WHRPG GREEN ELECTRICITY GENERATION (WHRPG) PT SEMEN INDONESIA - - PowerPoint PPT Presentation

MANFAATAN GREEN ELECTRICITY WASTE HEAT RECOVERY FOR POWER WHRPG GREEN ELECTRICITY GENERATION (WHRPG) PT SEMEN INDONESIA (PERSERO) TBK MENUJU INDUSTRI BERWAWASAN LINGKUNGAN PT SEMEN INDONESIA (PERSERO) Tbk. ` SEMEN PADANG SEMEN


slide-1
SLIDE 1

1

MANFAATAN “GREEN ELECTRICITY” WASTE HEAT RECOVERY FOR POWER GENERATION (WHRPG)

MENUJU INDUSTRI BERWAWASAN LINGKUNGAN

PT SEMEN INDONESIA (PERSERO) Tbk.

1

`

SEMEN PADANG SEMEN GRESIK SEMEN TONASA TLCC

Together We Build A Better Future

WHRPG “GREEN ELECTRICITY”

PT SEMEN INDONESIA (PERSERO) TBK

slide-2
SLIDE 2

Together We Build A Better Future  1957 : Inauguration of Gresik I, installed capacity of 250,000 ton cement per annum  1991 : Initial Public Offering, Market Cap.: IDR0.63tn, resulting shareholding structure post IPO:

  • Government of Republic of Indonesia: 73%
  • Public: 27%

 1995 : Acquisition of PT Semen Padang (Persero) and PT Semen Tonasa (Persero)  1998 : Cemex became a strategic partner, Market Cap.: IDR4.9tn  2006 : Blue Valley Holdings bought Cemex’s 24.9% stake in SMGR, Market Cap.: IDR21.5tn  2010 : In March 31, Blue Valley Holdings sold all of its stake ownership in SMGR, Market Cap per April 30, 2010: IDR72.1tn  2012 : Acquisition of Thang Long Cement Vietnam, Total installed capacity of 2.3mm tons, Market Cap Dec 19th, 2012: IDR91.9tn  2013 : PT Semen Gresik (Persero) Tbk transformed by changing the corporate name to PT Semen Indonesia (Persero) Tbk.

BRIEF HISTORY OWNERSHIP STRUCTURE

Public (48.99%) The Government of the Republic of Indonesia (51.01%)

PT Semen Indonesia (Persero) Tbk. PT Semen Padang PT Semen Tonasa Thang Long Cement, VN

slide-3
SLIDE 3

3

  • Design Capacity

: 106.3 mt

  • Production Capacity: 74.0 mit
  • Domestic Growth

: 5.0%

  • Domestic Utilization: 70%
  • Supply
  • Domestic

: 69 mt

  • Export

: 5 mt

  • Import

: 3 mt

Domestic Capacity (2017)

2017F

  • 1. Semen Indonesia

35.5 mt

  • 2. Indocement TP

24.9 mt

  • 3. Lafarge Holcim Indonesia 14.5 mt
  • 4. Semen Merah Putih

7.5 mt

  • 5. Semen Bosowa

7.0 mt

  • 6. Semen Anhui Conch

4.5 mt

  • 7. Semen Baturaja

3.8 mt

  • 8. Semen Pan Asia

1.9 mt

  • 9. Siam Cement Group

1.8 mt

  • 10. Semen Jui Shin

1.5 mt

  • 11. Semen Serang (Haohan)

1.2 mt

  • 12. Semen Jakarta

1.0 mt

  • 13. Semen Hippo (Sun Fook)

0.6 mt

  • 14. Semen Kupang 0.3 mt
  • 15. Semen Puger 0.3 mt

TOTAL 106,3 mio ton

slide-4
SLIDE 4

4

Project Waste Heat Recovery Power Generation Location Tuban, East Java Capacity Expected Max 30,6 MW Investment USD 60 Million GHG Scheme

JCM (Joint Crediting Mechanism)

USD 11 Million (Committed/subsidy)

Emission Reduction Expected 122,000 - 150,000 t-CO2/y Special Note One of the first JCM project Japan - Indonesia Progress Construction (2015 – 2017)

slide-5
SLIDE 5

5

  • Jan 2014: Preliminary Design
  • Ags 2014, Contract Signed
  • Juni 2015, Main Equipt First Shipment (FOB)
  • Sep 2015, Main Eq First Erection
  • Feb 2016, Main Eq Last Shipment

Construction Completion, Juni 2017 ▪ Commissioning Finish, January 2018 ▪

  • Okt 2014, Ground Breaking  Pondasi SP Boiler Tuban 4

Project Effective date

  • Maret 2015, Main Engineering finished  JFE

a). Civil Construction finished b). Main Equipt delivery c). Mech. Construction started a). Plant Site Ready b). Main Equipment Contract c). Foreign Engineering by JFE Commercial, March 2018 ▪

slide-6
SLIDE 6

6

slide-7
SLIDE 7

7

Clinker Production Process Waste : (A) 288.000 x 2 (Pre Heater) + (B) 245.000 (Cooler)

Waste Heat Recovery System : 1. Power (design) : 30.6 MW 2. Reduce CO2 : 122,358 Ton/year

Hot Gas : Q : 245.000 Nm3/h T : 325 C

Hot Gas : Q : 288.000 x 2 Nm3/h T : 400 C

Power : 30.6 MW SUB X1V FINISH MILL

slide-8
SLIDE 8

8

A B C D

E(A*B*C*D)

Quantity of Electricity Generation Generation Capacity (MW) Operating day per year (days/y) Time (hrs/day) Operating Rate Electricity (MWh)

Dry Season 28 164.5 24 1 110,544 Rainy Season 22 164.5 24 1 86,856 The quantity of electricity consumption 3.69 365 24 1 32,324 The quantity of net electricity generation by the WHR system which replaced grid electricity import 165,076

REy = EGy * EFgrid = 165,076 MWh/y * 0.903 tCO2 e/MWh = 149,063 tCO2e/y

slide-9
SLIDE 9

9

Contract Formation on JCM

JCM Agreement JCM Subsidy from Japan International Consortium

Japanese Government Indonesian Government

GHG Reductions

 Construction  Operation  Maintenance  MRV  Engineering  Equipment Supply

Semen Indonesia’s Budget

slide-10
SLIDE 10

10

1 STG SYSTEM Remarks PRICE Foreign JPY 2.788 bil Major Equipment Supply Portion (Boiler, Turbine Generator, Control System & Air Cooling System, etc

  • Eq. to IDR 312.3 bil

IDR 4 bil For erection and Commisioning Local IDR 328.6 bil Estimated Budget for local Mechanical & Electrical installation, Civil Buidling, Local fabrication, Dust Conveying, Water Treatment Plant TOTAL IDR 644.9 bil Subsidy JPY 1,061,644,000 (IDR 118.9 bil) Nett investasi = Rp 526M

slide-11
SLIDE 11

11

Steam Turbine & Generator AQC Boiler Area SP Boiler Air Cooled Condenser BOILER

Air Cooled Condenser Turbine Generator

TG House

slide-12
SLIDE 12

12

slide-13
SLIDE 13

13

slide-14
SLIDE 14

14

Th Thank ank You... u...