wyoming blvd improvements alameda blvd to beverly hills
play

WYOMING BLVD IMPROVEMENTS ALAMEDA BLVD TO BEVERLY HILLS AVE CPN - PowerPoint PPT Presentation

WYOMING BLVD IMPROVEMENTS ALAMEDA BLVD TO BEVERLY HILLS AVE CPN 741380 DEPARTMENT OF MUNICIPAL DEVELOPMENT ENGINEERING DIVISION SEPTEMBER 5, 2019 PRE-SUBMITTAL MEETING PROJECT LOCATION SEPTEMBER 5, 2019 WYOMING BLVD IMPROVEMENTS ALAMEDA


  1. WYOMING BLVD IMPROVEMENTS ALAMEDA BLVD TO BEVERLY HILLS AVE CPN 741380 DEPARTMENT OF MUNICIPAL DEVELOPMENT ENGINEERING DIVISION SEPTEMBER 5, 2019 PRE-SUBMITTAL MEETING

  2. PROJECT LOCATION SEPTEMBER 5, 2019 WYOMING BLVD IMPROVEMENTS – ALAMEDA BLVD TO BEVERLY HILLS AVE

  3. PROJECT BACKGROUND SEPTEMBER 5, 2019 WYOMING BLVD IMPROVEMENTS – ALAMEDA BLVD TO BEVERLY HILLS AVE

  4. PROJECT SCHEDULE & FUNDING  Design Completion  Fall 2020  Construction Completion  Fall 2022  Locally Funded  Anticipated Construction Cost  $2,000,000 SEPTEMBER 5, 2019 WYOMING BLVD IMPROVEMENTS – ALAMEDA BLVD TO BEVERLY HILLS AVE

  5. EXISTING CONDITIONS  Incomplete Pavement Sections  Vertical grade issues at intersections  Typical section inconsistent  Sight distance issues at intersections  Curb & Gutter  Striping  Poor Pavement Condition  Incomplete Pedestrian Facilities  Sidewalk  Curb Ramps  Incomplete Bicycle Facilities  Storm Drainage Infrastructure  Poor Lighting SEPTEMBER 5, 2019 WYOMING BLVD IMPROVEMENTS – ALAMEDA BLVD TO BEVERLY HILLS AVE

  6. EXISTING CONDITIONS SEPTEMBER 5. 2019 WYOMING BLVD IMPROVEMENTS – ALAMEDA BLVD TO BEVERLY HILLS AVE

  7. EXISTING CONDITIONS SEPTEMBER 5. 2019 WYOMING BLVD IMPROVEMENTS – ALAMEDA BLVD TO BEVERLY HILLS AVE

  8. EXISTING CONDITIONS SEPTEMBER 5. 2019 WYOMING BLVD IMPROVEMENTS – ALAMEDA BLVD TO BEVERLY HILLS AVE

  9. EXISTING CONDITIONS SEPTEMBER 5. 2019 WYOMING BLVD IMPROVEMENTS – ALAMEDA BLVD TO BEVERLY HILLS AVE

  10. EXISTING CONDITIONS SEPTEMBER 5. 2019 WYOMING BLVD IMPROVEMENTS – ALAMEDA BLVD TO BEVERLY HILLS AVE

  11. EXISTING CONDITIONS SEPTEMBER 5. 2019 WYOMING BLVD IMPROVEMENTS – ALAMEDA BLVD TO BEVERLY HILLS AVE

  12. PROJECT SCOPE DESIGN AND CONSTRUCTION PHASE SERVICES  DAR  Bicycle Facilities  Roadway Section  Right of Way Acquisition  Geotechnical Analysis  Lighting Improvements  Pavement Design  Pedestrian Accessibility  Landscaping irrigation sleeving  ADA Compliant Sidewalk and Curb Ramps  Utility Relocations  Storm Drainage Analysis  Public Involvement  Modify Existing  Add New Infrastructure  Project Coordination  SUE  Bid Phase Services SEPTEMBER 5, 2019 WYOMING BLVD IMPROVEMENTS – ALAMEDA BLVD TO BEVERLY HILLS AVE

  13. PROPOSAL INFORMATION  Due Tuesday October 1, 2019 before 3:00PM Selection Advisory Committee Office: Capital Implementation Program (CIP) Division Office One Civic Plaza 7 th Floor, Room 7057 Albuquerque/Bernalillo County Government Center Albuquerque, New Mexico 87102  No proposals will be accepted after the time specified. SEPTEMBER 5, 2019 WYOMING BLVD IMPROVEMENTS – ALAMEDA BLVD TO BEVERLY HILLS AVE

  14. CONTACT INFORMATION  Project Manager:  Jill Cuppernell  Email: jcuppernell@cabq.gov  Office: (505) 768-3502  Selection Advisory Committee Administrator:  Myrna Marquez  Email: myrnamarquez@cabq.gov  Office: (505) 768-3821 SEPTEMBER 5, 2019 WYOMING BLVD IMPROVEMENTS – ALAMEDA BLVD TO BEVERLY HILLS AVE

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend