remodel, Mechanical, Meter Base, New Commercial Bldg., Plumbing, Pool, Retaining Wall, Roof (commercial), SF Attached (new home), SF Detached (new home), Sign – Monument, Sign – Wall, Storage Shed, and Water Heater 1. Fence 2. Residing 3. Roof (residential) 1. Sign – Banner

BA BASIS

7

slide-8
SLIDE 8

Those contractors and homeowners performing construction work are still required to comply with the state adopted codes but no permits are required and no inspections are done Those performing the work are required to comply with the codes and the City verifies contractor licenses and work with a permitting and inspection process to enforce the codes Those performing the work are required to comply with state license requirements, state codes plus more stringent (stricter) amendments and the City verifies with a permitting and inspections process

OP OPTION IONS

8

slide-9
SLIDE 9

Ar Around the St State

9

slide-10
SLIDE 10

Ins Inspe pections ns

10

slide-11
SLIDE 11

11

11

Wa Water Heaters

Effects of a 5 gallon water heater explosion at Avon High School on 05/11/2000 in Massachusetts Effects of a residential water heater explosion in Beaufort County, Washington on 04/10/2013

slide-12
SLIDE 12

12

12

De Deck cks

Effects of deck collapse in Lake County, Montana on 06/19/2017 Effects of deck collapse in Calhoun, Georgia on 11/28/2015

slide-13
SLIDE 13

13

13

Re Retaining Walls

Effects of retaining wall failure in Forsyth County, Georgia (Publix off McGinnis Ferry) on 04/12/2017

slide-14
SLIDE 14

14

14

Ele Electric ctrical al

Effects improper electrical wiring in Waynesboro, Georgia on 12/07/2017 Effects of improper electrical wiring in Cobb County, Georgia on 10/28/2017

slide-15
SLIDE 15

Ask the Expert: Experts available to answer specific questions or talk scenarios Things to Keep: which activities do you think should require a permit? Proposed Removals: staff suggested eliminating three, what are your thoughts? Other Adjustments: what other changes would you recommend? Suggestion Sheet: blank slate, what do we need to know?

Fe Feedback